Introduction and Overview

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
Integration and Test GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
March ’05 Face to Face Meeting Introduction
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: Deputy for Systems Engineering
GLAST Large Area Telescope:
Presentation transcript:

Introduction and Overview Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: I & T Peer Review Introduction and Overview Elliott Bloom SU-SLAC Subsystem Manager elliott@slac.stanford.edu 650-926-2469

Outline Integration and Test Responsibilities Department Organization Chart RFA Closeouts Findings and recommendations Actions Applicable Requirements Drawing Status/overview

Integration and Test Responsibilities I & T “subsystem” is focal point of LAT integration, test and calibration activities. I & T team plans, manages and execute activities. ACD, ELX, CAL, Mechanical Systems, SAS, and TKR subsystem teams and other Collaboration members provide LAT hardware/software that is tested, integrated and then tested and calibrated by I&T. The subsystems and other collaboration members also support Integration & Test & Calibration of the Calibration Unit and full LAT. I & T Subsystem activities for entire mission. LAT integration planning and management. Mechanical integration and MGSE and EGSE development. Plan environmental tests and execute. Plan particle tests and execute. Particle beam and test equipment development. Ground verification and calibration of LAT. Ground science verification of LAT. Support activities at Spacecraft Vendor and launch facility. Commissioning of LAT in orbit -- deliver a working and calibrated instrument to IOC. Fabrication Phase

I&T Organization Chart I&T Manager E. Bloom (SU-SLAC) WBS 4.1.9 I&T Engineer B. Grist (SU-SLAC) WBS 4.1.9.1 Reliability & QA D. Marsh (SU-SLAC) WBS 4.1.9.2 Instrument Operations Coordinator D. Lung (SU-SLAC)-acting WBS 4.1.9.3 Mechanical Ground Support Equipment E. Gawehn (SU-SLAC) WBS 4.1.9.4 Online Software R. Claus (SU-SLAC) WBS 4.1.9.5 Integration, Facilities, Configuration, and Test L. Wai (SU-SLAC) WBS 4.1.9.6 Particle Test Manager G. Godfrey (SU-SLAC) WBS 4.1.9.7 Environmental Test Manager M. Lovellette (NRL) WBS 4.1.9.8 Science Verification, Analysis, and Calibration E. do Couto e Silva (SU-SLAC) WBS 4.1.9.9 Mission E. Bloom (SU-SLAC) WBS 4.1.9.A

RFA Closeout (Completed) Findings, Recommendations, RFA responses: Complete the reworked WBS with review and approval by project management by February 2002. Action: The reworked WBS has been completed and approved. It is available through the LAT document system. Complete the reworked cost and milestones with review and approval by project management by March 2002. Action: New PMCS completed, and approved by LAT management. Recommend subsystem baseline review as soon as possible after the work on items 1 and 2 are complete. Action: System baselined at LAT delta Baseline review in early August 2002. Write the integration and electronics integration plans and get them under configuration management by March 2002. Action: I&T has completed a CDR level Integrate and Test Plan - LAT-MD-01376 and references therein, will be under configuration management by CDR.

RFA Closeout (Completed) (Cont) Findings, Recommendations, RFA responses (Cont): Write a baseline level plan for the airborne test by March 2002 and ensure that any requirements on the subsystems levied by this test are flowed to subsystem managers. Action: The airborne test plan draft, LAT-TD-00550, has been reviewed by Systems Engineering and Subsystem Managers.It is referenced in the integration and test plan. The airplane test has been moved from being a required test to a test that may be used for risk mitigation. Tests of EM and proto-flight components with power on in a simulated airplane environment may be required. A plan to proceed to decision by November 1, 2003 has been prepared by I&T and reviewed by SE. Rev 0 assembly traveler should be written and under configuration control before Qualification Unit A arrives. Action: Draft 0 completed, LAT-TD-00856, and available for this review. Provide an initial, top-level estimate of the cost/schedule impact of replacing a Tracker tower after complete instrument assembly. (This AI was originally AI-Mech-03). Action: Estimate based on 24/7 extrapolation of PMCS costs and schedule is available in RFA database.

Suggestion Employ experienced I&T people to work on the CU and LAT I&T. Action: See IFCT presentation for our flight hardware I&T plan.

LAT Functional Performance (SE and I&T) Electrical Functional Tests Structural and Mechanical Tests EMC/EMI Tests Thermal Verification Tests Visual Inspection Instrument Monitoring End-to-end test (at ~ 35,000 ft in a jet airplane during transport to NRL for environmental tests) (TBR) Produce a Working Instrument

Science Performance (SE, IS, and I&T ) Particle tests Calibration Science verification tests Produce a Scientifically Working Instrument

Drawing Status / Overview Drawings Released so far: EM-Cal Rotation / Support Stand 31 Van de Graaff Support Stand 24 Drawing Sheet count to Release this week or before Peer Review Van de Graaff on Support Stand / Other EM-Cal Rotation Assembly 5 Cal Rotation Interface Assembly 10 EM-Cal Proof Load Article 8 EM Single Bay Assembly 10 Calorimeter Lift Fixture 3 Drawings to Release before CDR 1 x 4 Calibration Unit Lift Fixture 3 Estimated sheet count for drawings to be worked between Peer Review and CDR EM Single Bay Lift Fixture 3 CU X, Y, Theta Movement System 56 Grid Perimeter Ring (GPR) 4* GPR to Grid Brackets 15* LAT Tilt Over Stand 11 LAT Tilt Over Stand Pivot Support 10 ACD Integration Stand 11 Vibe Test Fixture 6* Radiator Support 15 *spacecraft-LAT interface specification required. = 94 = 36 = 131

Drawing Status / Overview (Continued) Items to be worked Post CDR LAT Transport Container / Lift Fixture (significant work requires us to be well along on airplane test evaluation) Acoustic Test SC Simulator (awaits August 03 Final Need Justifies Cost Decision) Thermal Vac Support Kit (Includes LAT Perimeter Heat Exchanger and Vibe Test Fixture 90º Brackets) ACD Lift Fixture, Integration Frame and Proof Test Article CU Test/LAT/Observatory Integration Thermal – Humidity Control Cart CU Transport Box