Joiner Partnership, Inc. Two Kingwood Place Suite 265 Kingwood, Texas 77339 (281) 359-6401 Fax (281) 359-6402.

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Bronze Award: Library/Media Center
WETASKIWIN REGIONAL AQUATICS CENTRE October 24, 2011 F.H. Collins Secondary School Replacement Whitehorse, Yukon BARR RYDER ARCHITECTS & INTERIOR DESIGNERS.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Electrical Design Panel Manufacturing Software Engineering Installation & Commissioning Modular Control House Design: S&W Energy Solutions, Inc Kingwood.
PA Architects. PA Architects Presents SUNSET Elementary School Welcome to SUNSET Elementary School RENOVATIONS & CLASSROOM ADDITION SCHEMATIC DESIGN.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Rha RHA Architects Ltd 17. The Diocese of Portsmouth The Improved and enlarged St Joseph Parish Church: Romsey Existing st Joseph Church Location.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
Julie Thompson MEDT 7477 Dr. Cooper Spring  Network/Wiring Diagram for Media Center  Network/Wiring Diagram for middle and high school  Report.
Grimsby Secondary School
Copyright © by the NCCER, Published by Pearson Education, Inc. Core Curriculum: Introductory Craft Skills Module National Center for Construction.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Perspective View 5420 Grosvenor Lane RENEWABLE NATURAL RESOURCES CENTER Bethesda, Maryland.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
 Function:  How a space will be used.  Dictates the selection and arrangement of furniture.  How can you combine functions with furniture arrangement?
Vocational High School Jean de Berry. Information High School Address : 85 avenue F.Mitterand Area code : City : Bourges Area : Centre Country :
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
E-twinning : Italy - TurKey Primary School of Edolo Our School Primary School of Edolo Our School.
Education in Hungary Secondary school 14 years old-18 years old
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
School and Conference: The General Circulation of the Atmosphere and Oceans: A Modern Perspective Trieste, 11 th to 15 th July, 2011.
Austin ISD #492 © Copyright 2011 Armstrong Torseth Skold & Rydeen, Inc.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Schacht aslani architects P ENINSULA C OLLEGE library media center faculty administration building 100% Design Development 28 February 2006.
ADDITION & REMODEL Eugene Field Elementary School.
C Casaccio Architects LLC 2011 Thomas Memorial Library Authentic Indigenous Intimate Timeless Whimsical A Vision for “A Lighthouse of Knowledge”
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. To change.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Benignus Elementary Klein Independent School District Spencer Partnership Architects Exterior Material Review April 1, 2005.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
Schematic design presentation School of Business South Hall Renovation.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
HIGH SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
Commercial Building Project Portfolio. Project Portfolio Deliverables Cover Page Table of Contents Architectural Program Site Information Code Requirements.
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
HKU SPACE Po Leung Kuk Community College Building Causeway Bay, Hong Kong 9 September 2008.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects PERES ELEMENTARY DENTAL CLINIC PROJECT.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
CTC facilities App Lab Exhibition Space 3Sixty and control room CETLE Room Meeting room Interior office.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Kerry Dome July 2014, Shanghai. ◌ Kerry DOME is a moveable inflatable structure ◌ Kerry DOME is the only one of its kind in China ◌ Modern and futuristic.
PPCD Service Location Code
LOCATION MAP PROPOSED 7-STOREY SCHOOL BUILDING MURCIA TOWN PROPER
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Visit Our Showroom, Located at ..
Columbus State Community College
Erma Ora Byrd Hall – 1st (Ground) Floor
WHAT IS THAT??.
1 Semester Project Design A Multi Story Office Building
Erma Ora Byrd Hall – 1st (Ground) Floor
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
DOVER ELEMENTARY Existing MPB (2/14/12).
Where …? Unit 2 Open Day.
New Gorbals Health and Care Centre
«Reading the city: Tuscany» Primary School of Pamfila “The School opens its door to Museums and Digital Technology” Mobility Programme «Reading the.
Erma Ora Byrd Hall – 1st (Ground) Floor
250 Catalonia Building Remarks:
Presentation transcript:

Joiner Partnership, Inc. Two Kingwood Place Suite 265 Kingwood, Texas (281) Fax (281)

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 SITE PLAN NEW PRIMARY SCHOOL Hitchcock Independent School District F.M. 519 MEMORIAL DR.

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 FLOOR PLAN Hitchcock Independent School District LEGEND: A/V – Audio Visual Storage CLRM – Classroom Comp. – Computer Lab Couns. – Counselor Cust. – Custodial Closet/Storage Elec. – Electrical Closet Head End – Main Technology Closet IDF – Secondary Technology Closet ISO – Isolation Room (Clinic) Kind. – Kindergarten KIVA – Reading Room Mech. – Mechanical Room Mezz. - Mezzanine Off. – Office P.I.E.M.S. – Public Education Information Management System P.P.C.D. – Preschool Program for Children with Disabilities Rec. – Reception Stor. - Storage NEW PRIMARY SCHOOL

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 ENLARGED FLOOR PLAN ENLARGED FLOOR PLAN NEW PRIMARY SCHOOL Hitchcock Independent School District LEGEND: A/V – Audio Visual Storage CLRM – Classroom Comp. – Computer Lab Couns. – Counselor Cust. – Custodial Closet/Storage Elec. – Electrical Closet Head End – Main Technology Closet IDF – Secondary Technology Closet ISO – Isolation Room (Clinic) Kind. – Kindergarten KIVA – Reading Room Off. – Office P.I.E.M.S. – Attendance/Registration Rec. – Reception Stor. - Storage

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 ENLARGED FLOOR PLAN NEW PRIMARY SCHOOL LEGEND: A/V – Audio Visual Storage CLRM – Classroom Comp. – Computer Lab Couns. – Counselor Cust. – Custodial Closet/Storage Elec. – Electrical Closet Head End – Main Technology Closet IDF – Secondary Technology Closet ISO – Isolation Room (Clinic) Kind. – Kindergarten KIVA – Reading Room Off. – Office P.I.E.M.S. – Attendance/Registration Rec. – Reception Stor. - Storage Hitchcock Independent School District

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 ELEVATION NEW PRIMARY SCHOOL Hitchcock Independent School District

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 PERSPECTIVE NEW PRIMARY SCHOOL Hitchcock Independent School District

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 PERSPECTIVE NEW PRIMARY SCHOOL Hitchcock Independent School District

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) /24/08 HIGH PERFORMANCE COMPONENTS NEW PRIMARY SCHOOL Hitchcock Independent School District

Joiner Partnership, Inc. Architects Planners Interior Designers Two Kingwood Place Suite 265 Kingwood, Texas (281) Thank You!