Linac4 Connection Broken Line 07/08/19

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Construction and Installation of the CLIC Experimental Area
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Update on the Laser Beam Line
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
S A Griffiths CM42 June 2015 Electrical & Control.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review
CBETA Technical Review
Update on the Critical Path of the PS Booster Schedule for the EYETS
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
EHN1 Extension planning
ELENA installation and commissioning status
San Luis Potosi – New plant April 24th 2015
LIU – EVM status and next steps
CMS Area Working Group Meeting
LHC Experimental Vacuum Systems Status October ‘07
CE Status: Activities executed until 03/08 and ongoing
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
352MHz Klystron Control for the 3MeV Linac test stand
RWTCS Steering Commitee
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS PS + PS SWY + TT2 Facility Coordinator:
Status of the cryogenic system for B180
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Installation of Photon Beam Transport to FEH
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Hardware Commissioning
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

Linac4 Connection Broken Line 07/08/19 Rescheduling of the installation of the LT.QFW70 in June/July after civil engineering intervention on the wall close to LT.QDN65 NO IMPACT on the schedule Cooling works: to complete on 14th August at the latest RISK to IMPACT the schedule: tests and commissioning to be performed next week must be compatible with scheduled actvitities Smoothing: 3 weeks allocated in September IMPACT on the schedule: rescheduling of the hardware commissioning Installation of the BLM postponed in August due to the asbestos cleaning NO IMPACT on the schedule Installation of the LBS ongoing but LBS.BVT10 not ready on time MINOR IMPACT on the schedule BE-BI (SEM Grids): not ready for installation before September RISK to IMPACT the schedule

Linac4 Connection Linac4 side Completion of the Linac4 transfer line L4T Completion of the beam line sectors 6 : completed Survey measurement of the overall Linac4 and transfer line completed Smoothing of the overall Linac4 and transfer line will start started – to be completed in September (weeks 37-38-39) 3MeV beam tests ongoing until 23th August Any additional activities must be announced and evaluated if compatible with the smoothing No activities on the beam line to keep references for smoothing No access No co-activities

Linac4 Connection Linac4 side

Linac4 Connection Linac2 rack room side Reconfiguration of the racks room Cabling campaign completed Installation of the new demineralized water cooling pipes below the false floor in progress Installation of the false floor slabs completed Reinstallation of the stairs completed EN-EL-ENP activities being completed this week Individual system tests of the power converters start next week Any additional activities must be announced and evaluated if compatible with the tests No activities

Linac4 Connection Linac2 tunnel side Reconfiguration of the Linac2 Cables connection completed Installation of the new access safety system completed Installation of the new demineralized water cooling pipes in progress – to be completed this week. Tests and Commissioning to be performed at the latest until 14th August but must be compatible with activities scheduled next week

Linac4 Connection PS Switch Yard side Reconfiguration of the beam lines Cabling campaign starts completed (additional activities to replace the DC cables) Installation of the new crane completed Installation of the new metallic platform completed Refurbishment of the floor and painting completed (Re-)installation of the beam line starts in progress Re-installation of beam line equipment on LT completed and LTB being completed (remain vacuum pipe and MSFH/V40) Alignment LT completed, LTB completed, LBE in progress Vacuum connection, pumping and leak detection in progress Measurement and Smoothing start next week

Linac4 Connection PS Switch Yard side SEM Grids installation delayed Positioning of the cables can start now as all supports are installed  can impact the ISTs

Linac4 Connection PS Switch Yard side Status of the BI line: girder installed – can we complete the installation on it? Status of the LBS line: end line installed, vacuum equipment being installed – can we install the LBS.BVT10?