Pierluigi Paolucci & Giovanni Polese

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Control System for the ATLAS Pixel Detector
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Detector Control System
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Barrel HV & LV system Lappeenranta University
HV & LV status LV system in W+1 and W+2 is OK
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
The LHCb Run Control System
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
Experiment Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Tools for the Automation of large distributed control systems
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Presentation transcript:

Pierluigi Paolucci & Giovanni Polese RPC Detector Control System Pierluigi Paolucci & Giovanni Polese I.N.F.N. of Naples cms.na.infn.it 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli RPC DCS structure ECS DCS DAQ TRG …. …. Functionality (FSM) Config. Logging Alarm handling Access PVSS + FW HCAL ECAL MU TK Pixel CSC RPC DT Detector Barrel Endcap Sub-system HV Cu LV Cu T Cu HV Du LV Du T Du Device Physical device 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

RPC DCS Physical devices Muon DCS Ampliare RPC Barrel DT CSC RPC Endcap Wheel +2 Wheel +2 Wheel +2 Wheel +2 Wheel +2 HV LV T gas cool rack FEC ext. DCS nodes XDAQ EASY system Local DAC node with 5 partitions one per wheel 12 crates 80 boards 480 ch. 20 crates 60 boards 720 ch. 300 sensors 10 ADC About 5000 FEBs 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli RPC FSM structure Each single element of the structure, in the FSM approach, is a different parts of the detectors, structured as logical software units, arranged in a tree-like structure. Each logical unit is characterized by a set of well defined states. The RPC states machine is not yet in place but the structure is ready and it will be implemented as soon as possible 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

RPC DCS software status I RPC DCS is developed as a hierarchy where every object is represented as a node of the tree, following the CMS structure. Its architecture has been developed using the PVSS II and SMI++ toolkit in the JCOP framework. PVSS II version 3.0 and Framework release 2.0.9 All the parameters and variables (HV, LV and T) of the CAEN mainframe SY1527 are linked, by OPC server, to a set of PVSS datapoint through of the Framework configuration facilities. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

RPC DCS software status II All the panel actions have been developed with custom scripts. Naming and color framework conventions are respected !! All structures have been tested using, in a first time, an ad hoc simulator and then the SY1527 Power Supply . Alarm conditions on HV and LV devices have been set. PVSS archiving has been used waiting for the framework interface with Oracle. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Main RPC DCS panel The RPC panel is under construction and it will include some sub-panel to set values for the whole RPC system; The status of the RPC node is also our top level status; Access to the Wheel node (panel). We are investigating the possibility to set alarms on some datapoints (Imon, Vmon….) where the ranges are related to other datapoints (I0set, V0set…) 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli HV Wheel node The wheel panel contains info about the parent and the children nodes with the relative state condition. The alarm status of every RPC is defined by the framework colors. Wheel name is an external variable All objects will be clickable. The Set/Monitor panel provide the possibility to give a look at all the wheel channels. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

Set/Monitor button Tab menu for select device type The most relevant parameters and the relative conditions are shown here. The status of each channel has been set with the relative color: OK, Tripped, Overcurrent,OverVoltage,UnderVoltage,RampUp,RampDown 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Wheel Global setting From the Global settings panel it is possible to set the values of all the HV and LV channels of the wheel and switch ON-OFF all the channels of the selected wheel. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Channel Details Left Click Details panel shows all the variables of the selected channel, its position in the wheel, alarm conditions, the VMON/IMON history plots and allow to set every single parameters of this channel. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Sector Node The Sector node has 8 children (RPC chambers). Some parameters and the status of each RPC are shown here. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Chamber Node Summary alarm with possibility of masking whole chamber. Fully description of a chamber. We have implemented the possibility to mask/unmask each single element using the left click of the element status. Simple Info about temperature value and sensor status. 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Devices (Leafs) Set and confirm values for all channel parameters Possibility of mask/unmask and acknowledge each single parameter or all together Additional panel for switch the state of the channel and load settings from the hardware 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli To be Done A PVSS prototype is almost ready (dec 04) and is in test with a SY1527 (HV and LV boards) system; An EASY system (HV, LV and ADC) has been installed in Naples in November 04 and is under test with LabVIEW; Move to the EASY hardware system (when ??); Implement the RPC State Machine (Jan 05); Thing about the Archiving and the Mass configuration; Be ready for the RPC DCS period to spend at CERN with the JCOP people (March 05) 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli

P. Paolucci & G. Polese - INFN di Napoli Conclusions 7/31/2019 P. Paolucci & G. Polese - INFN di Napoli