Multi-Family Fourplex Apartment

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Robert Adkins Et 493 Dr. Kris Koutsougeras Advisor: Dr. Rodi.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Steel Building Apartment- Design and Build
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
Preparing the Bid Package (A Developers Perspective)
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 494 Senior Design II Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
Architectural Drafting Mr. Higgins
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Jan 2016 Solar Lunar Data.
IT Strategy Roadmap Template
Timeline Roadmap Template
Design of a Commercial Shopping Center
Commercial Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
High Street Streetscape Improvement Project
Springbrook Estates Sewer Improvement Area Informational Meeting
Instructor: C. Koutsougeras
Average Monthly Temperature and Rainfall
<Location> – <Project Name>, Sponsor: <name>

This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Patrick Roach Robert Arena ET-493 Fall 2014 Advisor: Rudolph Rode
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
GOMACTech-04 Technical Program Committee Timeline
Wireless Local Number Portability Timeline - Phase 2
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
Electricity Cost and Use – FY 2016 and FY 2017
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
New Medical Facility Building

TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Wireless Local Number Portability Timeline - Phase 2
XRN 4927 – MiR Drop 4 - Status Update
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Pilot of revised survey
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Multi-Family Fourplex Apartment ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’

Purpose The purpose of this project is to show that I can complete a construction project using all aspects of the construction process. This project will exercise the skills and abilities learned from the Construction Engineering Technology program.

Pre-Design and Design Phase (First Semester) Preliminary Drawings Rough Estimate Economic Feasibility Report Site Assessment and Selection Decision on Building Layout Building Codes

The Building Wood Framed Concrete Foundation Estimated 3,826 sq. ft. for each building Estimated 957 sq. ft. for each unit.

Preliminary Drawings Drawings will be used for a rough estimate and budget. One story layout. Two story layout. Each building will have 4 units. Three bedrooms Two Bathrooms Kitchen Utility Living and Dining Room

Two Story Fourplex First Floor

Second Floor

One Story Fourplex

Economic Feasibility Assessment Cost/Benefits Analysis Do the Benefits outweigh the Costs for the owner? Will it be a profitable business ? How long will it take for the business to pay itself off?

Site Assessment and Selection Location will be in the Hammond area. The owner would like a site big enough for future expansion, if desired. Once the land is chosen it will be surveyed. Building codes will be acquired. The location, size, and cost of property will determine: The building layout that will be used. The number of buildings that can be built on the property.

Conclusion The completion of the activities this semester will allow the full completion of the pre-construction documents for next semester.

Pre-Construction Documents (Second Semester) The construction documents will include: Final Drawings (using AutoCad): Floor plan Electrical Plumbing Elevations Schedules and Details of Construction Overall Site Drawing (parking included)

Pre-Construction Documents Cont. Building specifications Building Permits Project budget and financing A complete estimation of labor, costs, and materials Detailed materials and equipment list Planning and scheduling of the project using Primavera Project Planner.

Timeline (First Semester)   Aug-20-Aug 22 Meet with advisor to discuss topic Aug 25 - Aug 29 Cont. Sept1 - Sept 5 Sept 8 - Sept 12 Select a Project Sept 15 – Sept 19 Begin Research Sept 22 – Sept 26 Prepare Proposal and Presention Sept 29 – Oct 3 Preliminary Drawings Oct 6 – Oct 10

Timeline cont. (First Semester) Oct 13 – Oct 17 Economic feasibility assessment of Costs and Benefits Oct 20 – Oct 24 Cont. Oct 27 – Oct 31 Rough Estimate and Budget Nov 3 – Nov 7 Site Assessment and Selection Nov 10 – Nov 14 Nov 17 – Nov 21 Decide on Building Layout Nov 24 – Nov 28 Building Codes Dec 2 – Dec 5 Begin Final Drawings/ End of Classes

Timeline (Second Semester) Jan 20 – Jan 23 Construction Documents: Floor plan/ Electrical/ Plumbing/ Elevations/ Overall site plans/ Jan 26 – Jan 30 Cont. Feb 2 – Feb 6 Feb 9 - Feb 13 Feb 16 - Feb 20 Project Budget and Financing Feb 23 - Feb 27 Mar 2 – Mar 6 Building Specifications Mar 9 – Mar 13

Timeline cont. (Second Semester) Mar 16- Mar 20 Estimation of materials, costs, and labor Mar 23 – Mar 27 Cont. Mar 30 - Apr 3 Building Permits Apr 6 – Apr 10 Planning and scheduling using Primavera Apr 13 - Apr 17 Apr 20 – Apr 24 Apr 27- May 1 Prepare for final presentations May 4 – May 8 Present Project

QUESTIONS??????