A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
 Provide a safe crossing and maintain mobility › The bridge is identified as structurally deficient.  Meet regional traffic demands and improve mobility.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
MERTON HIGH STREET MATTHEW EALES. 2 Background Southern Gas Networks have been repairing leaks in Merton High Street over a number of years resulting.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Study Area What is this consultation about? This consultation has been prepared to seek your views and provide you with information about proposed transport.
CitywallCitygate St James Boulevard Newcastle Upon Tyne NE1 4JH Tel: +44 (191) By Road There is a pay and display parking facility to the front.
Existing informal footpath (owned by HCA) to connect to Lodge Jct crossing Carriageway widened into wooded area Proposed area for landscaping.
John Osborne GS/SE March 2013
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Truro sewer upgrade Timetable of work and maps. Key plan Victoria Square Kenwyn Street New / upsized combined sewer - red New / upsized surface water.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Dún Laoghaire Area Committee Meeting 8 th April 2015 Non Statutory Public Consultation Proposed Road Safety Improvement Works at Schools on Cross Avenue.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Northstowe Phase 1 Infrastructure Works Construction Phasing.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
London Underground Kingsbury to Wembley Park Embankment Stabilisation Brent Civic Centre 22 July 2015 Mark Hart – Communities Relations Manager Andrew.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Accommodation & Hospitality Services Team 2 February Team Meeting.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015.
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
- 1 - Noticing the Work Julie Payne – SSE Street works Manager.
Light Rail Project Community Light Rail Support Plan Committee 14 August 2014 Kensington Kingsford.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Raumati Road Corridor Consultation and Corridor Assessment
Planning the Project Unit 1 – Lesson 12.
Scenic Highway – Public Meeting
Directions to 2nd Street Gate
The fibre journey for fibre-to-the-cabinet (FTTC) solutions
District 3 Complete Streets Projects
Ashey Road and West Street Water mains renewals
A Vision For Camberwell – Improving Streets and Public Spaces In SE5
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
IA 122 RECONSTRUCTION PRE-BID MEETING
JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.
Citrus Park Drive Extension
Thornbury Road new green-man cycle and pedestrian crossing
Plant Person Segregation
Meriden Estate Redevelopment
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
MOLA ARCHAEOLOGY DIG.
An assembly about safe behaviour near roads.
M14A/D Select Bus Service
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
HE Designated Funds Cycling Safety and integration (CSI)
Glossary of regularly used cycling terms
Symbols Other Marshal Points Race HQ (Static or flag marshals)
Title of Presentation dd.mm.yyyy 2-in-1 Product Solution Temporary & permanent application with one product DELTA BLOC - We develop.
Whole Life Design Task Group
Presentation transcript:

A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE (05.05.2019)

Noteworthy Information Harwich Road South currently remains closed until 13.05.19. We have applied for another extension due to clashes with other utilities in the area as well as the delays with the Anglian Water reinstatement. The date asked for it to be extended to is 22.05.19. We will be beginning construction on St Andrews Avenue Eastbound on 07.05.19. This phased construction will see full traffic management in place around the works area to enable the contractor to fully carry out the demolishing and reinstatement of new footpaths and kerbs. The Traffic management will be in place for the duration of that phase. The proposed dates for Ipswich road closure are: 24.06.19 – 20.07.19 to finish the remaining Anglian Water works, Connections and testing etc. 20.07.19 for the Network Rail piling mat, hoarding and retaining wall works. This is expected to be a lengthy road closure due to the structural works in this area and it is vital we maintain safety around these works for all. We are currently investigating options to minimise the impact. We will update further next week.

Noteworthy Information Once the gas diversions have been completed and Harwich Road South has been re-opened we will be looking to begin construction on the north east corner of Harwich Road North and run this in line with the construction on St Andrews Avenue already in place.

Traffic management for week commencing 06.05.19 We currently have lane 1 closed on Cowdray Avenue. This is to allow us to walk pedestrians safely into the carriageway whilst we carry out the UKPN connections in the footway. Traffic has been placed into lane 1 from the Harwich Road compound to the Ipswich Road roundabout. The Eastbound traffic from Ipswich Road roundabout to Harwich Road have been put into a mini contraflow into lane 2 of the westbound traffic. This allows us to take the lane on that side for safety and construction zones. Ipswich Road North is back running as normal with all lanes open again. The footpath around the north east corner of Harwich road is half open to allow pedestrians and cyclists to pass by the works that have already taken place. The temporary controlled crossing we had in place on St Andrews Avenue has been removed. The footpath from Waitrose at St Andrews Gardens to Harwich Road has been closed for the construction phase. All members of the public have been diverted accordingly with site maps at these locations.

Traffic management for week commencing 06.05.19 Lane 1 is taken out on the approach to the Harwich Road roundabout along St Andrews Avenue for the gas pipe diversions & other works. The footpath along St Andrews Avenue from St David’s Close to the Harwich Road roundabout is closed. The public have been safely diverted and this is to accommodate the Cadent Gas works. Harwich Road South remains closed. A suitable diversion is in place.

St Andrews Avenue Traffic management for the construction phase

Construction Phase set up on St Andrews Avenue from St Andrews gardens Construction Phase set up on St Andrews Avenue from St Andrews gardens. Area is fully secured off for safety

Ipswich Road North UKPN excavation in the Footpath from Cowdray avenue

Ipswich Road North UKPN open excavation next to Waitrose

UKPN open Excavation on St Andrews Avenue Homebase side

UKPN open excavations on St Andrews Avenue outside the compound and on the Waitrose side

UKPN open excavations on St Andrews Avenue on the Homebase side

Sleeves Installed for lamp columns to be moved back from the kerb line

BT Manhole 6 retaining wall installation

Anglian Water reinstatement on Harwich Road South road closure

Anglian Water reinstatement on Harwich road south road closure

Harwich Road South

Cadent/Triio continued trenching on Harwich Road South road closure

Footpath closures St Andrews Avenue footpath closed on the Homebase side for UKPN. A suitable temporary footpath has been created in the carriageway around these works

Footpath closures Cowdray avenue footpath closed at the junction of Ipswich Road North for UKPN. A suitable temporary footpath has been created in the carriageway around these works

Footpath closures. Ipswich Road North footpath closed at the junction of Cowdray Avenue for UKPN. A suitable diversion has been placed around these works

Footpath closed at St Andrews Gardens onto St Andrews Avenue for construction Works

Works Completed 29.04.19 – 05.05.19. EUROVIA CIVILS UKPN trenches and ducting are now complete across Cowdray Avenue. Lighting sleeves have been dug out and are situated further back on the verge to accommodate for the construction stage on St Andrews Avenue. We Have completed the UKPN crossing across Harwich Road South into the compound. We have completed 10 out of the 12 UKPN excavation pits around site. This is to enable UKPN to put their cable through and make their connections. We have continued with the Cadent Gas trenching in Harwich Road South. CADENT/TRIIO Works in the Harwich Road area have commenced again with the laying of new pipe and connections. BT/TLU BT made good their manhole 6 by putting a retaining surround wall around the manhole itself. ANGLIAN WATER Harwich Road South has been fully reinstated and Anglian Water have now left the area.

Works Programmed for Week Commencing 06.05.19 We have open excavations around site for the UKPN connections to be made by the UKPN team. These excavations will need to remain open whilst connections are made and are expected to take around 2 weeks. We will be looking to move the existing lighting columns along St Andrews avenue into the new sleeves for the reconstruction phase. The gas diversions will be continuing on Harwich Road South this week. The excavations for connections on Harwich Road North in lane 1 and St Andrews Avenue west will be backfilled when we can complete these diversions. We have re-commenced with the connections to residences and the laying of gas pipe along this route. One of our gangs will be with this team for the duration. The reconstruction phase along St Andrews Avenue East from St Andrews Gardens to Harwich Road North will commence this week. This will see this whole area cordoned off to enable the contractors to work safely in this area.