Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.

Similar presentations


Presentation on theme: "Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream."— Presentation transcript:

1 Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream

2 What are NTS Operational Flows? NTS/LDZ and LDZ/LDZ Offtakes only Requirements as to the submission of Offtake Profile Notifications in relation to NTS/LDZ Offtakes Pressure provisions at NTS/LDZ Offtakes Other operational provisions relation to LDZs and NTS/LDZ Offtakes

3 Why are we here? Internal review of business processes vs OAD requirements identified inconsistencies Pre network sales ‘Operating Agreement between the National and Area Control Centres’ Offtake Arrangements Document implemented in 2005 Amended via Mod 195AV in April 2009 Some issues remain UNC review proposal required

4 Examples of current issues Offtake Profile Notice submissions –OAD I.2.3.3 (b) vs 2.1.5 (b) vs 6.1.1 (a) –3 variants potentially at odds with each other…none entirely fit for purpose? –Similarly OAD I2.3.5 vs 2.4.4 –Potentially conflicting timeframes re OPN submissions

5 Things to consider Should any conditions in OAD be amended to reflect a more relevant condition? Are there any absent conditions which should be included? What are the benefits for both parties (NTS and DNO) by adhering to existing OAD clauses (which may create additional workloads) to warrant full compliance?

6 Proposed Terms of Reference General review of areas covered in Section I Comparison of working practices versus OAD requirements Availability and understanding of OPN submissions/usage Availability and understanding of pressure submissions/usage Measurement of flat overruns

7 Going forward WWU raise UNC Review Proposal (June 2010) 3-5 meetings 1-2 topics per session Key personnel required for specific topics First meeting July 2010, monthly thereafter

8 Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream