Offtake Workstream : 19 March 2012

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Proposer: Matthew Hatch Panel Date: 20/10/16
Exit Capacity Release Methodology Statement
Review of Demand Estimation Times for Modification Proposal 461
Modification Proposal 0283 Update
Offtake Workstream : 8th September 2010
Transmission Workstream 4th July 2007
Action 0002: Meter Error Notifications
Transmission Workgroup – 1st December 2011
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Richard Fairholme, E.ON UK
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Confirmation Notice Period for Certain ‘Unique’ Sites
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
2 hour / 5% Rule Bethan Winter.
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Richard Fairholme Transmission Workstream, 2nd October 2008
7th July 2011 Transmission Workgroup - Elexon
Publication of Zonal Flex Data
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Update on Exit Capacity Substitution and Revision
Review of Physical Regime Times for Modification Proposal 461
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
UNC Modification Proposal 0201 National Grid Distribution
Flow Swaps at NTS / LDZ offtakes
DN Interruption & Charging
MOD Deemed applications – User pays initial thoughts.
Meeting Friday 13th September 2013 Hayley Burden
Transmission Workstream – Partial Assignment
Proposed Transitional Gas Exit Arrangements
UNC Transmission Workstream 15th June 2005
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Nexus Workgroup Mod 0473 Presentation
MP0131: Meter Error Notifications
Stefan Leedham Transmission Workstream 2nd November 2006
Key Impacts Modification Proposals Legal Text Modification Reports.
Transmission Workstream, 1 Mar 07
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Offtake Workstream : 19 March 2012 UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Offtake Workstream : 19 March 2012

HIGH LEVEL OPTIONS FOR CHANGE? Preferred Option – 0407. Simple, well understood proposal. NG NTS assessing impacts of removal and impact of GDNs non compliance to date Other possible options ? Replace the LDZ measure of 2 hour 5% with LDZ specific absolute value (e.g. xx Mcmd). Capture LDZ specifics in annex to Section I of OAD Retain 2 hour 5% rule, but exclude VLDMC’s from rule. Invest to retain existing rules Amend 2 hour 5% rule so that rule is (5% of MDQ) Concept of LDZ NExA (effectively this is what the OAD is), but with LDZ specific parameters.