PAR Extension Motions Date: Authors: July 2016 Name Company

Slides:



Advertisements
Similar presentations
IEEE mc Closing Report for March 2015
Advertisements

Doc.: IEEE /0695r0 Report May 2015 Dorothy Stanley, Aruba NetworksSlide 1 IEEE mc Closing Report for May 2015 Date: Authors:
Doc.: IEEE /0693r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Doc.: IEEE /0472r1 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Doc.: IEEE /1585r0 Submission Nov 2011 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /1185r0 Submission Sep 2012 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /1419r2 Submission Nov 2012 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /1462r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOKoden Techno Info.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
Doc.: IEEE /0163r0 Submission Jan 2013 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
IEEE TGa Project Timeline
IEEE TGai Closing Report
IEEE TGai Closing Report
IEEE ai Fast Initial Link Setup Motions for comment resolution
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
<month year> doc.: IEEE ptc November 2013
IEEE ai Fast Initial Link Setup Motions for comment resolution
IEEE TGai Closing Report
IEEE TGai Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE ai Fast Initial Link Setup Agenda for July 2016 San Diego
Submission Title: [Proposed project timeline]
IEEE Fast Initial Authentication Study Group Closing Report
IEEE TGai Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
May 2013 doc.: IEEE /xxxxr0 January 2015 Motion #8: PAR
TGs Montreal Closing Report
IEEE ai Fast Initial Link Setup Agenda for Sep 2016 Warsaw
IEEE Fast Initial Authentication Study Group Closing Report
Dec 2008 doc.: IEEE /0xxx Nov aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Graham Smith,
TGaf Geneva Closing Report
HTC 34; 5656 AE Eindhoven, the Netherlands
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
QoSMAN SG Closing Report – Sept 2009
Submission Title: [Proposed project timeline]
IEEE TGai Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
802.11bd Timeline Date: Authors: January 2019
IEEE Fast Initial Authentication Study Group Closing Report
IEEE TGai Closing Report
IEEE TGai Closing Report
QoSMAN SG Closing Report – Nov 2009
Motion Deck BCS TIG/SG Date: Authors: September 2018
July 2010 Closing Plenary Motions
IEEE SGa Project Timeline
Submission Title: [Proposed project timeline]
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
S1G Closing Report – May 2010 Date: Authors: May 2010
November 2010 Closing Report
IEEE ai Fast Initial Link Setup Agenda for July 2015 Waikoloa
TGaf Orlando Closing Report
TGaq Closing Report Date: Authors: July 2016 July 2016
Submission Title: [Proposed project timeline]
TGn Closing Report – September 24 ‘09
IEEE mc Closing Report for September 2015
IEEE mc Closing Report for September 2016
IEEE TGai Closing Report
IEEE mc Closing Report for May 2016
TGbd Closing Report – Vietnam
Presentation transcript:

PAR Extension Motions Date: 2016-07-24 Authors: July 2016 Name Company doc.: IEEE 802.11-16/xxxxr0 July 2016 PAR Extension Motions Date: 2016-07-24 Authors: Name Company Address Phone email Marc Emmelmann SELF Berlin, Germany emmelmann@ieee.org Marc Emmelmann (SELF) Marc Emmelmann, SELF

July 2016 doc.: IEEE 802.11-16/xxxxr0 July 2016 Abstract This submissions contains motions to assist TGai in extending the PAR. Marc Emmelmann (SELF) Marc Emmelmann, SELF

Timeline PAR Approved, Modified, or Extended 2010-12-08 July 2016 doc.: IEEE 802.11-16/xxxxr0 July 2016 Timeline PAR Approved, Modified, or Extended 2010-12-08 WG Letter Ballots Initial / Recirc Mar14/Sep14/Jan15/ Mar15/Jul15/Aug15 MEC Done Nov14 Form Sponsor Ballot Pool / Reform Mar15 IEEE-SA Sponsor Ballots Initial / Recirc Sep 15/Mar 16/Aug 16 Sep 16/Oct 16 Final 802.11 WG Approval Sep 16 final or Conditional 802 EC Approval Oct 4th, 2016 (telco) RevCom & Standards Board Final or Continuous Process Approval Dec 16 Need to be in SB on Oct 17 final SB on draft unchanged. Note: Aug16 recirc to make final technical changes (D9.0) based on comment resolutions this week Sep 16 (D10.0) only changes due to merging REVmc Oct 16 (D10.0-unchanged) recirc of unchanged draft Marc Emmelmann (SELF) Marc Emmelmann, SELF

Motion (TGai Time Line approval) July 2016 Motion (TGai Time Line approval) Move to approve the timeline as shown in 11-16/0990r0. Moved: Ping Fang Secoded:George Calev Result:5/0/1 Marc Emmelmann (SELF)

Motion (Re-approval of 5C) July 2016 Motion (Re-approval of 5C) Believing that the Five Criteria contained in the document referenced below meets IEEE 802 guidelines, Request that the Five Criteria contained in 11-10/1153r0 be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval. Moved: Ping Fang Seconded:Hitoshi Morioka Result:7/0/0 Marc Emmelmann (SELF)

Motion (approval of PAR extension) July 2016 Motion (approval of PAR extension) Believing that the PAR extension contained in the document referenced below meets IEEE-SA guidelines, Request that the PAR extension contained in 11-16/0991r0 be posted to the IEEE 802 Executive Committee (EC) agenda for approval to submit to NesCom. Moved:Ping Fang Seconded:George Calcev Result y/n/a :8/0/0 Marc Emmelmann (SELF)