WOOD LIGHT FRAME CONSTRUCTION

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Exterior Window and Door Frames
Chapter 18 Windows and Doors.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
Interior Wall and Ceiling Finish
Unit 8 Fastening Systems
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Interior Wall and Ceiling Finish
Chapter 24 Finish Ceilings & Floors
8. INTERIOR FINISHES FOR WOOD LIGHT FRAME CONSTRUCTION
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
CON 4003 Construction Estimating Prof R. V. Locurcio.
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Air Barriers.
11. MASONRY LOADBEARING WALL CONSTRUCTION
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Chapter 23 Interior Walls & Partitions. Interior Partitions Performance Criteria  Strength  Fire Resistance  Durability  Acoustical Isolation Materials.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Chapter 4: Air Leakage Control: Materials and Techniques
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Wall and Ceiling Construction Vocabulary
Chapter 14 Notes. Parquet – Mastic – Resilient (Flooring)– Joist – Terrazzo–
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
 Helps to prevent the transfer of heat either into or out of a building  Winter – keep heat in  Summer – keep heat out  Heat is transferred through.
Chapter 22 Selecting Interior Finishes
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Dry lining by direct bond – overview
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Wall Framing Grimsby Secondary School Technology Dept.
PLASTERBOARDS Plasterboard is a rigid flat sheet material which comprises of a core of gypsum plaster with the surfaces covered by stout paper. This covering.
Cladding attachment.
 Overview of Interior Finishes  Types  Examples.
Welding is a fabrication process that joins materials, usually metals, by causing coalescence. Some of the best known welding methods include: shielded.
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
APPLICATIONS OF TECHNOLOGY
7 INTERIOR FINISHES FOR WOOD LIGHT FRAME CONSTRUCTION
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Major Steps In Building a SFR
Wood Frame Systems Civil Engineering and Architecture®
Warm-up 9/19/16 What template are we using?
Chapter 10 Construction Basics.
Facade Panes Dealers in UAE
Electrical Gas Plumbing Heating & Cooling
How to Build a House.
INTD 503- Materials Topic: Partition Walls
Common Components of a Traditional Wood Framed Building
INTD 503- Materials Topic: Wall Coverings
Common Components of a Traditional Wood Framed Building
Common Components of a Traditional Wood Framed Building
© OnCourse Learning.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

WOOD LIGHT FRAME CONSTRUCTION CLASS DAY 10 - CHAPTER 7 INTERIOR FINISHES FOR WOOD LIGHT FRAME CONSTRUCTION

Interior Construction Sequence After the floor platform (concrete or wood) is completed, and exterior walls, sheathing, roof structure and decking is in place, the building is “in the dry”, meaning if it rains one can still work inside. Interior Partition Framing is done simultaneously with exterior walls if the building is wood frame. If the building has masonry exterior walls, and/or is steel frame, the interior framing does not happen until the building is “in the dry.” Interior Partition Framing SOME MAY BE ALSO STRUCTURAL FRAMING Rough-in (& MPE Equipment) Code Compliance Inspection PRIOR TO COVERING UP Thermal Insulation PRIOR TO WALL AND CEILING FINISHES (UNLESS BLOWN IN) Ceiling & Wall Materials Interior Millwork, Interior Finishes WALLS FLOORS MPE Fixtures, Devices, Trim, & Appliances SOFT FLOORING

Sequence of Interior Construction, continued Rough-in: Mechanical, Electrical, Plumbing, and special. Thermal Insulation & Vapor Barrier installed Code Compliance Inspection by building official Ceiling & Wall Materials installed Interior Millwork, Interior Finishes, doors, cabinets MPE Fixtures, Devices, Trim, Appliances, & Finish

Copper Water Piping (joints) Waste/Vent Piping WC Rough in Copper Water Piping (joints) Why not PVC? Pipe Insulation

PVC Pipe PVC Pipe - Joints “Glued”

Cast Iron Piping

Vent Pipe Plumbing Chase Why “Stack” Plumbing Fixtures?

Insulated “Flex” Duct

Rare in Residential Construction Sprinkler Pipe Rare in Residential Construction Insulation Flexible Duct Duct Anchorage

Round Duct

Rectangular Ductwork

Isolation Pad Isolation Joint

Electrical Rough in

Electrical rough in using flexible metal conduits

Blocking in Frame Wall to Support Wall Attachments Materials Wood Sheet Metal

More Blocking

Metal shield to prevent nails From being driven into Plumbing pipes

Sealant around pipes to prevent smoke migration From passing through wall space

THERMAL INSULATION Purpose is to slow the passage of heat flow Common insulating materials are spun glass fibers and rock mineral Installation is in interstitial space between outside & inside R-Values are the resistance to the number of BTUs that will travel through a material of given area in a given time period. Purpose RETARDS THE PASSAGE OF HEAT - THERMAL TRANSMISSION OCCUPANTS MORE COMFORTABLE LOWERS UTILITY COSTS Materials MOST COMMON BATT OR BLANKET (GLASS WOOL) BETWEEN STUDS (FRICTION, STAPLED) LOOSE FILL (GLASS OR ROCK WOOL) BLOWN IN RIGID BOARD - POLYSTYRENE APPLIED OVER FRAMING, Installation R-Values RESISTANCE TO HEAT FLOW LARGER R - GREATER RESISTANCE MINIMUN REQUIREMENTS PER CODE LIMITED BY THE THICKNESS OF STUDS, UNLESS ADD’L APPLIED ON THE OUTSIDE OR INSIDE – A primary reason more and more 2x6 studs are being used.

Vapor Barrier installed On warm side of insulation Insulation in Interior Wall Space to prevent sound transmission Exterior Wall

Vapor Barriers on Insulation Insulation can be purchased with or without a vapor barrier. The purpose is to prevent condensation from forming on materials due to moisture in the air and temperature differential. Materials are treated paper, plastic, and aluminum foil Installation is always on the warm side of the insulation. Purpose PREVENT WATER VAPOR FROM ENTERING THE INSULATION AND CONDENSING INTO LIQUID Materials METAL FOIL PLASTIC TREATED PAPER ON THE INSULATON OR AFTER (FULL SHTS) Installation VAPOR RETARDER typically PLACED ON THE WARM (INSIDE) SIDE

Radiant Barriers are used to reduce the flow of solar heat from infrared and Ultraviolet radiation by reflection. Wall sheathing faced with white plastic or aluminum foil on the outer surface reflect UVs and Infrared. Reflective barriers also include a material called “house wrap”, which not only reflects but provides a barrier to air infiltration due to wind.

Wall & Ceiling Finish Ceilings: Drywall, with textured and painted surface, sometimes acoustic spray. Plaster once was the norm, but now is rarely used because of labor cost. Walls: Drywall, with a variety of attached material, such as texture & paint, wallpaper, vinyl fabric, paneling, tile. Plaster Not often used CEMENTITIOUS TWO - THREE COAT SYSTEM LABOR INTENSIVE COSTLY LARGELY REPLACED BY DRYWALL Gypsum Drywall LOWER COST QUICKER INSTALLATION LESS SKILLED CRAFTSMAN NEEDED GYPSUM WRAPPED WITH PAPER Veneer Plaster

GYPSUM DRYWALL - STACKED

Beveled Joints

DRYWALL MATERIALS Corner bead Joint Reinforcing Tape Joint Compound Joint Tape Applied

Drywall Joints are first taped with a 2” wide paper made for the purpose and set smoothly into a water soluble joint compound. Finishing Operations & Materials/Equipment Taped joints are “floated” With a bedding compound And toweled smooth, then Sanded to conceal all joints And fasteners.

Applying Joint Compound

Sanding

INTERIOR DOORS Decorative panel doors are available in a variety of natural wood, plastic, or metal. Materials Interior Doors Panel PANELS W/ SIDE STILES AND T/B RAILS DEVELOPED TO MIM\NIMIZE CHANGES AND DISTORTION DUE TO CHANGES IN MOISTURE CONTENT Flush COME IN A VARIETY OF VENEERS TWO TYPES Solid Core TWO VENEERED FACES W/ CORE OF WOOD BLOCKS OR BONDED WOOD CHIPS HEAVY, STRONGER, RESIST SOUND BETTER THAN HOLLOW CAORE USES; ENTRY DOORS AND COMMERICIAL Hollow Core - TWO FACE VENEERS BONDED TO WOOD OR PAPERBOARD SPACERS Prehung - HINGED AND FITTED TO FRAMES AT THE FACTORY Casings - BUILT IN PLACE OR COME W/ PREHUNG (ALSO “SPLIT JAMBS) Flush type doors are Available in a variety of Natural wood veneers or pressed wood, and are Made with either a solid Core or hollow core as The need dictates.

FLUSH TYPE DOORS Face Veneers Core “Solid” Hollow Core Edge Strips Wood Laminate Core “Solid” Composite Wood Blocking Hollow Core Veneer supported By cardboard or Wood. Edge Strips FLUSH TYPE DOORS Solid Core Hollow Core

DOOR INSTALLATION Split Jamb “Pre-Hung” - hinged and fitted to the frames at the factory

Counter tops and Special Surfaces Ceramic Tile and Special Finishes Hard tile floors & counters Showers Hard tile wainscot Millwork and Finish Carpentry Door and window casings and trim Cabinets and built in millwork Painting, Staining, & Sealers Application of opaque and transparent finishes Counter tops and Special Surfaces Window Casings MUCH THE SAME AS DOORS PLACED INTO ROUGH OPENING TRIMMED OUT Baseboards BASE FOR SHORT AT THE JUNCTURE OF THE WALL AND THE FLOOR PROTECT THE BOTTOM OF THE WALL AND CLOSE ANY GAP AT THE BASE OF THE WALL FASTENERS - FINISH NAILS TO THE FRAMING Cabinets CONSTRUCTED AT A CABINETRY SHOP AND BROUGHT TO THE PROJECT TOPS INSTALL AT THE PROJECT

Plumbing Finish Electrical Finish HVAC Finish Install plumbing finish piping, faucets, & valves Install plumbing fixtures Install vents Electrical Finish Install lighting fixtures and switches Install receptacles and special outlets Make equipment connections HVAC Finish Install heating and air conditioning equipment Install air supply registers and return air grilles Thermostats and filters Plumbing Fixtures WATER CLOSETS SINKS SHOWERS & TUBS Electrical Fixtures, Devices & Trim LIGHT FIXTURES DUPLEX, SWITCHES COVER PLATES HVAC Trim GRILLS & REGISTERS

RESILIENT FLOORING Resilient flooring is material such as vinyl composition tile, vinyl tile, or sheet vinyl. It is a material that must be glued down at the proper temperature, then protected from construction traffic.

WOOD FLOORING Pre finished wood flooring is another material that must be protected from construction traffic. Unfinished hardwood flooring can be installed early, then finished as one of the last steps. Types of wood flooring include blind nailed tongue & grooved, square edge, or wood tiles such as parquet.

CARPET Carpet is a final material that should not be installed until last – for obvious reasons. There are two types of carpet, based on the method of installation. Stretch carpet is placed over a resilient pad and held in place with barbed strips fastened to the floor. So called, ‘commercial carpet’ is a very tight weave material, and is installed with a mastic adhesive troweled on the floor.

Many of the processes of finish within a project overlap in the time frame in which they are installed. But every consideration must be given and demanded by the Architect to guard against damage of one material for the sake of another. Finish surfaces should never be done prior to other trades that could cause damage, without adequate protection to the materials. The General Conditions of the Contract for any project will state that damage done to adjacent finish shall be paid for by the trade responsible for the damage.