Presentation is loading. Please wait.

Presentation is loading. Please wait.

ASEAN PBN Routes Objectives:

Similar presentations


Presentation on theme: "ASEAN PBN Routes Objectives:"— Presentation transcript:

1 ASEAN PBN Routes Objectives:
Performance-based navigation distinguishes between RNAV and RNP Specifications, both of which rely on area navigation techniques which allow aircraft to operate on any desired flight path within the coverage of station-referenced navigation aids or within the limits of the capability of self-contained aids, or a combination of these. This is an interim objective aimed towards establishing a global performance-based navigation (PBN) environment. Individual States, ANSPs, airports and aircraft operators will need to evaluate the business need for RNAV5/RNP2 procedures according to local circumstances. PBN Routes to enhance en-route efficiency and increase airspace capacity.

2 ATS Routes serving Major Aerodromes should be transited to PBN Route
ASEAN PBN Routes ATS Routes serving Major Aerodromes should be transited to PBN Route Initial Step: PBN POCs (subject matter experts) Applicability Area: En-route Time scale: Phrase 1: 1/1/ /12/2020 (RNAV5 or RNP2?) Phrase 2: 1/1/2018 – 31/12/2020 (RNP2)

3 ASEAN PBN Routes Factors affected:
Cost & Benefit Analysis (economy study) CNS Equipage Ops approval Training Safety assessment Reference from the Current Implementation Baseline (major City-pairs) Separation minima (on routes connecting major city-pairs)

4 ASEAN PBN Routes Reference: ASEAN ATM Master Plan
Applicable legislation/working group: 1. ASBU 2. ICAO Doc 93 3. PBNICG

5 Stakeholders Lines of Actions
No Stakeholders Actions Timeline 1 Regulators - Need to Publish the PBN specifications in the AIP, - Operational approvals - Expresses their concerns through the national airspace policy/ATM Plan on the noise abatement and CO2 emission. -20xx- 20xx 2 ANSP - ATC training & Procedures - Navigational infrastructure - WGS-84 survey - Harmonization of the CNS capability (OEMs) 3 Airlines - Aircraft Equipage - Crew Training - Safety Assessment 4

6 Roadmap NAVAID Infras Ops Approval Switch to RNP2 RNP2 2018 2019
2020 (RNAV5-RNP2) based on 2021 RNP2 2022(RNP2) Roadmap


Download ppt "ASEAN PBN Routes Objectives:"

Similar presentations


Ads by Google