Portfolio Analysis Mike Hopkins

Slides:



Advertisements
Similar presentations
Will CO2 Change What We Do?
Advertisements

1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
Pasadena Water & Power 2009 Integrated Resource Plan Public Meeting #3 December 17, 2008.
Energy Planning and Recent Regulatory Developments Northwest Energy Systems Symposium (NWESS) University of Washington February 22, 2008 Nicolas Garcia.
Pasadena Water & Power 2009 Integrated Resource Plan Advisory Group Meeting #5 December 17, 2008.
1 Portfolio Analysis Mike Hopkins Senior Manager, Price Risk & Resource Planning.
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Generation Portfolio Options Study Philip O’Donnell Manager, Generation Analysis 14 October 2009.
Energy Analysis Department Cost-Effectiveness Valuation Framework for Demand Response Resources: Guidelines and Suggestions Chuck Goldman Lawrence Berkeley.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
1 Introduction to the Regional Portfolio Model Michael Schilmoeller NW Power and Conservation Council Thursday, June 10, 2010.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
Balanced Portfolio for Reliable Electricity System YES Inc. Brief Assessment.
Geothermal Energy Portfolio from a Utility Perspective Marilynn Semro Seattle City Light May 11, 2005 How do you know what you need and is Geothermal “it”?
1 Market Price Forecasts and PPA Rate Scenarios Tony Liu Price Risk Analyst.
1 Wrap Up & Next Steps Mike Hopkins Senior Manager, Price Risk & Resource Planning.
1 Proposed Input Assumptions to RTF Cost-Effectiveness Determinations February 2, 2010.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
FortisBC Inc. Resource Planning Advisory Group July 28, 2015 Workshop.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
MTS Working Group DER Value Components (draft rev 2) Jan. 20, 2015.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
World Energy and Environmental Outlook to 2030
Communities Renewable Energy Study
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Haida Gwaii Community Electricity Plan
Integrated Resource Plan 2016
Energy Services Company Models: Opportunities for Transit
Integrated Resource Plan 1
CLIMATE CHANGE POLICY SCENARIOS - BULGARIA
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Chuck Goldman Lawrence Berkeley National Laboratory
2017 Integrated Resource Plan
Demand Response in the 7th Power Plan
Idaho Power 2017 Integrated Resource Plan
HOMER.
Energy Services Company Models: Opportunities for Transit
Outline Energy demand and prices Reserves and new sources of energy supply.
Key Findings and Resource Strategy
Western Wind and Solar Integration Study Phase 1
Scenario Scoping Process
The Green Communities Act: WMECO perspective
Byron Woertz, Manager—System Adequacy Planning
Long Term Grid Assessment – Preparing for 2018 Studies
Scenario Scoping Process
Byron Woertz, Manager—System Adequacy Planning
Forecasting and Operations CAISO Case
Discussions about the Role of Nuclear Power for Achieving the Paris Agreement in Japan Yutaka Nagata and Sumio Hamagata Socio-economic Research Center.
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Creating Benefits for New England: Putting the Pieces Together
FortisBC Inc. Resource Planning Advisory Group
Planning Reserve Margin
Market Price Forecasts and PPA Rate Scenarios
Load-Resource Balance
Wrap Up & Next Steps Mike Hopkins
Creating Benefits for New England: Putting the Pieces Together
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

Portfolio Analysis Mike Hopkins Senior Manager, Price Risk & Resource Planning

What is Portfolio Analysis? Evaluation of different groupings of demand-side and supply-side resources to meet load forecast Considers both energy and capacity requirements Enables assessment of tradeoffs between different portfolios How do the different portfolios perform under changing conditions? Enables selection of preferred portfolio to meet the objectives FBC directed to do portfolio analysis in BCUC acceptance of 2012 LTRP

Portfolio Analysis Process 1. Load-Resource Balance Energy Gaps Capacity Gaps 2. Develop Feasible Resource Options 3. Identify Uncertainties & Risks (Load, DSM, Market, Resources) 4a. Develop Base Portfolio 5. Evaluate Portfolios A portfolio is a set of resources that specifies: Which resources to acquire? When each resource is acquired? Portfolio analysis is a process to develop portfolios, analyze their performance, and select the preferred portfolio The process uses both Quantitative modeling techniques (mathematical programming, probabilistic analysis, excel-based tools developed in-house for cost saving and transparency purposes) and Qualitative judgments Base Portfolio would be determined by lowest cost NPV Alternative portfolios would be based on consideration of cost, environmental or other factors For example, one portfolio could include nat gas while another might just include clean or renewable resources -In step 1, we consider LRB before any DSM -In step 2, we pre-screen resource options and include both demand and supply-side resources (cost-effective DSM is usually a preferred resource for meeting the objectives and is almost like a default resource) – e.g. we may not need large capacity resources like PHS or large hydro dam projects -In step 3, we examine uncertainty/risks with both existing (e.g. our generation and water mgmt) and future resources (e.g. solar costs or gas prices for gas gen) -Step 4 and 5 assumes expected forecast -Step 5 includes evaluation based on objectives – e.g. cost-effective, environmental, technical/size/flexibility – also includes PRM to see if the portfolios meet the PRM criteria (e.g. some gas-fired gen with forced outage rates may not meet PRM requirements) – -we will also evaluate rate impacts on customers of the different portfolios -Step 6 includes contingency risk analysis for the preferred portfolio – e.g. “what if” scenarios 4b. Develop Alternative Portfolios 6. Preferred Portfolio 2

Portfolio Analysis Technical Financial Environmental Social/Economic Consideration of Resource attributes: Technical Financial Environmental Technical – baseload, peaking, intermittent, how resources fit our load requirements Financial – e.g. capital and operating costs, avoided transmission cost Environmental – e.g. GHG emissions – we may rank resource options using high, med, low Social/Economic – i.e. contribution to economy (e.g. GDP, employment, government revenue) – this may be more qualitative than quantitative Social/Economic

Portfolio Analysis – Base Portfolio Assumptions of the base portfolio: Base case load forecast (before DSM & Other Savings) Base case DSM & Other Savings Current carbon tax Mid electricity price Mid gas price Continued access to market purchases 93% clean or renewable resources CEA objective relating to 93% clean or renewable applies to BC Hydro or a prescribed utility CEA self-sufficiency objective is specific to BC Hydro (BC Hydro to be self-sufficient by 2016) and states that other public utilities should consider self-sufficiency - FBC considers this more of a LT objective - while there is currently low-cost market electricity supply, there may be risks with LT reliance on market supply as noted in FBC 2012 LTRP

Portfolio Analysis – Alternative Portfolios Possible alternative portfolios: Self-sufficiency (no market supply) 100% market reliance More conservative DSM No 93% clean or renewable requirement Flexible termination of BCH PPA More aggressive DSM 100% clean or renewable resources

Portfolio Analysis Criteria to evaluate portfolios: Economics (cost, rate impacts) Self-sufficiency Environment (e.g. GHG emissions) Clean or renewable Resource adequacy (LOLE target) Portfolio evaluation: Score or ranking Sensitivity analysis: e.g. high/low electricity/gas/carbon prices Contingency analysis on the preferred portfolio: e.g. high/low gaps

Questions?