Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE TGai Closing Report

Similar presentations


Presentation on theme: "IEEE TGai Closing Report"— Presentation transcript:

1 IEEE 802.11TGai Closing Report
April 2009 doc.: IEEE /xxxxr0 May 2011 IEEE TGai Closing Report Date: Authors: Name Company Address Phone Hiroshi MANO ROOT Inc. 8F TOC2 Bldg Nishi-Gotanda, Shinagawa-ku, Tokyo JAPAN Marc Emmelmann Fraunhofer FOKUS Kaiserin-Augusta-Alle Berlin Germany Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion

2 April 2009 doc.: IEEE /xxxxr0 May 2011 Abstract This presentation is the closing report for the Palm Springs meeting of the IEEE TGai. Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion

3 Agenda for this week Palm Springs, May 2011
doc.: IEEE /xxxxr0 May 2011 Agenda for this week Palm Springs, May 2011 Official time slot Monday PM2,EVE Tuesday AM1, EVE Thursday AM1,PM2 Goals for the Meeting: Review and Approve the Singapore and Teleconference meeting minutes Presentation of submissions Approve a use case scenario documentation Approve a functional requirement documentation TIME line of task group Plan for July & Teleconference Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

4 Accomplishments TGai 1/2
May 2011 Accomplishments TGai 1/2 Reviewed and Approved the Singapore and Teleconference meeting minutes Approved Use Case Scenario documentation Approved TGai requirement documentation Approved Process for creating TGai draft Approved Weekly Teleconference schedule Approved Plan for July Discussion and approve Evaluation methodology Submission of Initial technical contribution General submission Hiroshi Mano (Root Inc.)

5 Accomplishments TGai 2/2
May 2011 Accomplishments TGai 2/2 Submission of Presentation 0619/00 Use case: network mobility / Jihyun Lee (LG Electronics) 0746/00 Discussion on How Many APs to Cover/ Dwight Smith (Motorola Mobility) 0238/17 Use-Case-Reference-List-for-TGai / Tom Siep (CSR) 0750/01 Use-Case-Document-Definitions /Tom Siep (CSR) 0739/01 HIP DEX for Fast Initial Authentication in /Konstantinos Georgantas, (Helsinki Institute for Information Technology) 0756/00 IP address assignment in FIA/ Robert Moskowitz (Verizon) 0797/00 Use Case: Mobile hotspot / Jhyun Lee (LG) 0745/05 TGai Functional Requirements / Marc Emmelmann (Fraunhofer FOKUS & Root ) 0748/04 process-for-Creating-TGai-Draft / Tom Siep (CSR) Hiroshi Mano (Root Inc.)

6 Approve TGai meeting minutes of Singapore face-to-face meeting.
May 2011 Approve TGai meeting minutes of Singapore face-to-face meeting. Motion: Approve TGai Meeting Minutes for the IEEE March 2011 Plenary : March 2011 Singapore session minutes, 11/ ai-march-2011-singapore-session-minutes.doc Approved Hiroshi Mano (Root Inc.)

7 May 2011 Approve TGai teleconference meeting minutes of Singapore to Palm Springs meeting. Motion: Approve TGai teleconference meeting minutes of Singapore to Palm Springs meeting.: March-May Teleconference Minutes, 11/ ai-march-may-teleconference-minutes.doc Approved Hiroshi Mano (Root Inc.)

8 Motion to approve use case reference
May 2011 Motion to approve use case reference Move to accept all changes in and upload the revised document as rev 18 to the server , accept use case reference list . Mover : Tom Siep (CSR) Second : Dwight Smith (Motorola Mobility) Result passed Hiroshi Mano (Root Inc.)

9 Motion Move to add an additional “Mobile Hotspot Use Case” as per slide 3 and 4 of r0 to the TGai Use Case Document ( r18) Moved: Eunsun Kim Seconded: Lee Armstrong Y-N-A: motion passes

10 Motion to approve requirement document
May 2011 Motion to approve requirement document Move to accept all changes in and upload the revised document as rev 05 to the server , accept as TGai requirement document. Mover : Lee Armstrong (DoT) Second :Dwight Smith (Motorola Mobility) Result passed Hiroshi Mano (Root Inc.)

11 Motion to approve Process for creating TGai draft
May 2011 Motion to approve Process for creating TGai draft Move to accept all changes in and upload the revised document as rev 03 to the server , accept Process for creating TGai draft. Mover : Lee Armstrong (DoT) Second : Tom Siep (CSR) Result : passed Hiroshi Mano (Root Inc.)

12 April 2009 doc.: IEEE /xxxxr0 May 2011 Time line of TGai PAR Approved, Modified, or Extended [Expires] WG Letter Ballots Initial / Recirc Mar 12 / Jul 12 Form Sponsor Ballot Pool / Reform Jan 13 MEC Done Jan13 IEEE-SA Sponsor Ballots Initial / Recirc Mar13/ Jun13 Final WG Approval Jan 14 final or Conditional 802 EC Approval Jan 14 RevCom & Standards Board Final or Continuous Process Approval Mar14 ANSI Approved N/A Hiroshi Mano (Root Inc.) Rich Kennedy, Research In Motion

13 Teleconference Schedule
May 2011 Teleconference Schedule Motion: Approve the following schedule of weekly teleconferences. Tuesdays 09:00 EDT (NY Time) continue from 17th May. Duration 1Hour Using WEB-EX that will be provided by Task Group Chair Moved:Tom Siep(CSR) , Seconded:Lee Armstrong (DoT) Result: passed Hiroshi Mano (Root Inc.)

14 Documents Approved Minutes Approved Use Case Reference List
May 2011 Documents Approved Minutes March 2011 Singapore session minutes, 11/ ai-march-2011-singapore-session-minutes.doc March-May Teleconference Minutes, 11/ ai-march-may-teleconference-minutes.doc Approved Use Case Reference List use case reference list, 11/ ai-use-case-reference-list-for-tgai.docx requirement documentation, 11/ ai-tgai-functional-requirements.docx process for creating tgai draft, /11/ ai-process-for-creating-tgai-draft.pptx Hiroshi Mano (Root Inc.)

15 Thanks to all who participated!
May 2011 Thanks to all who participated! Hiroshi Mano (Root Inc.)


Download ppt "IEEE TGai Closing Report"

Similar presentations


Ads by Google