Optimization for Sustainable Water Resources

Slides:



Advertisements
Similar presentations
China: Water Management and Accounting Project May 22-24, 2006 Hague.
Advertisements

Water policy development in Uganda
Water Demand Management Role Play Regional Training of Trainers Workshop National Water Resources Institute, Kaduna, Nigeria 6 – 10 December 2004 West.
URBAN AND NATURAL ENVIRONMENT CONSULTANTS European Commission 6 th Framework Programme for research and Technological Development Optimisation For Sustainable.
Dokuz Eylul University Water Resources Management Research and Application Center SMART Sustainable Management of Scarce Resources in the Coastal Zone.
DOKUZ EYLUL UNIVERSITY WATER RESOURCES RESEARCH and APPLICATION CENTER Tınaztepe Campus, Buca, Izmir, Turkey The Case of the Gediz River in Turkey.
Optimization for Sustainable Water Resources
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
National Water Resources Authority Integrated Water Resources Management Program (UNDP funded program) Eng. Qahtan Al-Asbahi Program Officer Water Resources.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
Water resources management in the island of Crete: present situation, problems and perspectives NAGREF, Institute for Olive Tree and Subtropical Plants,
WATER ISSUES IN THE EASTERN EUROPE:
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
IWRM as a Tool for Adaptation to Climate Change
Demands, Supplies & Priorities. Demand Sectors Irrigation Livestock Mining Industrial Commercial Ecosystems Domestic Total Water Demand Major Cities.
National Policy Dialogue in Ukraine on Integrated Water Resources Management First meeting of the Steering Group (Kiev, 25 April 2008)‏ Nataliia Zakorchevna.
SMART, Egypt Case Study Grenoble, Jan.,2005 Mohamed El Raey CEDARE.
Main components of an action Plan Frezghi Irénée Martijn.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
ASEAN WORKING GROUP ON WATER RESOURCES MANAGEMENT (AWGWRM)
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management Turkish Stakeholder Meeting April 2006 IZMIR.
Guidelines for Integrated Water Resources Management (IWRM) at The River Basin Level (IRBM) Dr. Huseyin Gundogdu, Dr. Murat Hatipoglu, Taner Kimence (Agr.
1 «Existing situation, plans and policies for the wastewater reuse in agriculture in Cyprus, Jordan and Palestine» KONSTANTINOS MOUSTAKAS NTUA PhD Candidate.
Workshop on Water Resources Demand Management Learning Forum for Irrigation GROUP II July 2011 JW Mariott Hotel Bangkok, Thailand.
OPTIMA October 2004 WP01 Requirements and constraints.
CLIMATE CHANGE AND WATER MAKING RIVER BASIN MANAGEMENT PLANS “CLIMATE PROOF” IN SPAIN.
Roberta Camera Valerie Cogan Beirut 12 | 06 | 03 Requirements and Constraints Analysis D01.1.
ASEAN WORKING GROUP ON WATER RESOURCES MANAGEMENT (AWGWRM) Presentation On “Action Plans And Strategies Related to IWRM in ASEAN Countries” - MONITORING.
OPTIMA Optimisation for Sustainable Water Resources Management October 28, 29 th 2004 Malta kick-off meeting National Centre for Remote Sensing - TUNISIA.
INTEGRATED WATER RESOURCES MANAGEMENT IN HAI BASIN OF CHINA BY LIPING JIANG WORLD BANK OFFICE BEIJING PRESENTED IN THE WORLD BANK WATER WEEK FEBRUARY 17-19,
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
URBAN WATER MANAGEMENT TO ACHIEVE SUSTAINABLE WATER QUALITY AND CONSERVATION OUTCOMES.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
Ecologic.eu Brussels, 19 March 2009 Environmental & economic impact of water pricing and quotas in the agriculture sector What do we learn from practical.
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
Group Work IWRM Integrated River Basin Management.
OPTIMA OPTIMA Optimisation for Sustainable Water Resources Management The Case of the Gediz River in Turkey 28–30 October 2004 Senglea, MALTA.
California Water Briefing APRIL 2006 Department of Water Resources.
15.4 Human Influences on the Hydrologic Cycle Runoff and the infiltration rate are greatly influenced by human activity. A major concern in many urban.
Climate Change Impacts on Water Resources and Human Livelihoods in the Coastal Zones of Small Island Developing States (CASCADE) Project Stakeholder Panel.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Road map hydrology and water allocation SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning in Turkey.
Water Management in Spain Teodoro Estrela Júcar River Basin Authority, Spain.
CASE STUDY: LITANI LOWER BASIN Progress Gumpoldskirchen May 2006.
Collection and use of data on Water Abstraction and Use in Georgia Mariam Makarova, Head of Water Resources Management Division, Ministry of Environment.
India Irrigation Forum (IIF) 7 April, new DELHI needs & objectives of iif to meet sustainable development goal in India Dr Ajay Pradhan india.
Computer applications to water resources management
Concepts in Water Resources Management
Water Statistics and Water Account in Jordan
Water Statistics and Water Account in Jordan
Viet Nam Water Management Country Status Factsheet
Drought Management and Water Scarcity Adaptation
IMPLEMENTATION OF ARTICLE 9
Guatemala Water Management Country Status Factsheet
WaterWare description
Ghana Water Management Country Status Factsheet
Policy review of the WS&D Policy
A Blueprint to safeguard Europe’s Water Resources
A Blueprint to safeguard Europe’s waters
Fitness Check EU Water Policy
Hydrology CIVL341 Introduction
Water Accounting - Introduction
Aquaculture: part of the problem or part of the solution?
Presentation of Jordan Case Study Second Management Board Meeting
Andrea Tilche Unit Head of the Water Key Action
WP01 Water issues Izmir | 04 | 05.
WP01 Requirements and Constraints Report
OPTIMA INCO-MPC Management Board Meeting, April 1/2 2005, Izmir
Water Resources Management: concepts, tools, and applications
Presentation transcript:

Optimization for Sustainable Water Resources Lebanon Case Study The Lower Litani River Basin First Management Board Meeting ELARD in cooperation with NCRS Izmir April 1 and 2, 2005 Environmental and Water Resources Management Consultants Lebanese National Center for Remote Sensing

OUTLINE Status of Stakeholders Involvement Issues Questionnaire Data Collection Progress Model Tools and Scenarios OPTIMA - Lebanon Case Study

Status of Stakeholders Involvement Major Stakeholders were identified (<Stakeholders-general list-Lebanon>) Not fully taken into account in D01 Still need to identify key communities to be involved and other major water users (farmers COOPs) Key stakeholders are already involved in the project (Litani River Authority (GOV), NGOs, MoE) Next steps: Introducing remaining stakeholders to project (letters, issues questionnaires, interviews) Local participatory workshop (?) OPTIMA - Lebanon Case Study

Issues Questionnaires Already tested by: ELARD and NCRS LRA (GOV) Amwaj of Environment (NGO) Comprehensiveness Data availability (?) (under Water management) R&D (under water management) DSS (?) (under Water management) OPTIMA - Lebanon Case Study

Issues Questionnaires (2) Clarity: Water scarcity Coastal interaction Coexistance of public and private responsibility, privatization Gender issues Technology and investments Development of demand (generic) Household/Tourism/Agriculture/Industrial Water Quality under Water Demand Shipping and flooding (under Water demand, other uses) OPTIMA - Lebanon Case Study

Issues Questionnaires (3) Structure: Water scarcity under physical conditions (?) or under Water Supply (as water availability)? Separate groundwater availability and quality Separate Standards and Quotas Water Quality Issue within Demand and Supply Why not as a stand-alone category (in order to address key issues affecting water quality)? OPTIMA - Lebanon Case Study

Issues Questionnaires (4) Comparative Analysis Not applicable Marginal Important Very important 1. PHYSICAL CONDITIONS 1.1 WATER SCARCITY PRIV GOV NGO 1.2 FLOODS AND DROUGHTS ALL 1.3 GROUNDWATER AVAILABILITY AND QUALITY GOV (avail.) GOV (qual.) PRIV NGO 1.4 WATERSHED DEGRADATION GOV NGO PRIV 1.5 COASTAL INTERACTION OPTIMA - Lebanon Case Study

OPTIMA - Lebanon Case Study Not applicable Marginal Important Very important 2. WATER MANAGEMENT 2.1 INSTITUTIONAL FRAMEWORK 2.1.1 Conflict and fragmentation of competences between institutions, overlap and conflicts ALL 2.1.2 Participation in water management - mechanisms, fora, active use NGO GOV PRIV 2.1.3 Coexistence of public and private responsibility, privatization 2.2 REGULATORY FRAMEWORK 2.2.1 Standards and quotas PRIV GOV NGO 2.2.2 Water rights and conflict resolution 2.3 WATER PRICING POLICIES 2.4 EDUCATION AND AWARENESS 2.5 GENDER ISSUES GOV NGO PRIV 2.6 TECHNOLOGY AND INVESTMENTS OPTIMA - Lebanon Case Study

OPTIMA - Lebanon Case Study Not applicable Marginal Important Very important 3. WATER DEMAND 3.1 DEVELOPMENT OF DEMAND (GENERIC) NGO GOV 3.1.1 Population growth (general) NGO PRIV 3.1.2 Urbanisation, land use change PRIV GOV NGO 3.1.3 Economic development (tourism, industry) 3.2 HOUSEHOLD 3.2.1 Water quantity 3.2.2 Water quality 3.2.3 Water technologies OPTIMA - Lebanon Case Study

OPTIMA - Lebanon Case Study 3.3 TOURISM 3.3.1 Water quantity ALL 3.3.2 Water quality GOV PRIV NGO 3.3.3 Water technologies 3.4 AGRICULTURE 3.4.1 Water quantity 3.4.2 Water quality 3.4.3 Water technologies (irrigation efficiency) 3.5 INDUSTRY 3.5.1 Water quantity 3.5.2 Water quality GOV NGO PRIV 3.5.3 Water technologies (efficiency, recycling, reuse, BAT) 3.6 OTHER USES (environment, shipping, flood control) 3.6.1 Environmental water allocation GOV 3.6.2 Shipping 3.6.3 Flooding OPTIMA - Lebanon Case Study

OPTIMA - Lebanon Case Study 4. WATER SUPPLY 4.1 QUANTITY PRIV GOV NGO 4.2 QUALITY 4.2.1 Surface water ALL 4.2.2 Groundwater NGO GOV PRIV 4.3 ACCESSIBILITY 4.3.1 Households (availability of piped water) 4.3.2 Tourism 4.3.3 Agriculture 4.3.4 Industry 4.4 INFRASTRUCTURES 4.4.1 Water abstraction and storage, reservoirs, water harvesting GOV 4.4.2 Sewer system, water treatment and discharges 4.4.3 Water distribution networks (canals and pipes), losses 4.4.4 Preservation of natural resources OPTIMA - Lebanon Case Study

Data Collection and Availability Identification: Lower Litani River Basin, South Lebanon Description: Coastal southern Lebanon along Eastern Mediterranean Sub-Basin Area: 600 km2 Elevations from 0 to 600 m amsl Average annual precipitation: 700 mm Over 100 springs and increasing number of groundwater wells Around 120 towns and a total population of about 300,000 persons OPTIMA - Lebanon Case Study

Data Collection and Availability (2) Location: GIS data and satellite imagery are available OPTIMA - Lebanon Case Study

Data Collection and Availability (3) Basin: High-resolution DEM is available OPTIMA - Lebanon Case Study

Data Collection and Availability (4) Land-use: OPTIMA - Lebanon Case Study

Data Collection and Availability (5) Meteorology: Data available from the Lebanese Meteorological Service Annual total/average precipitation and temperature; min/max/average, monthly total/average time series of daily values are available Number of relevant stations being checked with LMS (limited number of stations – 1 or 2) Hydrology: Data available from the Litani River Authority OPTIMA - Lebanon Case Study

Data Collection and Availability (6) Monitoring infrastructure: Major limitation with respect to water quality monitoring No systematic monitoring of groundwater levels No monitoring/measurement of water consumption (metering systems) No systematic monitoring available other than hydrological and meteorological data Water budget: Precipitation = 282 million m3/year Evapo-transpiration = 143 million m3/year Runoff = 43 million m3/year River discharge = 130 million m3/year Different uses = 66 million m3/year Groundwater storage = 100 million m3/year OPTIMA - Lebanon Case Study

Data Collection and Availability (7) Structures: One major reservoir: Markaba No water/wastewater treatment plants available Water resources: More than 70% of water consumption goes to irrigation No environmental water use Main source of water supply is from surface water No unconventional sources Domestic distribution networks need upgrading Irrigation networks are still deficient and need to be implemented No treatment facilities OPTIMA - Lebanon Case Study

Data Collection and Availability (8) Demography: Total population 300000 Urban/rural National 87% urban Local 76% urban Family size National 5 Local 7 Growth rate 1.9% Migration 18% among youth OPTIMA - Lebanon Case Study

Modeling Basic review and initiation to manuals Effective start after long expected modeling training workshop OPTIMA - Lebanon Case Study

OPTIMA - Lebanon Case Study