Capital Improvement Task Force Update

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Controlling Moisture Steps to a Healthy Home Series Educational programs of the Texas A&M AgriLife Extension Service are open to all people without regard.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Cathedral of the Immaculate Conception Project Information Session.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Click to continue…. Railroad Track wetland Image Date: December 2003.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Facilities Management and Design Chapter 11 Building Structure, Finishes and Site.
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
Lutheran Church of the Good Shepherd Building Committee Update May 2014.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Green Building Design Scott Lowe Professor Civil and Environmental Engineering Department Manhattan College.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
Parking Lot 53 Hydraulic Analysis Aaron Gutierrez Aaron Libson William Ryman Alejandro Valenzuela.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
Your House as a Healthy System Bruce Stahlberg. Improvements / Remodeling When one has finished building one's house, one suddenly realizes that in the.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
Draft Rancho Colorados Swim & Tennis Club Master Plan Overview.
Multifamily Air Sealing Program Bobbi Wilhelm/John Forde Implementation & Evaluation protocols March 20, 2013.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Finishing the Building
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
PARKING LOT Protecting Chesapeake Bay  Create underground storm water management system to prevent flooding, erosion, pollution of the Bay  Plant bioswales.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Update Presentation January 12, 2015 Town of Concord School Bus Transportation and Maintenance Center Town Project Team: Christopher Whelan – Town Manager.
Work Related to Senate Bill 2202 (effective January 1, 2001)
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Understanding the FHA 203K STREAMLINE AfterBefore.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
MENTAL HEALTH CLINIC Siting Process and Analysis.
CAD-Architecture Inst: Mr. Johnston Logan High School
White Pigeon Community Schools
Upon completion of this module, you will be able to:
Capital Facilities Program Update San Rafael City Schools
Fall 2017 Update: Physical properties and sinking fund
Construction Documents
Chapter 10 Construction Basics.
Caryl School Open Hearing March 26, 2007.
FLOATING STUDENT RESIDENCE
4th Annual Construction Law Summit
UNION GROVE ELEMENTARY REFERENDUM
St. Clair County Community College, Port Huron, Michigan
2018 Bond Review and Proposal
Mount Vernon Community School
Capital Project Update
Recent Bond Accomplishments
Stoughton Public Library
EAST PENNSBORO AREA SCHOOL DISTRICT
Community Practice Asset Management.
Presentation transcript:

Capital Improvement Task Force Update 09.23.2012

Capital Improvement Task Force • The Council established the Capital Improvement Task Force (CITF) at the Annual Meeting, held in February 2012. The charge of the CITF is to assess deferred maintenance and capital improvement needs of our facility and to prepare recommendations for consideration by the congregation.

Teaming With HGA • At a special congregational meeting in June, the congregation voted to hire the engineering firm of Hammel,Green & Abrahamson (HGA) to help evaluate our issues and develop a long range plan for addressing them. Our work with HGA began in early June and is being completed this month. We held six meetings over the summer with HGA.

Our Goals • At our first meeting with HGA we established our goal – create a “structurally sound, safe, comfortable and dry facility.” We want to meet this goal by being good stewards of our facility and making wise decisions for the future.

Our Priorities Defined • Major issues were ranked in the following order: Roof / Gutter System Water Drainage / Building Leaks / Erosion Structural (Building Settlement) Parking Lot HVAC / Electrical & Plumbing

Timeline June July August Sept. 23 Discovery & Analysis Range of Options Summary Findings Hired HGA

Summary Findings Roof/ Gutter System Findings Options Status Roofing damaged due to hail and improper repairs over the years Gutters damaged due to ice dams Interior finishes (ceiling and walls) damaged due to ice dams. Ice dams are a result of a too warm roof, which is a result of lack of insulation or ventilation. Options Repair and replace damaged slates, flashing and gutters. Install roof insulation on 1963 addition. Status Request for Proposal (RFP) under review. Sent to select contractors Sept. 28 Bids Due

Summary Findings Water Drainage / Building Leaks / Erosion Findings Storm water from downspouts isn’t directed away from building Erosion from too much storm water directed to a specific location (at the stairs, at the north slope, and in the parking lot) Waterproofing systems (at the choir room) deteriorated over the years Options Repair and replace gutters and downspouts. Connect/direct downspouts to retention system (rain gardens) Install foundation drainage Install waterproofing Combination of rain gardens/ infiltration/ and storm water management Status Concepts are estimated for price

Summary Findings Structural Findings Options Status Masonry cracking on the exterior walls and plaster cracking on the interior walls of the chapel Floor slab settlement in the Colonial Room Soil borings reveal a layer of clay under the chapel foundation Geotechnical consultant concluded that the structural settlement is due to the clay consolidation, and that the consolidation is complete Options Add insulation under window wells to avoid frost expansion As insurance against future settlement, add structural stabilization for foundations Status Soil boring and geotechnical evaluation is completed Options for additional stabilization are estimated for price

Summary Findings Parking Lot Findings Options Status Sinkholes have developed due to amount and velocity of storm water running over the parking surface Soil settlement results in uneven parking surface Multiple entrances and exits creates a confusing parking circulation pattern Options Revised parking layout to provide streamlined vehicle circulation, mitigate run-off, and allow for improved and inviting landscaping. Status Revised parking lot concept is estimated for price

Summary Findings HVAC and Electrical Systems Findings Options Status The heating systems consists of steam boilers that are past expected life but are in good shape and are not in danger of failing Ventilation system in sanctuary is undersized per current standards and noisy The original electrical service should be replaced due to age, although there is no imminent need of replacement Options Replace the steam boilers with higher efficiency hot water boilers Modify return air path to quiet the sanctuary ventilation system Replace the 400 amp electrical service and panel boards serving the 1950 and 1960’s addition. Status Replacement cost estimates have been priced.

Existing Roof / Gutter Issues Damaged/Missing Tiles Damaged Dormers and Flashing Damaged Gutters

Roof / Gutter Improvements Repair damaged areas Install insulation & replace roof Roof Repairs Insulate Roof

Existing Drainage / Leaks / Erosion –Issues Poor Downspout Function Wet Building Damaged Site

Existing Drainage / Leaks / Erosion –Issues Downspout Locations

Drainage / Leaks / Erosion –Improvements At Grade Discharge: slope away from building Below Grade Collection: gather and route Downspout Solutions

Drainage / Leaks / Erosion –Improvements Rain Garden Gather Downspouts and direct to Raingarden Waterproof Choir Room Foundation Drainage Downspout & Drainage System

Landscape at the Choir Room

Downspout and Drainage System Accessible Patio (pedestal pavers) Ornamental Plantings Waterproofed Choir Room Rain Garden Foundation Drainage Downspout and Drainage System

Patio above Choir Room

Memorial Garden Option

Existing Structural Issues Chapel Settlement – Exterior Cracks Interior Cracks

Soil Borings Results- Did discover a clay layer under the chapel, didn’t discover a high water table, did discover sandy soil under parking lot

Survey Elevations at Colonial Room 0.01’ -0.18’ -0.08’

Structural Improvements

Parking Lot

Parking and Landscaping Concept Site Plan

Parking and Landscaping Improvements Rain Gardens Improved Parking Lot Play Areas Trees

Storm Water Management Rain garden Underground storm piping Storm water detention Cistern Infiltrate and retain as much as possible, slowly discharge the rest

Storm Water Management

Mechanical and Electrical Existing Issues Old, but still in workable condition

Preliminary Cost Estimates

Preliminary Cost Estimates Cost Estimates based on HGA’s concept documents

Next Steps - Project 1: Roof and Gutter Repairs Wednesday, September 26, 6:30 p.m. Informational meeting in the Gathering Space September 28: Send out RFPs October 18,19: Interview contractors November 4: Congregation votes on recommended plan and contractor

Long Range Plan- Project 2: Waterproofing and Stabilization January 20th, Adult Education: Long range plan presentation and Project #2 Informational Meeting regarding Waterproofing and Stabilization Spring Building Improvement Campaign