Implementation Approach Distribution Workgroup – June 2014

Slides:



Advertisements
Similar presentations
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
IGT and Shipper Workgroup meeting 28 th February 2011.
SoS Report PAC – 13th December 2016.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Supply Point Register 10th January 2012
RBD NOTIFICATION PROCESS
Distribution Workgroup 24/11/16
Grid Code Development Forum – 6 September 2017
Market Trials ChMC 8th August 2018.
Revised registration for unregistered sites
Must Read Process Guide For Shippers
Modification Proposal 0192 – Draft Business Rules.
Confirmation Notice Period for Certain ‘Unique’ Sites
Change Management Committee – June 2019 Update
UNC Modification – Non Effective Days
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
R&N Timeline Release 2 Release 3 Feb-19 June-19
Project Nexus Workgroup
Project Nexus Workgroup
RAASP – Solution Options Scenario Comparison
COR1072 Enduring Transfer and Trade Arrangements
CSS Update for CoMC 19th September 2018
DSC Change Committee Summary – 11th July
Chris Warner Network Code Manager
Background MDD is currently managed within SPAA
DSC Change Committee Summary – 10th October
UNC Modification Proposal 0172 National Grid Distribution
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Key Value Indicators (KVIs)
DSC Governance Sub Group Recommendations
Project Nexus Workgroup
June 2019 Release Scope DSC Change Management Committee
DSC Change Committee Summary – 13th March ‘19
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
OCC & Standard Commodity Changes
Richard Fairholme Transmission Workstream 4th September 2008
CUSC “Alternate” Proposal process
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Lessons Learnt UKLC - November 2015
UK Link Manual Update (UNC Modification 0613)
Project Nexus Workgroup
Proposed June 2020 UK Link Major Release Scope / Governance Timeline
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Customer Issue Management CoMC Update
DSC Change Committee Update
Annual Quantity (AQ) 45.
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
UK Link Change Impacts and Release Update
Customer Issue Management Dashboard CoMC - July 2019
DSC Change Committee Update
DSC Change Committee Update
Presentation transcript:

Implementation Approach Distribution Workgroup – June 2014 UNC Modification 455 – Implementation Approach Distribution Workgroup – updated following UK Link Committee June 2014

UNC Modification / UK Link Modification Modification 455 allows Transporters to update Meter Information where it becomes aware that the Meter Information held on the Supply Point Register is inaccurate after relevant notice has been provided and where the User has failed to perform the update or notify that the update isn’t relevant Modification 455 implementation date was 27th May 2014 No UK Link System changes are required to implement this UNC Modification, therefore it is not obliged to be notified as a Class 2 UK Link Modification UK Link Systems have the capability for Transporters to update Meter Information currently, and notify Users

UNC Modification 455 – The Process Modification allows update of Meter Information by Transporters Key stages of the solution: Identification of Incorrect Meter Information by Transporter Notification to User of Incorrect Meter Information Expiry of Notification period Update of Supply Point Register by Transporters Notification to User of revised Meter Information in Supply Point Register Invoicing of User Pays Charges No UK Link System changes required for update of the SPR Ability to insert asset details not removed at RGMA Implementation M03 record is generated to notify Users of the amended asset detail M03 record was a key file used by Users – requested by Users to be retained at RGMA implementation

UNC Modification 455 – The Process Notification of M03 used to notify: Must Reads Transfer Readings Prime and Sub Readings Impact assessment necessary from Users regarding M03 record Impact assessment required of process changes regarding receipt of Notification to User of Incorrect Meter Information Modification 410A requires asset updates – this is prompted by COR2789 Modification 425 requires ability to update Meter Information Other projects may be initiated at the Transporter’s discretion Note: Isolation reversal explicitly is envisaged by the Modification 424 – therefore not within scope of 455 – notifications may be received from 30 days following SPUR update

Proposed Notice Period Some Users requested 6 month lead time for implementation of initial solution note: a subsequent system solution may be implemented for ‘Project’ Meter Information notifications (Phase 2) Existing Code obligations exist that require Users to respond to notification of incorrect asset detail – however it arises M3.2.11 Therefore receipt and investigation of such data should be an existing process Proposed that Users are ready to manage notification of Meter Information updates (via M03) by early November 2014 Notifications that Meter Information requires addressing will be received in advance of this for COR2789 (Mod 410A / 424) This matter was discussed at UK Link Committee in June – no objections to the approach were raised. Representations were sought in June CP – Representations Close Out 27th June 2014 If you have representations, please submit them to uklink@xoserve.com by 27/06/14