P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009

Slides:



Advertisements
Similar presentations
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
1 Daniel Ratner 1 Gain Length and Taper August, 2009 FEL Gain length and Taper Measurements at LCLS D. Ratner A. Brachmann, F.J.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Low Emittance RF Gun Developments for PAL-XFEL
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Beam Commissioning Adam Bartnik.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Sara Thorin, MAX IV Laboratory
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Short pulse, low charge LCLS operation
Experimental Facilities Planning
Beam-Based Feedback in LCLS-II
Thermal emittance measurement Gun Spectrometer
Revised Commissioning Strategy
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Commissioning Status of the LCLS Accelerator and Undulator Systems
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
LTU/Undulator Installation Status
Beam-Based Alignment Results
TW FEL “Death-Ray“ Studies
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Z. Huang LCLS Lehman Review May 14, 2009
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
e-Beams Systems Update
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
Overview Pre-Beam Checkouts
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
LCLS Commissioning: Results & Plans P
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
FEE Diagnostics and Commissioning
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
LTU/Undulator Installation Status
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
LCLS Commissioning Parameters
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS Control System Personnel Linac & BC2 Controls progress
Injector Physics C.Limborg-Deprey Feb.8th 2006
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
LCLS e- Beams Systems Manager
Presentation transcript:

P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009

Commissioning Status of LCLS Laser, gun, & injector commissioned: 2007 Linac & bunch compressors commissioned: 2008 First beam through undulator beamline: Dec. 2008 21 undulator magnets installed & ready: April 7, 2009 First lasing at 1.5 Å: April 10, 2009 (first try!) 1.5 Å FEL saturation observed: April 14, 2009 (after BBA) X-ray diagnostics hall is not ready until early June Temporary (makeshift) x-ray diagnostics used up to now User operations start in Sep. 2009

84 meters of FEL Undulator Installed 25 undulators installed… 8 more to go

Undulator Gain Length Measurement at 1.5 Å gex,y = 0.4 mm (slice) Ipk = 3.0 kA sE/E = 0.01% (slice) Recent Results! (25 of 33 undulators installed) LG  3.3 m

Injector Transverse Projected Emittance <0.5 mm Time-sliced emittance: 0.3-0.4 m Exceptional beam quality from S-band Cu-cath. RF gun… 135 MeV 0.25 nC 35 A gex  0.43 mm gey  0.46 mm

Undulator ‘Taper Scan’ Shows 1.1 mJ of X-rays 1.5 Å FEL Energy (YAG) Pixel sum of x-ray YAG screen CCD camera vs undulator K-taper 4.6 MeV 4.6 MeV at 0.25 nC = 1.1 mJ or 0.8×1012 photons/pulse (15 GW at 75-fs FWHM pulse length) FEL-induced Energy Loss (BPMs) Dumpline BPMs Dog-Leg BPMs  ~100 meters 

Laser Heater Working Well YAGS2 Laser OFF σE/E < 12 keV RF deflector ON time energy YAGS2 Laser: 40 µJ σE/E  45 keV Laser Heater Working Well adds Landau damping YAGS2 Laser: 230 µJ σE/E  120 keV

X-translation (in/out) Undulator Girder with Motion Control + IN/OUT Cavity BPM (<0.5 m) Quadrupole magnet 3.4-m undulator Beam Finder Wire (BFW) CAM-based 5-DOF motion control beam direction X-translation (in/out) Wire Position Monitor Hydraulic Level System sand-filled, thermally isolated supports

Beam-Based Undulator Alignment Measure undulator trajectory at 4 energies (4.3, 7.0, 9.2, & 13.6 GeV) Scale all linac & upstream transport line magnets each time Do not change anything in the undulator Calculate… (Matlab GUI) Move quads and adjust BPM offsets for dispersion free trajectory Iterate… H. Loos RESULT: vary energy by factor of 3  trajectory changes by <10 mm

<1 mm Undulator Quadrupole Position Control 3-parameter fit to 20 BPMs along undulator (y0, y0, and Dy) Dy = 30 nrad kick due to quad ±4 mm (y0, y0) 0.7 mm backlash Thanks ANL!

BFW  e- Beam Finder Wire – Aligns ‘Loose’ End of Undulator wire target nominal chamber beam direction pumpout BFW Also used to measure emittance in undulator  e- wire IN wire OUT beam signal (arb. units) sx  40.4 µm x (mm)

Commissioning Time-Line First FEL Light Commissioning Project Milestones Installation Periods Install Undulators Project complete First Light in FEH First e- from gun PEP-II ends First e- to dump FEE/NEH Install First Light in FEE DOE Review X-Rays in NEH LTU/Und Sys Install First Users Injector Install BC2 Install J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A D M D 2007 2008 2009 2010 Down Down Down Down NEH FEH Linac Injector Linac/BC2 LTU/Und FEL/FEE

Done

Questions What are the available high level control programs for setting up, optimizing, and monitoring machine performance? To what level has their performance been validated? (Loos) What is the plan for detailed study and understanding of FEL performance and its sensitivity to the beam brightness, matching, energy and phase errors, LSC, CSR, etc.? (Huang) Is the hardware and software sufficiently reliable and usable to effectively serve the next stage of commissioning? If not, how will this be resolved? (Frisch) What is the plan for transitioning from operation by physicists and other specialists to operation by operators? (Schultz) Describe the configuration control in place or planned for hardware, software, and settings. Do these provide reasonable assurance that operational conditions can be reproduced? (Iverson) How quickly can the machine be brought up to an operational configuration after being tripped or shut down for minor repairs? Is this adequate? If not, how will this be addressed? (Frisch) What aspects of CD-4 performance measures have yet to be achieved and what's the plan for achieving them? (PE) What progress has been made on recommendations from other recent reviews (e.g., the last Lehman review)? (PE)

Borland/Neil Question #4 4. What is the plan for transitioning from operations by physicists and other specialists, to operations by operators? In the fall early science using the AMO instrument will begin. The schedule calls for machine maintenance one shift per week, machine studies 5 shifts per week and operation of a user program for the other 15 shifts. The accelerator physics staff will be limited to the accelerator studies they can do in those 5 shifts and are developing a system for controlling those studies. Accelerator operators are currently assisting the commissioning team and so are already adept at maintaining machine operation. In the LCLS Accelerator Systems Division area physicists, area managers, and safety oversight staff who will be responsible for LCLS operation have been named. Full documentation and training for linac and LCLS operations have been generated and is in use. Configuration control of the LCLS accelerator and safety systems is in force at present and will continue.