“ ” Presentation of mep works in high rise buildings.

Slides:



Advertisements
Similar presentations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Advertisements

PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Green Initiatives Throughout Green-collar job training – Enhance, Expand, Develop, Sustain Green practices in facilities and center culture – Construction,
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
Engineer Presentation
MEP PROVISIONS HIGH RISE COMMERICAL BUILDING- GREEN APPROACH
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
How to use the DEEP LeCCATo Life Cycle Costing Tool DEEP Life Cycle Cost Analysis Tool How to use the tool The DEEP Toolkit. TOOL 2.b.Life Cycle Cost Analysis.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
We Are Not Alone.... HVAC Contractor OwnerEngineer Commissioning Agent Plumbing Contractor Electrical Contractor ArchitectOccupant Operations and Maintenance.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Air Movement and Natural Ventilation
Computer Control.
1 Lamp operating factor Published lumen output is based on laboratory conditions Voltage  Rated at line voltage of 115V Standard reactor ballast  Electromagnetic.
To reduce negative environmental impacts. To move towards more natural habitats. To reduce operating costs. To enhance building marketability. To improve.
Wireless Sensing and Control of the Indoor Environment in Buildings  Objective: Develop techniques to improve building operation through intensive wireless.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Edexcel BTEC Level 2 Diploma in Construction Influencing Factors Unit 3 Sustainability in the Construction Industry.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
HVAC Energy Efficiency using Mass Flow and Building Pressurization Jay Richardson Professional Supply, Inc.
Architecture Supported by:
Free Air Cooling for Data Centres
Green Building: What does the Fourth Little Pig Need to Know Before Choosing a Green Home.
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
Sustainability Assessment of Family House - Case Study
The Principles of Green Remodeling
Objectives of a Green Building
FIRE PROTECTION & SECURITY in ELI Beamlines
Technological Design Sustainable Construction
Heating Ventilation and Air Conditioning
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
RESIDENTIAL HVAC (HEAT LOSS & GAIN)
Green Building and Sustainable Architecture
Thermal Energy Storage
Section 3: Using Thermal Energy
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Electrical Gas Plumbing Heating & Cooling
5.3 notes What are the first and second laws of thermodynamics?
Pre-Contract Cost Control
Renovation of Russell Apartments Design & Green Charrette
BEEP Integrated Design Process for Energy Efficient Buildings
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
29 CFR NFPA Life Safety Code
Green Building and Sustainable Architecture
M&E SYSTEM.
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Concept of Energy Efficiency
2 Days National Workshop on “National Building Code of India 2016 ”
Heating Ventilation and Air Conditioning
BUILDING SCIENCE-1 TOPIC- ROLE OF WARM AND HUMID CLIMATE
The Engineering and Maintenance Division
Firefighting equipment
FBE03: Building Construction & Science
HVAC consulting companies can improve your Building Essentials with HVAC Design & Build Solutions.
Green Building and Sustainable Architecture
Smokes extraction principle
Prasanna Narangoda MSc, Bsc (Eng) Hons, C Eng MIESL, MASHRAE, APGBCSL, MLABSE 1 Delivered to UNIVOTEK 22 nd June 2019.
Presentation transcript:

“ ” Presentation of mep works in high rise buildings

PROVISIONS OF MEP SERVICES IN HIGHRISE HIGH RISE COMMERICAL BUILDING- ALONG WITH GREEN APPROACH

High rise Commercial Building Energy performs a critical role in the development and financial development of a country. Around 40% of total strength produced is ate up with the aid of buildings. In a traditional industrial building, annually round 30% strength is bump off through the HVAC systems. The regular effectively of thermal energy plant is around 30%. It skill that rest of 70% exhaust to the surroundings in the form of heat.

imagine you are in an architecturally well designed and constructed building. The building has no lighting, and no applicable ventilation, no lifts, no plumbing, absence of security and security systems. Which capability you are inside a non inhabitable concrete structure, in different phrases you are in a 21st Century cave. Everything inner a constructing which makes you blissful is known as 'Building services'. A building should supply the relief to cease user - now not just grant shelter but additionally to provide the remedy where humans can live, work and enjoy.

construction technology is what makes a building come alive. These include: energy supply: gas, electricity and renewable sources for adequate ventilation, water supply, sewer and natural light and artificial lighting, elevators for movement. WLN for ventilation and cooling of solar, wind and biomass energy, such as telephone and entertainment. CCTV security. Fire alarm and security detection Air conditioning and refrigeration These systems must be designed by an appropriate MEP.

Green building  A diagram which presents and endorses the belief of protected dwelling of the human kind.  The distinction between a green and sustainable plan is the degree to which the format helps to hold ecological balance, and to grant power saving in terms of water and power savings.

 A inexperienced constructing is the one that gives excessive performance, over the full existence cycle of the constructing in the following areas:  Minimizing natural sources consumption such as, water and building materials, along want zero energy consumption by means of the use of on hand natural recourses.  Minimizing emission that have an impact on surroundings and the ecosystem.  Minimizing discharge of strong waste and liquid effluents, along with demolition and occupant waste, sewer, and storm water and the associated infrastructure such as S/T/P/ and many others  Minimal negative affects on web site ecosystems.  Maximum excellent of indoor environment, inclusive of air quality, thermal regime, illumination, acoustics/noise, and visual aspects to provide comfortable human physiological perceptions.  While the sustainability is “ offering for the needs of the existing besides detracting from the potential to fulfill the wants of the future”.

GREEN INTIATIVE  Green initiatives require proper undertaking group with the precise intentions. they have to achieve dedication from the proprietor and early acceptable documentation of sustainable/green goals. The plan crew ought to record the layout groundwork file to be the profitable green project.  Design must be consists of certain ones. Proactive proprietors who are willing to execute the whole spectrum of ownership.  Green structures are the one which emphasis on built-in format of mechanical, electrical, architectural and different systems.

MEP Provisions in High rise building. In a building MEP execution came into at a very advanced stage and final until the remaining handing over of the building to user. At the early phases of development architects, and structural engineers require input from MEP engineers to hold the provisions for MEP machine in the buildings.

System Selection FOR MEP Common requirements of excessive upward jostle and low upward shove buildings Environment Power & Communication Network Plumbing Utilities Fire Alarm and Fire Fighting System Earthling machine and protection Specific requirements of excessive rise buildings Fire get away system. Vertical transportation and garbage chutes Equipment placement and provisions for future maintenance and replacement Lightening arrestor. Compound illumination

Usual Requirements  Environment  Temperature, Humidity, Air motion, Air purity or quality, Air modifications per hour, air and water velocity requirements, nearby climate, house strain requirements, capability requirements, security concerns, running cost, protection cost, reliability etc.

Power and communication network  Power and Communication Network Commercial structures are normally multi person in nature where requirement varies from user to consumer Sufficient provisions has to be saved now not solely to cater the estimated electricity requirements but also for the future modifications and additions. Communications network need to be open protocol

Plumbing Water Supply distribution booster machine v/s gravity based totally tank supply. Provisions of pressure reducers and Isolation valves Filling arrangement for overhead tank. Balcony/trace drain, roof drains Centralized ingesting water device

Fire Fighting & Alarm System.This has to be designed according to NBC 2019 and CFO conditions. Fire zoning and cubicles Sprinkler system with area manipulate valves Fire hose cabinets for occupants Wet Risers/Fire hose cabinets for fire fighters Centralized Fire Alarm device in fire rated conduits External Fire evacuation lifts for high upward jab buildings greater than 90 mtrs.

Earthling System  Earthling System  System earthling network to be supplied at areas as per MEP consultant.  Body earthling for central tools  NBC 2019 AND relevant IS codes ought to be observed  Security  CCTV  digital get entry to to a variety of areas to be provided  Parking administration system

Specific Requirements  Mode of fire escape  Fire safety code analysis to be conducted  Fire cubicles to be described in the mild of furnace protection code evaluation  Fire escapes to be provided with perfect markings  External hearth evacuation lift has to be provided.  Fire break out routes need to be pressurized and must have two hours furnace rated partitions and doors or as prescribed by way of CFO.  Smoke extract machine to be furnished

Vertical Transportation Traffic learn about tube carried out to define the volume and capacity of lifts Staircases to be furnished alongside with furnace break out floors as defined through the CFO. Separate and committed fire raise has to be provided Garbage chute Sufficient variety and size of garbage chute to be supplied

 Utilities network and management for MEP  Sufficient head room to be furnished to installation the ducting, piping, cable tray, lights etc.  Sufficient number and size of shafts to be furnished  The vertical shaft size for services in high-rise building is fairly large than low upward push building as it is now not solely to installation the carrier however additionally for regular renovation has to be to kept

Multiservice Rooms It is critical to preserve the Multiservice Rooms for HVAC equipment, statistics rooms, electrical rooms at the central region as it reduces the head room requirements and grant evenly distribution of services. Passage for the gear motion from outdoor to the Multiservice Rooms ought to be viewed at preliminary stage. Provision for future elimination and everyday preservation to be provided Lightening safety to be provided as per NBS and CFO guidelines; Façade lighting fixtures to be supplied as per the elevation diagram by the architects

System Constraints  Once the ultimate preferences are listed, many constraints must be determined and documented. These constraints many encompass the following:  Performance limitations  Available potential  Available house  Available utility sources  Available infrastructure  Building structure

Constructability constraints  MEP gadget issues must be taken into account earlier than the assignment reaches the construction phase. Some of these constraints which may affect the success of the sketch and can't be not noted in the format phase. Some issues and worries associated with constructability are as follows:  Existing conditions  Maintaining current constructing occupancy and operation  Construction price range  Construction schedule  Ability to section machine installation  Equipment availability (i.e. shipping lead times)

Sustainability  Sustainable energy consumption can be compromised and long term project success can be lost in case of the end user are not trained to operate and maintain the building systems.

Thank you for watching this presentation  Kindly subscribe, like and share which will motivate me for further good presentation.  In case of any quarries do not hesitate to write to me. the response shall be at the earliest Contact me   2. at my telegram group  Ask srini telegram group  Link