Case Study: Lebanon Water Works Presentation 2: Source Water & Intakes 3/23/2010 Case Study: Lebanon Water Works CJ Bailey Drinking Water Technical Assistance Kentucky Division of Water
Overview Lebanon WTP Turbidity numbers DBP numbers Lebanon Water Works Marion County Water District
Lebanon Water Works Surface Water Plant Two sources: Rolling Fork River Fagan Branch Lake Design Capacity: 3,600 gpm/5.2 MGD Operate 16-18 hrs per day Average production for June 2018 was 2.5 MGD System population of 7,000
Lebanon Water Works Sells to Marion County Water District System population 16,000 For June 2018 Lebanon Water Works: Produced 76 MG Sold 37 MG to Marion Co WD
Lebanon Water Works Conventional Plant Flocculators: 2 train with 3 units each Sedimentation: 4 trains Filtration: 8 mixed media filters Two clearwells on site (0.6 MG storage) Three storage tanks (total storage 2 MG) Chlorine for disinfection
Lebanon Water Works Plant operations: Turbidity focused prior to 2016 Facility participated in Modular DSO Sept. 2015 and Sept. 2016 TOC/turbidity removal focused after DSO
OAS 2016
OAS 2017
OAS 2018
Lebanon TTHM 2015-2018
Lebanon HAA5 2015-2018
MCWD TTHM 2015-2018
MCWD HAA5 2015-2018
Presentation 2: Source Water & Intakes Thank You! 3/23/2010 CJ Bailey cj.bailey@ky.gov 270-384-4734