Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team

Slides:



Advertisements
Similar presentations
WWRP THORPEX PDP WORKING GROUP MEETING 5.15 pm Tuesday 21 June (Buffet Supper) 6.00 pm Meeting Starts ECMWF Meeting Room 1 OFFICE BLOCK EXTENSION.
Advertisements

WWRP 1 THORPEX Summary Paper David Parsons U of Oklahoma School of Meteorology
Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Model error diagnosis: One possible contribution of the PDP community to the THORPEX goals Thomas Jung 1,2 & members of the THORPEX PDP and WGNE & Mark.
Sub-seasonal to seasonal prediction David Anderson.
Introduction Slides for GIFS-TIGGE-11 meeting Richard Swinbank Masayuki Kyouda GIFS-TIGGE WG, Exeter, June 2013.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
“A LPB demonstration project” Celeste Saulo CIMA and Dept. of Atmos. and Ocean Sciences University of Buenos Aires Argentina Christopher Cunningham Center.
Proposal for a WWRP High Impact Weather Project Sarah Jones, Brian Golding Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat.
1 Joint Working Group Forecast Verification Research  Beth Ebert (BOM, Australia) co-chair  Laurie Wilson (CMC, Canada) co-chair Barb Brown (NCAR, USA)
AMS Presidential Forum January 2013© ECMWF Slide 1 Predicting Weather and Climate: Scientific progress and future opportunities Alan Thorpe AMS Presidential.
Modelling Theme White Paper G. Flato, G. Meehl and C. Jakob.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
The future of GODAE activities through the IOC Albert Fischer IGST, St John’s NL, Canada, 7-9 August 2007.
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
WWRP The THORPEX Mid-Term Review David Burridge Of no particular abode.
Report on the 25 th WGNE meeting Hosted by DWD in Offenbach, Germany 2- 9 November 2009 Presented by Pierre Gauthier Department of Earth and Atmospheric.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
Linkage between the research community and operational center - case examples - First meeting of the WWRP PDEF working group Karlsruhe, Germany May,
The TIGGE experience Richard Swinbank and Masayuki Kyouda with thanks to members of GIFS-TIGGE WG & THORPEX IPO S2S project planning group meeting, Exeter,
Report from GIFS-TIGGE working group Richard Swinbank, and Zoltan Toth, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues Presentation.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
WWRP THORPEX Alan Dickinson Chair THORPEX ICSC and David Burridge THORPEX IPO.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
Report from GIFS-TIGGE working group Richard Swinbank, and Young-Youn Park, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues.
GIFS-FDP Introduction to Framework Plan and links with SWFDP Richard Swinbank & Zoltan Toth.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
WWRP Commission of Atmospheric Sciences - new projects Polar Prediction project – “The Commission concurred with the Executive Council Panel of Experts.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
11 THORPEX Update Jim Caughey THORPEX IPO WMO Geneva Data Assimilation and Observing Systems Working Group 4 th Meeting Met Office, Exeter June.
Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”
Strategic Planning and Future Structure of the World Weather Research Programme (WWRP) Gilbert Brunet WWRP/JSC Chair Acknowledgements to Michel Béland.
© Crown Copyright Source: Met Office Polar Prediction Project (PPP) Update In 2001, the World Meteorological Congress decided to embark on a decadal.
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
Page 1 Andrew Lorenc WOAP 2006 © Crown copyright 2006 Andrew Lorenc Head of Data Assimilation & Ensembles Numerical Weather Prediction Met Office, UK Data.
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
© Crown copyright Met Office WGNE activities and future directions Andy Brown.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Introduction slides for Joint GIFS-TIGGE/PDP Meeting Richard Swinbank, Masayuki Kyouda, Heini Wernli, Istvan Szunyogh Joint PDP & GIFS-TIGGE WG meeting.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
WORLD CLIMATE RESEARCH PROGRAMME
WG on Nowcasting Research World Meteorological Organization
Ayrton Zadra and Keith Williams (WGNE co-chairs) WMAC5 25/04/16
Key Questions What are the key priorities in prediction on timescales from a hour to a season? 5 Societal needs 5 Key prediction/science questions 5 technological.
S2S sub-project on verification (and products)
World Weather Research Programme SSC meeting October 2016
Research to operations (R2O)
REPORT BY THE CHAIR OF THE OPEN PROGRAMME AREA GROUP ON THE DATA-PROCESSING AND FORECASTING SYSTEM Ken Mylne
Open Science Conference
Introduction Slides for GIFS-TIGGE-12 meeting
THORPEX-Europe Meeting Summary Dale Barker
THORPEX Update Jim Caughey THORPEX IPO WMO Geneva GIFS-TIGGE
Reports to TIGGE – 9, Geneva Aug 31- Sept 2, 2011
THORPEX report to the CAS Management Group Alan Dickinson ICSC Chair
Links with GEO.
Causes of improvements to NWP (1979 – 2009)
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Science Objectives contained in three categories
Report from GIFS-TIGGE working group
4th WGNE Workshop on Systematic Errors in Weather and Climate Models
SWFDP Key Issues for GIFS-TIGGE
GEOWOW update Richard Swinbank GIFS-TIGGE meeting March 2014
High Impact Weather Emerging challenge identified at CASXVI
MOGREPS developments and TIGGE
The IPO to organise a review Encouraged review
Activities WG-MWFR Help set up/involvement in RDP’s/FDP’s (COPS, Sochi, HYMEX, …) Push mesoscale research cooperation / proposals on: Mesoscale modelling.
What is our Vision for Decadal
Presentation transcript:

Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank Masayuki Kyouda GIFS-TIGGE WG, Exeter, June 2013

Contents Post-THORPEX plans Evolution of GIFS-TIGGE Proposed expert team Discussion…

WWRP structure 3 3

Legacy THORPEX Subseasonal to Seasonal Prediction Project PCPI WGSIP MJO TF WGDAOS Subseasonal to Seasonal Prediction Project WGPDP JWGFVR WGNR /MFR Polar Prediction Project High Impact Weather Project WGNE SWFDP WGSERA WGTMR 4 4

WWRP structure and links to WCRP 5 5

TIGGE – Research focus The TIGGE project (& GIFS-TIGGE working group) was originally focused on the technical work enabling the establishment of the TIGGE archive dataset. The main scientific aspects of THORPEX were covered by Predictability & Dynamical Processes WG, and also Data Assimilation & Observing Systems WG(s). Following the successful establishment of the TIGGE dataset, the focus of the GIFS-TIGGE working group has shifted towards research on ensemble forecasting. Particular topics of interest include: a posteriori calibration of ensemble forecasts; combination of ensembles produced by multiple models; research on and development of probabilistic forecast products. More recently, we have broadened our range of interest to cover improvement of EPSs, including: representing uncertainties in initial conditions stochastic physics & other techniques to account for model error

Virtuous Circle Develop, Improve Evaluate, Diagnose Ensemble Forecasts To improve EPSs we need to develop a virtuous circle – best with a single group with focus on ensemble prediction

Evolution of TIGGE & GIFS TIGGE development Calibration, combination, products EPS improvement Time GIFS-TIGGE should also be a forum to focus on R&D directed at improving our EPS systems, to help us develop a “virtuous circle”. We introduced a section of the WG meeting for discussing ensemble initial conditions, stochastic physics & other aspects of improving our EPSs. We also need to maintain an interest in ensemble verification & links with convective-scale EPS and the new sub-seasonal to seasonal group.

Looking forward - A proposed new working group The logical evolution of an increased focus on research would be the creation of a Predictability Dynamics & Ensemble Forecasting working group, combining much of the current GIFS-TIGGE and PDP groups. This new group would provide a centre of scientific expertise on dynamics, predictability and ensemble forecasting that is currently lacking in the core WWRP programme.

Scope A centre of scientific expertise on dynamics, predictability and ensemble forecasting Bridge between academic & operational communities Promote use of TIGGE and TIGGE-LAM Scientific issues include Growth & evolution of errors Stochastic representation of unresolved processes Short- to medium-range forecast timescales (potentially longer)

Relationship with other teams / groups Clear linkages with WGNE and other WWRP expert teams Numerical modelling, ensembles, data assimilation, stochastic parameterization & evaluation all closely linked on weather forecast & climate timescales. Too big for a single expert team – need a set of more specialised teams. Providing expert support to WWRP projects (S2S, PPP, HIW, RDPs & FDPs)

Other issues Development of severe weather products Would fit well into scope of proposed HIW project Technical management of data archives Ongoing management could be done by a liaison group of archive centres & some or all data providers. Could report to PDEF team (or HIW project)? Representative of technical group on ET. Transition arrangements Work towards merger of GIFS-TIGGE and PDP groups at end of 2014 New members of both groups chosen for role in new team.

Next Steps Discuss here and at joint THORPEX/ICSC and WWRP/JSC meeting. What is the process for approving the new group?