EnergiMidt A/S – Energy consultant services Presentation of EnergiMidt A/S BuisnessPartner Case Results.

Slides:



Advertisements
Similar presentations
Convenient services to realize your ideas Partnership Outsourcing for Your Profit and Convenience.
Advertisements

Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Energy Conservation Energy Management.
Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
District heating tariffs as a tool to change consumers behaviour Klaus Sørensen Consul General Royal Danish Consulate St.Petersburg.
Andrea Mariottini Riello Gas Boilers Division
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Energy Conservation Potential of Measurement & Control Systems and Energy-Saving Equipment In Textile (Dyeing) Processes by: Dr. Attia Saad El-Din Energy.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Rhode Island Gas Energy Efficiency Filing Summary February 15, 2007 RI GHG Stakeholders Meeting.
Renewable Energy Pathway Presentation.. What are Energy Pathways. Energy pathways are complete cycles that start with a raw material with energy potential.
Use of renewable energy in the Provinces of Treviso headquarters Maurizio Tufaro Treviso Paving the way for self – sufficient regional Energy supply based.
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
Dr. Hany Elghazaly ENERGY RESEARCH CENTER - ERC Cairo University & AEEE Member September 2013.
Energy Management Practices: Rolling Mills 1. Contents Introduction Energy Intensive Processes & Reduction in Energy Expenditure through Innovative Practices.
Energy Saving in Hospitals: Hong Kong Initiatives
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Missouri Enterprise Helping Missouri Manufacturers Make More, Sell More, Earn More Missouri Manufacturer Survey: The Top Ten Things You Told Us.
Visegrád, November 2013 Egon Erlandsen Special Advisor.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
>>> CRYOSTAR Expanders
Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
Reduses – Ampèrestraat 19D – 3861 NC Nijkerk, NL – Tel – – Applied gas engine heatpumps Thermal energy solutions.
RETScreen® Energy Efficiency Projects
Low Carbon Action Group results. The nature of our business means a large amount of energy needs to be used, but we are looking to compensate that with.
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Cogeneration.
1 Implementation of the Program of Energy Efficiency of Kiev region.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Genesis Solar Module Brochure ™
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
The WW 90°C Project of Biochemie Kundl, Tirol, Austria.
District Heating Technology Improvement of district heating systems efficiency starts at the consumer New calculation tools help consumer and district.
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
- The Environmental Managers - Energy Efficiency Programs in Industrial Companies Energy Efficiency in IPPC Installations.
The EnergyMizer Power Reduction & Conditioning System ®
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
December 22, 2015 EL-TEC Mulej, d.o.o.1 Local, efficient, clean Damjan Mulej Heating without global warming, Euroheat &Power Conference, Brussels, 5 June.
Jens Gröger IEA DSM Task XVI – Competetive Energy Services National Implementation Activities - Germay Helsinki, Motiva, 21th September 2006.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
ISA Toronto Enbridge Gas Distribution Program Incentives & Case Studies January, 2011.
SDK/TT - PRM BNN | 27/03/2014 | © Robert Bosch GmbH All rights reserved, also regarding any disposal, exploitation, reproduction, editing, distribution,
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
1 Energy Solutions for Production Supported by: The sole responsibility for the content of this presentation lies with the authors. It does not necessarily.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
Seminar On Energy Audit Submitted To: Submitted By:
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Industrial Assessment Center Database

The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
Thank you for the opportunity to present our energy efficient product
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Presentation transcript:

EnergiMidt A/S – Energy consultant services Presentation of EnergiMidt A/S BuisnessPartner Case Results

EnergiMidt A/S – Energy consultant services Gitte Wad Thybo Manager Energy Advicing at EnergiMidt A/S Member of the National Energy Efficiency Commitee at Danish Energy (Dansk Energi) Mecanical Engineer Working with Energy Consultancy for 15 years

EnergiMidt A/S EnergiMidt is the local energy and broadband company in the mid Jutland region of Denmark. We supply energy and related services to customers and simultaneously, we are establishing a network of fiberbroadband which gives access to high speed internet, television and voice. When it comes to electricity our principal objects are to ensure a stable supply, competitive electricity prices and to provide outstanding service to our customers. In addition to this, EnergiMidt is involved in areas such as energy consultancy services, safety and quality services and electricians activities. Furthermore we sell a number of products like heat pumps, solar heating and solar cells.

The Vision of EnergiMidt A/S The customers natural choice of supplier As a local, customer-owned company EnergiMidt aims to be the natural choice of supplier when it comes to electricity, broadband based communication, entertainment solutions such as internet, TV and voice offerings plus related products and services. The local supplier EnergiMidt will preserve and strengthen its local position through – in close dialogue with the customers - ongoing improvement and development of products and services with a high level of service, great user-friendliness and top quality to competitive prices. The reliable and dynamic supplier EnergiMidt is a dynamic company who uses modern management principles and a high level of efficiency to achieve an earning that makes continuing development of both employees and company possible.

Energy consultancy services EnergiMidt provides energy consultancy services to both business and private sector. We have comprehensive knowledge and expertise in meeting the energy requirements of companies and institutions, optimizing energy consumption and thus reducing energy costs. EnergiMidt has experience with numerous types of companies and institutions; industries and offices, large and small, public and private. The energy consultants of EnergiMidt are qualified to adapt different solutions to each individual customer in accordance to wishes, needs and ambitions. Our energy consultants are specialized in assessing all forms of energy consumption. Advanced mathematical models are used in combination with a wide range of experience to optimise energy consumption.

Energy consultancy services The energy consultancy services from EnergiMidt varies between a simple and uncomplicated review of electricity consumption to establishment of complex monitoring systems, which cover total consumption of electricity, water and heating. In industries, offices and institutions EnergiMidt assists in the implementation of energy management systems. We have licensed consultants in energy management, energy marking and energy test In municipalities we make agreements about energy savings, energy management and energy certificates. How can the school or kindergarten save energy in their building? In the residental sector we offer energychecks and sustainable energy solutions like PV, heat pumps, better insolation etc.

Business Partner EnergiMidt would like to reduce the energy expenditure of your company. This can be done in various ways: Identification of energy conservation projects in the company Agreement about financing energy conservation projects in the company Installation related to energy conservation projects Energy management helping to monitor your future energy consumption You can pick among the abovementioned possibilities to fit the needs of your company. Regardless of your focus point, EnergiMidt is ready to be a value adding partner. This means that we ensure both efficiency and financial savings in the different energy conservation projects.

4 steps to lower energy consumption Business Partner is an overall solution ensuring coherence in the process. This guarantees you that the projects are realized. Our goal is to optimize energy consumption and thus minimize expenses. Energy checkEnergy ProjectImplementationFollow-up

1. Energy check Preliminary analysis Catalogue of ideas One of our energy consultants is attached to your company and reviews the company for potential energy conservation projects. Subsequent to this, you receive a catalogue of ideas for efficient consumption of energy. In cooperation with the energy consultant you select which ideas that will be subject for further work in order to obtain an optimal energy position.

2. Energy project Action plans for chosen projects Analyses Measures and calculations Design specification Invite offers from suppliers Action plans for chosen projects are worked out. Our energy consultant reviews the focus areas of the chosen projects in cooperation with employees of the company. Analyses and concrete measures and calculations of energy are carried out. Bases on this, descriptions of energy conditions for the chosen projects are advanced.

3. Implementation Project management Installation Financing Review Final control The projects are realised under the project management of EnergiMidt. We are responsible for all stages of the project completion and we make sure that time schedule and budget are kept. We attend to all parts of the implementation including installation. EnergiMidt also offers financing of energy conservation measures or help to apply for subsidy from European Union.

4. Follow-up Control of energy conservation Energy management Based on the needs of the company EnergiMidt monitors the projects. This can be done by installing control meters, carrying out measures or implementing energy monitoring systems etc. To ensure that the consumption of energy continues to be a focus area in the company, EnergiMidt offers to implement energy management. This gives you a management tool which secures effective consumption of energy and consequently profits.

Customer advantage Optimizing of energyconsumption lower energyconsumption and lower energy expenditure Minimizing the energyexpences – That you can see at your bottom line! Beeing responsible to the enviroment

Case A Danish Company was established in October 2002.The company has 600 employees and develops, produces and sells chewing gum. 1. meeting with the chief of maintenance, mecanical engineer and electrician in may Screening, just the week after the meeting. Catalogue of ideas: a. Optimizing of centralheat- and steamboilers (Boilerplant) b. Natural cooling c. Optimizing of compressed air system.

A. Optimzing of boilerplant The Company has installed 3 steamboilers, with a total effect on 10,2 tons steam pr. hour with 7 bar pressure, and an energyconsumption at about m3 N-gas i Furthermore there is installed 3 central-heatboilers with a total effect on Mcal/h, and a set-punkt at 90 gC, and an energyconsumption at about m3 N-gas i Suggestion: To establish fluegascooling at all the boilers To establish weathercompensation at the part of the central heat system which does not supply the dehumiditysystem in the processventilation To move the endusers, which needs a high flow temperatur in the central heat system to the steam system. Adjusting the central heat system to get a better cooling of the recirculation water To reduce stand by loss in the boiler central Possibly change 1-2 boilers.

A. Optimzing of boilerplant The Energyproject: The Company said GO to investigate the boilerplant. First we investigate the endusers to make them energyeffective before we investigate the boilerplant. Flowmeasuring at the distribution system. Where is the worst enduser when it comes to cool the water? How much flow and the temperature differences? Analyzing possibilities! Calculation / measuring on condensing operation New boilers or existing boilers, which cant bee let cold (turned of) Estimate a new recirculation string to the boilerplant to seperate cold and hot recirculated water.

A. Optimizing the boilerplant

A. Optimzing of boilerplant The result: The Company has chosen to invest in the project Installation of fluegas exchanger on steam boilers, which is cooled with central heat water. Moving consumption from the centralsystem to the steam system, because of 2 processes which needs high flow temperature. Connect the boilers in tandem (Traditionel cascadeconnection), so the operating boilers is 100% loaded before the next boiler gets loaded. Earlier the total boilerplant was warm. Means less heat of radiation. Changing 3 centralheat boilers to new condensing boilers, which also means less heat of radiation.

A. Optimzing the boilerplant Saving potential: Flue gas cooling (condensing operation): m3/N-gas / year Weathercompensation in the central heat system, adjusting and moving endusers m3/ N-gas / year Change boilers m3/ N-gas / year Summary m3 / N-gas / year Value of the saving: Euro/year The total investment: Euro Simply pay back time 2.8 years The project is almost implemented and the savings seems to be even higher. Summer/ fall 2007

C. Optimizing of compressed air system The Company has installed 5 compressor for compressed air, with a total effect on 405 kW, the one cpompressor has broken down and needs to be changed. The application produces compressed air at about 7,5 bar. Operationtime hours/år Suggestion: One of the companys hughes endusers of compressed air is emptying trucks. One truck use approximatily 10 m3 compressed air/min with 0,8 – 1,2 bar, which means that the pressure in the mainsystem is throttled down from 7,5 to 1,2 bar. There also is a demand of very dry air. When they empty the trucks the pressure in the very end of the main system drops to 3 bar, which also is the absolute lowest accepted pressure in the main system. Establish a seperate compressed air system to empty trucks with a pressure of 1 bar. Reduce the pressure in the main system

C. Optimizing the compressed air system

Energy project: Measuring the application Analyzing the controlsystem Analyzing the needs Calculation on heat exchange potential Result: Change the hole application, 2 old compressors will stay for stand by Frequence regulating, which means no stand by loss. Lower the pressure in the main system, Dry air means better operation in the packing department Establishing heat exchange to the central heating system (saves m3 gas)

C. Optimizing the compressed air system Savings: Electricity save new applicaion kWh/year Electricity save lower pressure 0,6 bar kWh/year Heat Savings exchange m3 / N-gas Reduced supply cost Euro/year Summary Euro / år Invesment ,00 Euro Simply pay back time1,7 year Is implemented summer 2006

C. Optimizing the compressed air system

Energyproject Natural cooling The natural cooling project has never started, probably because of the investment and not enough savings. A large ventilation project has started and is implemented. The savings is kWh/year.

Case Grundfos A/S, Denmark Grundfos is one of the largest pumpindustries in the world. They produce more than 16 mio. pumps a year. They produce centrifugal pumps, and sells to more than 50% of the world market for these. Approximately 3500 employees in DK

Ventilation project at Grundfos Bjerringbro We have measured and calculated about 70 aggregates Total energycomsumption at ventilation approximately kWh/year 60 aggreates have a simply pay back time less than 4 years We have only optimated the ventilator and motor The amount of air ventilated is the same before and after the rebuilding.

Aggregate before rebuilding

Aggregate before rebuilding

Ventilation project at Grundfos Bjerringbro Measured effect before saving: 14,7 kW Measured effect after saving: 5,7 kW – new energysaving axial ventilator – meaning no V-belts. As an added bonus there is a considerable reduction of noise using the new plants. Yearly saved energyamount: kWh/ year Or61% Yearly operation time: hours Simply pay-backtime 1,2 år.

Ventilation project at Grundfos Bjerringbro

EnergiMidt A/S Resultats 2006 Industri Disrict heating kWh Natural gas kWh Oil kWh Electricity kWh Others kWh Public sector kWh Private households kWh Summary kWh Target kWh

How to get started: Sighn a contract: It has been agreed that EnergiMidt A/S (EM) shall carry out energy saving consulting work at (the clients) premises located at (place). EM will make an energy screening of the premises and the technical systems and equipment installed with the purpose of identifying potential energy savings. A screening report will be submitted proposing to the client which focus items should be examined in further details. After measuring and analyzing the data from the agreed focus items, a proposal for energy saving projects including costs of investments and simple pay-back time will be submitted to the client. The fee payable to EM for the consulting work will be calculated according to the (model) as described in the enclosed Energy Saving Consulting Fees. The fee is payable weather the client decides to implement the proposals or not.

Energy Saving Consulting Fees. 1) Hourly Rate (Exampel): The counting of working hours starts when an agreement between the customer and EM on energy consulting work has been signed. The hours spent will be invoiced monthly. Terms of payment: 15 days from date of invoice.

Energy Saving Consulting Fees. 2) No-Cure-No-Pay (NCNP) Exampel: EM will perform the consulting work in steps: Screening, selection of focus items, measuring, analyzing data and submission of energy saving report incl. cost of investment and simple pay-back time. The fee is calculated as follows: If no savings with a simple pay-back time on 5 years or less are identified, no fee will be paid. If savings with a simple pay-back time on 5 years or less are identified, the fee is calculated as follows: Pay-back time 1 year or less:Fee is 75% of first years saving Pay-back time between 1 and 2 years:Fee is 50% of first years saving Pay-back time between 2 and 5 years:Fee is 25% of first years saving The fee will be payable in rates: 25% upon submission of screening report with estimated savings. 50% upon submission of energy saving report with calculated savings. 25% upon submission of report with verified savings. This payment will be adjusted according to actual verified savings. Terms of payment: 15 days from date of invoice.

EnergiMidt A/S Gitte Wad Thybo Thank you for your attension Quistions?