1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
UCSB Hybrid Bonding & Testing
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Hybrid & Module Testing Status
Update of US Testing Status
UCSB Testing Status Anthony Affolder
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Recent TOB Developments
FNAL Module Testing Status
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
Sensor probing (Summary)
US Hybrid/Module/Rod Testing Model
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
US Module Testing Progress Report
Hybrid & Module Testing Status
Status of 44 ARCS tested TOB modules, June 24, 2004
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Hybrid & Module Testing Status Week of 11/28-12/2 11/28-12/2

UCSB Hybrid Testing Status 11/28-12/2

UCSB ARCS Testing Status 11/28-12/2

UCSB ARCS Testing Failures This Week 1 with too much current 1 with mechanical damage 5 failed on rod Added all failed on rod even within spec to be conservative 3 modules repaired this week Cumulative 9 with too much current 2 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV 1 with bad Dec. Mode chip 1 with bad Peak Mode chip 1 with chip with too low noise 1 with bad chip 1 with funny LED test 1 with chip out of synch 6 failed on rod 1 CMN 1 with mechanical damage 11/28-12/2

UCSB ARCS Testing Results 2411 Total Tested 2381 Grade A 3 Grade B 27 Grade F This week: 21 of 45056 channels bad (0.047%) Total Production: 609 of 1485056 channels bad (0.041%) 11/28-12/2

UCSB ARCS Testing Results Total Production: 609 of 1485056 channels bad (0.041%) This week: 21 of 45056 channels bad (0.047%) 11/28-12/2

UCSB Backplane Testing 11/28-12/2

UCSB LT Testing Status Failed module has too much current 11/28-12/2