Presentation is loading. Please wait.

Presentation is loading. Please wait.

Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY

Similar presentations


Presentation on theme: "Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY"— Presentation transcript:

1 Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY Agenda Item: 5.1 (M2M / IoT) COLLABORATION BETWEEN ITU-R AND OTHER ORGANIZATIONS IN DEVELOPMENT AND MAINTENANCE OF IMT Colin LANGTRY, Study Groups Department, ITU-R. GSC-18 Meeting, July 2014, Sophia Antipolis, France

2 GSC-18, 22-23 July 2014, Sophia Antipolis
Outline Resolution ITU-R 57 Overall process Example schedule Benefits GSC-18, July 2014, Sophia Antipolis

3 GSC-18, 22-23 July 2014, Sophia Antipolis
Resolution ITU-R 57-1 Principles for the process of development of IMT‑Advanced Deliverables: develop Recommendations and Reports for IMT, including Recommendation(s) for radio interface specifications Timeframe: it shall be an ongoing and timely process with defined outputs that take into account developments external to ITU‑R Participation: that radio interface technologies (RITs) shall be developed based on submissions from ITU-R Membership, and may additionally be based on submissions invited from external organizations Equitability: the process shall give equal opportunity to all proposed technologies to be evaluated against the requirements for IMT Maintenance: that new radio interfaces that are developed over time should be considered for inclusion in IMT in a timely fashion GSC-18, July 2014, Sophia Antipolis

4 The Overall Process: IMT-Advanced
5/31/2019 The Overall Process: IMT-Advanced Vision Rec ITU-R M.1645 Market/ Services view Technology view Spectrum view Name Spectrum identification Process definition Open invitation for proposals Proposals, Evaluation, & Consensus Building Radio Framework & Core Specifications Q / Setting the stage for the future: Vision, spectrum, and technology views Defining the technology

5 5/31/2019 Schedule 2007 2007 2008 2008 2009 2009 2010 2010 2011 2011 WP8F WP5D #21 #22 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 Invitation for proposals PROPOSALS Add#1 Add#2 PROPOSALS 5/LCCE/2 Services framework Preliminary EVALUATION EVALUATION Revise proposals Rec ITU-R M.1822 Technical requirements CONSENSUS BUILDING inside & outside of ITU – revise proposals / Rep ITU-R M.2134 Evaluation criteria and methodology Rep ITU-R M.2135 Framework and key characteristics Rec ITU-R M.[IMT.RADIO] Detailed specifications of the radio interfaces Rec ITU-R M.[IMT.RSPEC]

6 GSC-18, 22-23 July 2014, Sophia Antipolis
Benefits Global participation and agreement by ITU membership: 193 Member States, >700 Sector members Associates and Academia, including standards development organizations, equipment manufacturers, network operators, industry forums, Open process provides a stable framework for investment in r&d and deployment Economies of scale -> lower costs, more accessible Ability to address associated implementation aspects: Availability of spectrum for current and future needs Sharing studies with other services and development of mitigation techniques Harmonized channel arrangements Worldwide roaming capability Development activities to accelerate deployment GSC-18, July 2014, Sophia Antipolis

7 GSC-18, 22-23 July 2014, Sophia Antipolis
Thank you! GSC-18, July 2014, Sophia Antipolis


Download ppt "Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY"

Similar presentations


Ads by Google