Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

1 NRC Status and Plans for License Renewal – A Role for Consensus Standards Allen Hiser, Jr. Robert Gramm Stacie Sakai Division of License Renewal Office.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
1 Revision of ISSAI 30 – Code of Ethics Project proposal to the Steering Committee of the INTOSAI Professional Standards Committee Bahrain, May 2014.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
IEEE Fellow Program April 2008 Saint Julians, Malta Rosann Marosy.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
Status of ANS Standards Presented to NESCC 3/1/2011 Donald J. Spellman Vice Chair, ANS Standards Board.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) Co-Chairs: Dr. Stephanie.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
Repair of Reinforced Concrete of Existing Nuclear Power Plants (RCTG) Chiara Ferraris, NIST Nathan Sauer, SIMCO Technologies.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
November 7, Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards.
The STRONGER State Review Process -Draft Air Quality Guideline ● Martz Summer Conference June 6, 2014 Bruce Baizel Chair, STRONGER Board
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
Alaska Broadband Plan Goals Current Status Next Steps Schedule.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012.
Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants March 28, 2013 Electrical Cable Task Group (ECTG) Lead: Dr.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Electrical Cable Aging and Condition Monitoring Codes and Standards for NPPs Dr. Stephanie Watson Engineering Laboratory NIST 100 Bureau Drive, MS 8615.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 24.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
EBP Committee General Members Meeting Date : 20 th (Wed.) Oct., 2010 EBP Chair: Jannie Oosthuizen (Lilly)
The Egyptian Nuclear & Radiological Regulatory Authority (ENRRA)
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Steve Griffith February 28th, 2017
IEEE NPEC SC2 Equipment Qualification Electromagnetic Compatibility Compliance Type Test-Design Considerations- Installation and Mitigation Standard/Guidance.
Electric Vehicles Safety Global Technical Regulation
Portfolio Committee- Trade and Industry – 11 March 2015
SESSION 3 Policy Framework
REVISED WHITE PAPER ON ARTS, CULTURE AND HERITAGE: PC UPDATE
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
IEEE 383 Standard for Qualifying Electric Cables and Splices for Nuclear Facilities Preview SC-2 May 12, 2014 Robert Konnik.
IEEE SC-2 International Standard Review
Workshop Session 1: Overview
Workshop Session 1: Overview
January 2003 doc.: IEEE /056r0 May 2004
IEEE IMT-Advanced Review Process
UPDATE: Physical Security Guideline
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
AN LOCAL CONTENT VERIFICATION
IEEE IMT-Advanced Review Process
SAE battery safety standards committee UPDATE January 23, 2019
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
Clean Water Act/NPDES Regulatory Updates
PMB Review Update PO’s Forum
Presentation transcript:

Electrical Cable Aging and Condition Monitoring Codes and Standards for Nuclear Power Plants Electrical Cable Task Group (ECTG) NESCC Update: 7 November 2013 Co-Chairs: Dr. Stephanie Watson, NISTDr. Corey McDaniel, R-SCC

ECTG Scope Objectives: Inventory of relevant standards with gaps and overlaps analysis. Recommendations for revisions or new electrical cable standards. Review of current citations of electrical cables codes and standards in NRC regulatory documents. Short, Medium, and Long-term Recommendations

Status and Path Forward July: Added task group co-chair from industry. Draft report submitted to Steering Committee for review and comment. Task group co-chair facilitating review and update of draft report by industry. October: Draft final report to NRC and DOE for final comments November: Publication.

RECOMMENDATIONS Short-Term Actions (<3 year) Revise RG 1.89 Revise RG NRC provide guidance on RG Cable aging studies Research on adequacy of cable characterization techniques Low smoke zero halogen research Medium-Term Actions (3 to 8 years) Revise RG Research on water submergence Research on activation energy Definitions of low and medium voltage Long-Term Actions (> 8 years) Correlation between accelerated exposure and natural aging conditions

EMERGING ISSUES: Korea Background June 2013 – NSSC reveals cable falsifications, 4 reactors shutdown More than 100 officials have been indicted to date; KHNP CEO, Minister Reactor head cables removed and replaced using domestic supplier Cable in two new reactors was re-tested – APR-1400 (UAE ref. plants) Testing conducted in October – cables failed flame tests, must be removed KHNP issues ITB two days later; 20 KHNP executives dismissed 2 U.S. companies are the only invited bidders (domestic not allowed) Bids accepted last Friday (1 November); award expected 2-3 weeks Implications Korea used IEEE to re-test cables; are re-test procedures needed? Will cables at other reactors be re-tested as a result of Korea? Will re-testing expand beyond Korea? Research implications of re-testing, beyond condition monitoring?

Gaps in Research and Standards 1.Cable Aging Studies a.Accelerated aging and extrapolation to 60 years i.Thermal and radiation sequence ii.Diffusion limited oxidation 2.Water Submergence and its Effects a.Medium versus low voltage 3.Activation Energy Determination 4.Adequacy of Cable Characterization Techniques a.Destructive versus non-destructive b.Line Resonance Analysis (LIRA) i.Low voltage cable applications; SDOs need to develop a method ii.Currently used in NPPs (I&C, power), T&D, Wind Parks (on/offshore), Process Industry, Oil and Gas Industry (above ground, underground, submarine, umbilical cables), Cable Manufacturers (reference measurements, QC) c.Joint Time and Frequency Domain Reflectometry d.Cable field tests for non-shielded cables (5 kV and above) 5.Universal procedure for walk-downs of cable installations Existing NPPs

Gaps in Research and Standards 1.Qualification testing on low smoke zero halogen cables 2.Performance correlation between fast non-oxidative diffusion limited oxidation controlled exposure (IEEE 323) with oxidatively driven materials degradation for long term plant normal operation (low dose radiation and low temperature) 3.Commonly accepted definitions of low and medium (action for SDOs) New NPPs