GSC IMT Task Force Report

Slides:



Advertisements
Similar presentations
DOCUMENT #:GSC15-PLEN-15 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Opening Plenary 6.1 TD-SCDMA & TD-LTE Standard and.
Advertisements

Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
DOCUMENT #:GSC15-PLEN-14 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.1 CONTACT(S):Asok Chatterjee
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Asok Chatterjee Vice President, Industry Relations, Ericsson ATIS Activities on IMT Standards Document.
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration Updated CCSA Activities on IMT Standardization and industry in China Ke Wang, CCSA Document.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04r1 Source:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Jeju, 13 – 16 May 2013Standards for Shared ICT Stephen Hayes Director of North American Standards Ericsson ATIS Activities on IMT Standards Document No:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities on IMT Standardization LEE HyeonWoo Chair of TTA PG701 Document No: GSC17-PLEN-21r2 Source:
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
HEADING FOR SLIDE Sub Heading
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
Continuing Cooperation on IMT Standardization
GSC-15 Closing Plenary Summary Report
TTA activities on IMT-Advanced
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
ATIS Activities on IMT Standards
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
Update ARIB Activities on IMT Standardization
Update ARIB Activities on IMT Standardization
Document No: GSC-18_006 Source: Invited Speaker, ITU-R WP5D / ARIB
Update ARIB Activities on IMT Standardization
IEEE IMT-Advanced Review Process
Global Standards Collaboration (GSC) GSC-15
GSC IMT Task Force Report
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
Update of ARIB Activities on IMT Standardization
ITU-R Liaison Group Report - Session #65 Opening Plenary
GSC IMT Task Force Report
IEEE IMT-Advanced Review Process
GSC-15 Closing Plenary Summary Report
IMT-Advanced Opening Report
Status report from ITU-R WP 5A on ITS activities
ITS Task Force Report Takeshi YAMAMOTO ARIB GSC17-PLEN-82r2
GSC IMT Task Force Report
TTA activities on IMT Standardization
IEEE IMT-Advanced Review Process
ITU-R Liaison Group Report - Session #65 Opening Plenary
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
Asok Chatterjee, GRSC-6 Chair Jackie Voss, ATIS Staff
TTA activities on IMT-Advanced Standardization
Continuing Cooperation on IMT Standardization
Continuing Cooperation on IMT Standardization
TTA Activities on IMT-Advanced standardization
ITS Task Force Report Takeshi YAMAMOTO GSC16-PLEN-63 Document No:
Report of GSC-12 Opening Plenary
GSC-15 Closing Plenary Summary Report
Presentation transcript:

GSC IMT Task Force Report Global Standards Collaboration (GSC) 14 DOCUMENT #: GSC14-PLEN-016 GSC14-GRSC7-013 FOR: Presentation SOURCE: Kohei SATOH (ARIB) AGENDA ITEM: PLEN 12; GRSC 7.1 CONTACT(S): satoh@arib.or.jp GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Geneva, 13-16 July 2009

Highlight of Current Activities GSC Task Force on IMT standardization was created under the GRSC by Resolution of GSC-12 (Resolution GSC-12/01). An objective of the Task Force is to exchange information and views on candidate radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard. Activities would be expected to be carried out during the ITU-R WP5D, 3GPP/3GPP2 and other regional meetings (e.g., CJK B3G WG meeting, IMT-WG of AWF, etc.). Geneva, 13-16 July 2009

Strategic Direction The Task Force should be encouraged to actively help in the exchange of information and views with the goal of consensus building which is performed with the objective of achieving global harmonization and having the potential for wide industry support for the radio interfaces of IMT-Advanced. Activities of the Task Force should be continued to develop detailed specifications of the radio interfaces for IMT-Advanced. Geneva, 13-16 July 2009

Challenges Candidate radio interface technologies (RITs) will be evaluated in the Step 4 of IMT-Advanced radio interface development process. The ITU-R membership, standards organizations, and other organizations were invited to proceed with the evaluation. 12 evaluation groups were registered with the ITU-R. Coordination among evaluation groups is strongly encouraged to facilitate comparison and consistency of results, to assist ITU-R in developing an understanding of differences in evaluation results achieved by the independent evaluation groups and to form some preliminary consensus on the evaluation results. Pre-coordination or discussions towards coordination should be carried out through the Task Force activities. Geneva, 13-16 July 2009

The Task Force proposes that GSC Next Steps/Actions The Task Force proposes that GSC endorses the further continuation of the IMT Task Force to exchange information and views with goal of consensus building for the radio interfaces of IMT-Advanced, and requests its PSOs to review their national/regional activities and to report on their progress to the Task Force and at the next GSC meeting. Geneva, 13-16 July 2009

Proposed Modification of Resolution GSC-13/01 Considering recent activities in ITU-R WP5D, 3GPP/3GPP2, PSOs and others on IMT-Advanced, Resolution GSC-13/01 (Continuing Cooperation on IMT Standardization) should be updated. Geneva, 13-16 July 2009

Supplementary Slides Geneva, 13-16 July 2009

Schedule for Development of IMT-Advanced Radio Interface in ITU-R WP5D We are now here! 2008 2009 2010 2011 WP 5D meetings #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 (1) Cut off for proposal (2) Cut off for evaluation report (3) Decide key characteristics (4) Develop radio interface specification Step 1 and 2 (0) (20 months) Step 3 (8 months) (1) Step 4 (16 months) (2) Steps 5,6 and 7 (20 months) (3) Steps 8 (12 months) (4) • Steps in Radio interface development process: Step 1: Issuance of the Circular Letter Step 2: Development of candidate RITs Step 3: Reception of the submissions and issuance of an acknowledgement for RIT Step 4: Evaluation of candidate RITs by evaluation groups Step 5: Review and coordination of outside evaluation activities Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Step 8: Development of Radio Interface Recommendation(s) Geneva, 13-16 July 2009

IMT-Advanced Radio Interface Development Process ITU-R Outside ITU-R Step 1 Issuance of a Circular Letter to invite proposals for radio interface technologies and evaluations Step 2 Development of candidate radio interface technologies Submission of candidate radio interface technologies Step 4 Evaluation of candidate radio interface technologies by independent evaluation groups, grouping or compromise of the technologies through consensus building Step3 Reception of the submissions and issuance of an acknowledgement for RIT Step 5 Review and coordination of outside evaluation activities Coordination between evaluation groups Step 6 Review to assess compliance with minimum requirements Descriptions of proposed radio interface technologies and evaluation reports Step 7 Consideration of evaluation results, consensus building, and decision Radio interface specifications (RSPECs), sufficiently detailed to enable worldwide compatibility Step 8 Development of radio interface Recommendation(s) Step 9 Implementation of Recommendation(s) Geneva, 13-16 July 2009

Standardization Activities of IMT-Advanced in ITU-R WP5D (1) The Invitation Circular Letters (5/LCCE/2 and its addendum) for submission of proposals for candidate radio interface technologies for IMT-Advanced were issued in March and August 2008, respectively. Three draft new Reports were completed at the 2nd and 3rd meeting of WP5D and approved at the 2nd meeting of Study Group 5 in November 2008. IMT.TECH (Report ITU-R M.2134): Requirements related to technical performance for IMT-Advanced radio interface(s) IMT.EVAL (Report ITU-R M.2135): Guidelines for evaluation of radio interface technologies for IMT-Advanced IMT.REST (Report ITU-R M.2133): Requirements, evaluation criteria and submission templates for the development of IMT-Advanced Geneva, 13-16 July 2009

Standardization Activities of IMT-Advanced in ITU-R WP5D (2) Two proponents submitted the following contributions to the 5th meeting of WP5D in June 2009: (1) 3GPP 34 Individual Members (IMs) of 3GPP provided an initial technology submission of LTE Release 10 & beyond (LTE-Advanced) under Step 3 of the IMT-Advanced process. This submission is based on the currently approved work within 3GPP. The submission made by the IMs was endorsed by 6 Organizational Partners. (2) IEEE The IEEE Project 802.16m, under development in the IEEE 802.16 Working Group (WG), continues to progress in its development of a candidate radio interface technology (RIT) for IMT-Advanced. This candidate RIT is expected to be submitted by IEEE to the WP 5D by its October 2009 meeting in accordance with the development schedule. (3) Others Japan and Korea endorsed the works of 3GPP and IEEE802.16 relating to the submission of proposals for candidate radio interface technologies for IMT‑Advanced. Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in ARIB IMT-Advanced Subcommittee under the Advanced Wireless Communications Study Committee is conducting technical studies on IMT-Advanced and promotes its standardization through contributions to ITU-R and other activities Radio Interface Technology Study Group and its Evaluation Group established under the IMT-Advanced Subcommittee are in action towards the submission of candidate radio interface technologies for IMT-Advanced The Study Group is now under discussion to prepare draft proposal(s) of IMT-Advanced radio interface technology with two working groups The proposal(s) will be submitted to ITU-R through Japan’s national process The Evaluation Group had already started its activities through discussions in the CJK-B3G Standards meeting Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in ATIS ATIS interfaces with ITU-R directly as a Sector Member. ATIS as an Organizational Partner of 3GPP is part of the proponent for the LTE-Advanced IMT-Advanced submission. The primary contact for IMT-Advanced is the Wireless Technologies and Systems Committee (WTSC). A large number of the member companies of WTSC are working on the IMT-Advanced issues through 3GPP as well as through ATIS sector member input. ATIS endorsed the 3GPP IMT-Advanced submission to the June WP5D meeting. ATIS WTSC has chartered an IMT-Advanced evaluation group and registered with WP5D. ATIS WTSC expects to start the evaluation process at its next meeting. ATIS WTSC intends to submit an evaluation report by June 2010. Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in CCSA CCSA,the 3GPP Organizational Partner,joined with 3GPP in providing an initial technology submission of LTE-Advanced as a candidate SRIT (includes an FDD RIT component and a TDD RIT component), for IMT-Advanced to ITU-R WP5D. China established an evaluation group to ITU-R, Chinese Evaluation Group (ChEG), which is Chaired by Mr. Wan Yi, from China Academy of Telecommunication Research of MIIT. Tasks of ChEG include: Calibrate among members of ChEG to achieve consistent results. Participate self evaluation activities in standard organizations to facilitate the harmonization of candidate proposals. Submit evaluation reports to ITU-R. 14 Geneva, 13-16 July 2009 Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in ETSI ETSI has decided that LTE-Advanced (as developed within 3GPP) will be submitted to ITU-R as a candidate IMT-Advanced candidate technology. ETSI has submitted a complete technology description of LTE-Advanced to the June meeting of ITU-R WP5D. A final technology proposal will be submitted to the October meeting of WP5D. ETSI has registered as an Evaluation Group for the purposes of IMT-Advanced and will decide whether to evaluate candidates on a case-by-case basis. Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in TIA TIA, through the U.S Administration, and its member companies are actively involved with ITU-R WP5D and its work on IMT-Advanced. Committee TR-45 will not be submitting a candidate for IMT.Advanced for the October 2009 submission. TR-45 registered with ITU-R WP5D as an Evaluation Group. Activities of the Eval Group during 3Q09 include: Agreement upon a method of work and timeline, including identification of which proposals to evaluate Agreement upon an evaluation methodology based on relevant ITU-R documentation (e.g., ITU-R M.2135, “Guidelines for evaluation of radio interface technologies for IMT-Advanced”) Establishing informal liaisons with other registered evaluation groups and proponents as considered appropriate Geneva, 13-16 July 2009

Recent Activities on IMT-Advanced in TTA IMT-Advanced Project Group(TTA PG701) Endorsed the submission on LTE-Advanced of 3GPP as a candidate of IMT-Advanced to ITU-R WP5D #5(Geneva). Collaboration with China, Japan through CJK B3G Meeting CJK submitted total 10 joint contributions to ITU-R WP5D meeting until now. (related to IMT-Advanced Process, Evaluation etc..) IMT WiBro PG(TTA PG702) Currently focused on Standardization of “interworking between WiBro and UMTS” and “WiBro Femto cell” etc. Continue the collaboration with IEEE802.16 on Enhanced M-WiMAX IMT External Evaluation PG(TTA PG707) Submitted the LLS results for IMT.EVAL to WP5D #4 Meeting Opened the C-code, which was developed by TTA, for the channel model implementation to WP5D#5 Meeting. 17 Geneva, 13-16 July 2009 Geneva, 13-16 July 2009

Activities of the Asia-Pacific Telecommunity Wireless Forum (AWF) A major objective of the Asia-Pacific Telecommunity Wireless Forum (AWF) is to promote new wireless applications in the Asia-Pacific region and in this regard: The AWF IMT Working Group (WG-IMT) reviews the activities on the future development of IMT-2000 and IMT-Advanced developed in the relevant ITU-R Working Parties WG-IMT develops views on issues arising from the review of the service and technology related aspects and the progress of the enhancement and evolution of IMT-2000 and IMT-Advanced by these ITU-R Working Parties and ascertains their applicability to the region The AWF Spectrum Working Group (WG-SPEC) identifies the spectrum requirements for new radio technologies and develops plans for harmonized spectrum usage for radiocommunication systems in the region. Studies are proceeding on frequency arrangements for the 698-806 and 2300-2400 MHz bands. WG-SPEC also develops optimum sharing methodologies between radio services and methods ensuring compatibility between systems. Studies are about to commence on Software Defined Radio and Cognitive Radio Systems. Geneva, 13-16 July 2009

Resolution GSC-13/01 on IMT standardization Continuing Cooperation on IMT Standardization Resolves: to encourage 3GPP, 3GPP2, IEEE, Participating Standards Organizations (PSOs) and others to continue to work on enhancing the IMT standards as an essential part of future telecommunication, computing and entertainment standards; to encourage the harmonization of candidate proposals for the radio transmission technologies for IMT and related networking standards; to invite 3GPP, 3GPP2, PSOs and others to take care of the evolution of the current systems and the long-term evolution for such systems taking into account copyrights, working procedures, IPR aspects etc. and report to the next meeting for review; to exchange information and views on candidate radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard; to encourage the Task Force under the GRSC to actively help in the exchange of information and views mentioned in 4), with the goal of consensus building; and to review this Resolution at future GSC meetings as required. Geneva, 13-16 July 2009