TTA Activities on IMT-Advanced standardization

Slides:



Advertisements
Similar presentations
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Advertisements

DOCUMENT #:GSC15-PLEN-15 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Opening Plenary 6.1 TD-SCDMA & TD-LTE Standard and.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
DOCUMENT #:GSC15-PLEN-14 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.1 CONTACT(S):Asok Chatterjee
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration Updated CCSA Activities on IMT Standardization and industry in China Ke Wang, CCSA Document.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT CJK activities on WPT Standardization Mr. YJ CHUNG (TTA) on behalf of CJK-WPT WG* Document No: GSC17-PLEN-24.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities on IMT Standardization LEE HyeonWoo Chair of TTA PG701 Document No: GSC17-PLEN-21r2 Source:
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
5GCOM Report to Board# review and 2017/2018 objectives
ITU-R Ad-Hoc Contact person
ITU-R Liaison Group Report - Session #68 Opening Plenary
Month Year doc.: IEEE yy/xxxxr0 November 2017
TTA activities on IMT-Advanced Standardization
IMT-2020 Contribution Content
IMT-Advanced Opening Report
TTA activities on IMT-Advanced
TTA activities and Future Direction
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
ATIS Activities on IMT Standards
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
Update ARIB Activities on IMT Standardization
Update ARIB Activities on IMT Standardization
Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB
Update ARIB Activities on IMT Standardization
IEEE IMT-Advanced Review Process
François Rancy Director, ITU Radiocommunication Bureau
GSC IMT Task Force Report
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IMT-Advanced Technical Requirements
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
Update of ARIB Activities on IMT Standardization
GSC IMT Task Force Report
CJK activities on WPT Standardization
IEEE IMT-Advanced Review Process
IMT-Advanced Opening Report
Status report from ITU-R WP 5A on ITS activities
ITS Task Force Report Takeshi YAMAMOTO ARIB GSC17-PLEN-82r2
GSC IMT Task Force Report
TTA activities on IMT Standardization
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
18 March Agenda Opening comments and attendance
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
GSC IMT Task Force Report
TTA activities on IMT-Advanced Standardization
Paths to 5G Date: Authors: Name Affiliations Address Phone
Paths to 5G Date: Authors: Name Affiliations Address Phone
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
Presentation transcript:

TTA Activities on IMT-Advanced standardization Global Standards Collaboration (GSC) 14 DOCUMENT #: GSC14-PLEN-050 FOR: Presentation SOURCE: TTA, Korea AGENDA ITEM: 6.1 CONTACT(S): Daejung Kim(kdj@tta.or.kr) TTA Activities on IMT-Advanced standardization DJey KIM (kdj@tta.or.kr) TTA Geneva, 13-16 July 2009

Highlight of Current Activities ITU-R WP5D invited technology submission for IMT-Advanced standards. 3GPP and IEEE presented their intention to submit LTE-Adv. and IEEE 802.16m during past WP5D meetings through initial submission at Feb. WP5D meeting. 3GPP submitted detailed technology description at June WP5D meeting. 13 evaluation groups were registered as independent evaluation groups in order to evaluate candidate technologies against IMT-Adv minimum requirement. Detailed evaluation will be discussed in 7th & 8th WP5D meetings in accordance with ITU-R WP5D schedule. Geneva, 13-16 July 2009

Highlight of Current Activities TTA are actively involved in the IMT-Adv submission and evaluation activities. TTA endorsed LTE-Advanced submission as an organization partner of 3GPP at June WP5D meeting TTA also supports IEEE 802.16m technology for IMT-Advanced candidate technology. TTA registered as independent evaluation group, and provided technical contributions to WP5D e.g., C-code implementation of channel model, and clarification of channel model. TTA has actively participated in CJk-B3G collaboration. AWF and 3GPPs collaboration were agreed as work scope. SIG on Evaluation was established. 10 Joint contributions were made toward WP5D so far 3 Geneva, 13-16 July 2009 3

Proposed Strategic Direction It is very important for ITU-R WP5D to manage the IMT-Advanced standardization process on time. Broadband networks are demanded for high-capacity services on newly identified spectrum at WRC-07. Based on timely IMT-Adv. Work completion, WRC-11 preparation can be smooth This concludes that IMT-Advanced standardization process should be maintained in a transparent and efficient manner. The progress of works should be well documented The works of proponents and evaluation groups should be well organized.

Challenges The difference of evaluation results Multiple evaluation methods are specified for different perspectives of evaluation for IMT-Advanced RIT or SRIT. ITU-R M.2135 didn’t specify every details on evaluation methodologies with consideration of different conditions required by different technologies. The different understanding or implementation of evaluation methodology described in the Report ITU-R M.2135 by different evaluation groups. It is difficult to calibrate evaluation methodologies among evaluation groups taking into account time and resource. The ambiguity of consensus building(Step7) After compliance assessment with minimum requirements at Step 6, consensus building and decision (step7) will begin. However, there is no clear definition & guideline on how to achieve objectives of “consensus building”.

Next Steps toward IMT-Adv. Standardization The efficient work under IMT.RADIO Although scope and work plan for IMT.RADIO was proposed at the previous WP5D meeting, there are still different views. However, TTA is of view that IMT.RADIO is needed for an interim document to smoothly connect evaluation discussion to ITU-R M.[IMT.RSPEC] development. Therefore, TTA would like to propose that IMT.Radio should be developed towards a new IMT-ADV document under current workplan in order to facilitate consensus building process, while comprised of the summary of discussion on the evaluation of each candidate RIT/SRIT

Supplementary Slides Geneva, 13-16 July 2009

FIGURE A2-1 (IMT-ADV/2-E) Schedule for the development of IMT-Advanced radio interface Recommendations Geneva, 13-16 July 2009

IMT-Advanced development process Steps of IMT-Advanced proces s (ITU-R WP5D) Steps of IMT-Advanced proces s Work aspect Responsible Group Note Step 1 Issuance of circular letter Ad Hoc Circular Letter Completed Step 2 Development of candidate RIT/SRITs Proponents External to ITU Step 3 Reception of the RIT/SRIT proposals & Acknowledgement of receipt Radiocommunication Bureau & SWG Coordination Step 4 Evaluation of candidate RIT/SRIT External Evaluation Group Step 5 Review and coordination of outside eval uation activities WG-TECH SWG Coordination is the focal point for internal and external c oordination Step 6 Review and access compliance with mi nimum requirements WG-TECH SWG-EVAL Step 7 Consideration of evaluation results, con sensus building and decision Step 8 Development of radio interface Recom mendation(s) To be determined Decision will be made at later meeting Geneva, 13-16 July 2009