Tunnel hardware installation

Slides:



Advertisements
Similar presentations
1 Designing for DVI General Applications Considerations.
Advertisements

Basic Jens Neigaard.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Beam Secondary Shower Acquisition System: Analogue FE installation schedule and Digital FE Status BE-BI-BL Jose Luis Sirvent Blasco
RD42 Meeting, CERN W. de Boer, Univ. of Karlsruhe 1 CVD diamonds as beam monitors CVD diamond used for: heavy ion beam monitor beam exit window.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Beam Noise APEX May 1, 2009 Carl Schultheiss Michiko Minty.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Eva Barbara Holzer TIPP 2011June 10, Eva Barbara Holzer 1 Eva Barbara Holzer for the BLM team CERN, Geneva, Switzerland TIPP 2011 June10, 2011 Chicago,
Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
CABLING SYSTEM PROTECTION. Screening/Shielding  1 In the Signamax Cabling System for the efficient screening of the telecommunications systems, the screen.
Secondary Emission Monitor for very high radiation areas of LHC Daniel Kramer for the BLM team.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
CERN LHC RF Power Systems
Current BLM Threshold Families 1st BLM Thresholds WG Meeting Matti Kalliokoski.
Hardware Commissioning Review BDI Equipment
Overview of LHC Beam Loss Measurements
Results of the 2007 BLM hardware tests in LSS5
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
Beam Interlock System SPS CIBU Connection Review
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
How does a signal go through the cable
Overview of the project
RF interlocks for higher intensities (LMC 15 June)
Ewald Effinger, Bernd Dehning
Injection region BLMs – ECR
AC Inlet & AC Input Filter
Beam Loss Monitor System Reliability and False Signals
SEM monitors tests PSI February MeV protons
BEAM LOSS MONITORING SYSTEM
Christos Zamantzas for the BLM team
Secondary Emission Monitor for very high radiation areas of LHC
برنامه‌ريزي منابع انساني
Combiner functionalities
BLM planning 24/02/2014.
BLM planning 03/03/2014.
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
An AC voltage source drives a sinusoidal current through two resistors. The amplitude of the sinusoidal voltage across the top resistor is 4 V. The amplitude.
SEM monitors tests PSI February MeV protons
BLM changes HV software interlock (SIS)
Sensitivity tests of BLM_S chamber in PSB dump
DAQ Racks, Bins and Modules Internal Design Review
LS1 status 28/04/2014.
BEAM LOSS MONITORS The BLM system Status of the monitors
SEM Calibration in H6 Beam Line, 20cm Cupper Target
Warm Magnet Thresholds
BLM internal review M.Hodgson
Report on Beam Loss Monitors
Hall C Dump Status Beam Resuscitation Review
Injection Region BLM changes
BLM planning 03/02/2014.
Hardware Commissioning
Orange box input.
Presentation transcript:

Tunnel hardware installation Grounding scheme Shielded signal and high voltage cables Floating ground to avoid ground loops BLM AUDIT 2008 Ewald Effinger AB-BI-BL

Tunnel hardware installation Schemes of the arc installation 6 Ionization chambers Filter capacitors and resistors are installed in the IC Signal cable length 3 to 11m BLM AUDIT 2008 Ewald Effinger AB-BI-BL

Tunnel hardware installation Schemes of the straight section installation Ionization chambers Filter capacitors and resistors are installed in the IC Signal cable length up to 600m BLM AUDIT 2008 Ewald Effinger AB-BI-BL

Tunnel hardware installation Schemes of the collimation installation Ionization chambers and secondary emission monitors Additional 150kΩ resistor installed Filter capacitors are installed in the BJBHT Signal cable length up to 600m BLM AUDIT 2008 Ewald Effinger AB-BI-BL

Tunnel hardware installation Schemes of the dump installation Ionization chambers and secondary emission monitors Additional 150kΩ resistor is used in the IC Filter capacitors are installed in the BJBHT Filter installed before the BJBAP BLM AUDIT 2008 Ewald Effinger AB-BI-BL