Presentation is loading. Please wait.

Presentation is loading. Please wait.

Revised registration for unregistered sites

Similar presentations


Presentation on theme: "Revised registration for unregistered sites"— Presentation transcript:

1 Revised registration for unregistered sites

2 Revised registration for unregistered sites
The meter fix date is the point from which a site may be capable of flowing gas and therefore needs a responsible supplier assigned to it; An RGMA flow will trigger a process that will identify the responsible party for the site; Transportation and energy charges should apply from the point that the site is capable of flowing gas, e.g. the meter fix date, cf UNC G7.3.

3 Revised registration for unregistered sites
Shippers will have [3 months] to complete the registration process after the meter is installed; A review of the C&D store processes will be carried out by Transporters; A C&D flow may initiate a Transporter site visit where necessary, e.g. Where a C&D notification from a meter worker is received and the site is not registered after [x] months.


Download ppt "Revised registration for unregistered sites"

Similar presentations


Ads by Google