Flow Swaps at NTS / LDZ offtakes

Similar presentations


Presentation on theme: "Flow Swaps at NTS / LDZ offtakes"— Presentation transcript:

1 Flow Swaps at NTS / LDZ offtakes
April 2012

2 Maintenance at NTS / LDZ Offtakes
Information on maintenance impacting the NTS / LDZ Offtakes is shared between NTS and the DNs as per: Section G of the Offtake Arrangement document Safe Control or Operations Interface Procedures Permitry and Safe Control of Operation processes According to the above, information sharing begins up to 30 months before the work takes place However, resulting flow / capacity swaps are only confirmed under Paragraph 2.4 of Section I of the OAD, which happens after initial OPNs have been provided at D-1

3 Proposal It should be possible to approve flow / capacity swaps in line with maintenance planning timescales e.g. as part of the NRO It should be possible for flow / capacity swaps to be requested by NTS or the DN for a given start and end date (gasdays) in line with the planned work

4 Proposed Timetable Modification proposal to May UNC Modification panel
To Offtake workgroup late May 2012 Implementation prior to October 2012