SSC Meeting Notes June, 2019 J. Brodie, C. Steidel SSC co-chairs

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
Keck Call for Proposals 2009A (Feb 1st - July 31st 2009) Deadline: 5pm, Mon 1st September 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
W. M. Keck Observatory Subaru Users’ Meeting
U NIVERSITY of C ALIFORNIA O BSERVATORIES LICK · KECK · TMT University of California Observatories Director: Michael Bolte (UCSC) Associate Director: Ian.
2009 Aug 20 — SAC update WFOS/MOBIE1 WFOS/Multi-Object Broadband Imaging Echellette MOBIE Team, to date: PI / optical designer: Rebecca Bernstein Project.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
Oct 17, 2001SALT PFIS Preliminary Design Review1 PFIS/ IMPALAS Issues Outside Reviewer's Comments Post-PDR tasks Valuation Issues.
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
The Prime Focus Imaging Spectrograph Design and Capabilities
GBT Focal Plane Array Development Program Steven White Program Manager.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Big Bear Solar Observatory Some ground-based technology developments that will propel solar physics Phil Goode for Jeff Kuhn Big Bear Solar Observatory.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Camera PDR/CD1 Planning 19 September 2008
Jim Fast Pacific Northwest National Laboratory
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Jay Elias1 1plus bits plagiarized from Steve Heathcote and others
Science Priorities and Implications of Potential Cost Savings Ideas
Community Science Updates
WBS 1.03 Readout Systems Scope, Cost and Schedule
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Efficient Homes (NWESH)/Next Step Home
Phil Goode for Jeff Kuhn Big Bear Solar Observatory
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
An IFU slicer spectrometer for SNAP
Theme 2 AO for Extremely Large Telescopes
Management Breakout: MREFC Budget Summary Victor L
LSST Camera Detector Status
Overview Instrument Role Science Niches Consortium science
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Mark McKinnon EVLA Project Manager
Theme 2 AO for Extremely Large Telescopes
Instrument Overview Larry Springer HMI Program Manager
NGAO Trade Study GLAO for non-NGAO instruments
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

SSC Meeting Notes 19-20 June, 2019 J. Brodie, C. Steidel SSC co-chairs

2019 White paper and Phase A funding call: summary 7 white papers and 5 Phase A proposals were submitted Topics include new instrument concept and AO studies, upgrade studies, and calibration studies Total funding request for White Papers over-subscribed by a factor of ~2 relative to available funds. Total funding requested for Phase A studies: oversubscribed by ~x4 vs. the available funding for this year. Future years will have a higher level of Phase A funding available.

White paper summary Project PI (institution) DEIMOS Detector Upgrade Kirby (Caltech) Keck AO Data Science Jensen-Clem (UCB) IGNIS Mace (UT Austin) OSIRIS Calibrations T Do (UCLA) VIPA demonstrator Mawet (Caltech) HAM for OSIRIS Sallum (UCI) OSIRIS Ext Interferometer Erskine (LLNL)

Phase A proposal summary Project PI (institution) FOBOS Bundy (UCO/UCSC) AO upgrades Wizinowich (WMKO) BIRES Cohen (Caltech) Keck PFWI Cooke (Swinburne) NIRC2 Upgrade Phase II Mawet (Caltech)

FOBOS – Status of 2018 White Paper Studies FOBOS is a 0.31-1.0 um R~3500 instrument, 1800 fibers (based on the need for high target density), 20 arcmin diameter FOV. Key capabilities: no redshift desert, continuous coverage of Ly-alpha z>1.5 (PFS limited to z>2.2); high target density (6/arcmin2), dynamically configurable focal plane and deployable IFU. Good fit for GLAO when it comes online. The initial phase has been building the science case coupled with institutional visits, and adjusting the design to meet the diverse science goals. Other recent developments include: a focal-plane trade study, optical and spectrograph design improvements, and fiber-system risk mitigation study (UCO funded). The calibration system would require a high-quality flat-field. Initial discussions are underway about adding a dome screen, and further consulting with calibration experts (e.g., Renbin Yan, Jim Gunn (PFS)) is now being pursued.

BIRES – Status of white papers BIRES is 0.32-1 µm, R~4500 single-slit spectrograph (4k x 4k). Optimized for TDA use, but also useful for other single-object science. Spectrograph design optimized for UV/blue where similar capabilities do not currently exist @WMKO. Primarily unofficial goal would be to replace ESI, obviating need for K2-DM3 Optical design is based on ESI heritage, yet BIRES provides factors of 2-5 improvement in throughput (depending on wavelength). The selection of Keck I is based on the availability of bent-cass ports and the deployable tertiary mirror in KI. The location and coordination of BIRES with other instruments would need further investigations and optimization. The slit is to be aligned with the elevation direction, thereby avoiding wavelength-dependent slit losses due to atmospheric refraction. Keck team agrees that the bent cass port would allow this capability without an image rotator.

New White Papers

DEIMOS detector upgrade PI Evan Kirby (Caltech). Proposes to study an upgrade to DEIMOS detector mosaic Will increase quantum efficiency (QE) and operational efficiency Will assemble a science team to assess the feasibility and usefulness of each of the possible new technologies Request funding to support detector engineer Roger Smith.

Holographic aperture mask for OSIRIS PI Steph Sallum (UCSC/UCI). Proposes to fabricate and install a holographic aperture mask in the OSIRIS Imager. Improves spatial resolution up to 0.5 lambda/D at higher throughput and more baselines than NIRC2 non-redundant aperture mask.

Bringing Data Science to Keck AO PI Rebecca Jensen-Clem (UCB/UCSC). Proposes to develop a database of Keck AO telemetry and make correlations with science image quality. Will host hackathons to engage and leverage Keck AO community. Will propose for more sophisticated data science analysis.

Virtually Imaged Phased Array PI Dimitri Mawet (Caltech). Proposes to test a prototype VIPA spectrograph on Keck with new (NIRSPEC) fiber injection unit. Uses novel FP-like VIPA optic.

IGNIS spectrometer PI Gregory Mace (UT Austin). Proposes to study cloning the GMTNIRS IR spectrograph for Keck. Would provide simultaneous JHKLM (1-5 microns) @R~45,000 spectra

Improving OSIRIS Calibrations PI Tuan Do (UCLA). Proposes to improve OSIRIS calibration by assessing needed frequency of rectification matrices and wavelength calibrations, develop data quality metrics, design a calibration etalon, hold OSIRIS hackathons to improve DRP

OSIRIS Interferometer PI David Erskine (LLNL) Proposes to study the feasibility of using externally dispersed interferometry (EDI) to increase OSIRIS spectral resolution by ~3X. Will compute S/N estimate and investigate telescope and instrument interface issues

New Phase A Proposals

FOBOS PI Kevin Bundy (UCO/Lick). Proposing to complete conceptual design, develop cost estimates, plan submissions for upcoming funding opportunities provided by the NSF and others, and advance design of high risk components to prepare for MSIP

Keck AO Improvements PI Peter Wizinowich (WMKO). Request ~1000 hr WMKO time Proposes to develop a funding proposal to upgrade and refurbish Keck AO infrastructure. Topics include reducing thermal background, improving nIR low-order WFS, improving astrometric stability.

Keck Wide Field Prime Focus Imager PI: Jeff Cooke (Swinburne). Request: SSC endorsement to proceed with design work. Proposes to continue design work for a wide-field (0.7-1 deg) prime focus imager optimized for near-UV observations.

BIRES PI Judy Cohen (Caltech). Proposes to develop the BIRES concept for a funding proposal including enlarging the science team, closing trades, and advancing the technical design to PDR in preparation for a funding proposal

NIRC2 Detector and Electronics Upgrade PI Dimitri Mawet (Caltech). Proposes to upgrade the obsolete detector electronics and host computer and to add the capability to do focal plane wavefront sensing (speckle suppression).

KCRM Update PDR held January 2019 Delta review held April 2019 Demonstrated enhanced system engineering; system engineer on board Reviewed costs and worked to bolster contingency reserves Lingering concerns: Need monthly tracking of costs and accomplishments Need to understand project milestones Need to address camera optics critical path schedule slip Project will address these concerns and report to review chair Integrated master schedule completed; commissioning in 2022A Critical path items include detector (UCSC), camera optics (CIT/Winlight)

KCRM Update (2) Schedule issues: Optics blanks for CaF2 would take 12 months: 6 month schedule slip on critical path Camera design studies have also slipped 1-2 months Selected random orientation CaF2 crystal as this should not impact long wavelength performance and is easier/faster to procure than single crystal Working on flexible plan for AIT to accommodate sub-assembly deliveries Gary Parks and Michael Brenner have been providing management guidance and assistance Ongoing concerns include funding, camera optics, limited staffing resources KCRM project manager search has been initiated at COO KSOC now reports to WMKO Chief Scientist; organizational structure is working

ToO Updates LIGO is finding candidates, but most are BH-BH mergers that are not expected to have optical counterparts ToO triggers have been executed in April, May One event was triggered on KI and KII on the same night TORT was successful in 2 of 3 triggers; failure was linked to date error in software and subsequently fixed ToO policy reminder was issued with 2019B allocations; ToO observers need to be well prepared to use the instruments they plan to use