RPC Detector Control System

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Detector Control System
PVSS an industrial tool for slow control
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DAQ for ATLAS SCT macro-assembly
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
RPC Barrel HV & LV system Lappeenranta University
Jan Królikowski Warsaw University
Electronics for RPC Upscope
Cosmic Ray Tracker and Detector Control System at the GIF++
HV & LV status LV system in W+1 and W+2 is OK
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
The Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci - I.N.F.N. Naples
The LHCb Run Control System
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
DQM for the RPC subdetector
RPC HV-LV project Introduction RPC description Requirements
RPC Detector Control System
HV & LV status LV system in W+1 and W+2 is OK
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
Presentation transcript:

RPC Detector Control System Pierluigi Paolucci - I.N.F.N. of Naples

CMS Experiment Control I.N.F.N. Naples Run Controls (RCS): Configure and operate all local/global data taking sessions, Monitor and protect the measurements and the data flow Based on the CMS online software framework (XDAQ – RCS) ad commercial products (DBs, SOAP, XML.....) Detector Controls (DCS): Setup and monitor the detectors and the environment Monitor and protect the apparatus equipment Based on industry standards (PLC, field buses, PVSS and JCOP tools)

Pigi Paolucci, I.N.F.N. of Naples CERN JCOP project I.N.F.N. Naples The CERN JCOP project has been designed to extend the PVSS II software package to the high energy physics experiment requirements. Channel DB Manager  to define your hardware and software variables, define alarm, connect to hardware.. Panel Editor  to create/modify your panels Alarm Handling  to generate/monitor alarms Electronic Logbook  operation logbook (JCOP) Archiving  to archive your data (JCOP) State Machine (SMI)  JCOP tool 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples Run Control & DCS I.N.F.N. Naples Central DCS Central RCS Interfaces already existing SOAP: RCS – DCS : commands and status ownership XDAQ – PVSS: data exchange DCS services Sub-Detector Controller Local DCS node Local XDAQ nodes Plans to install and test RCS-DCS demonstrator in PC farm at CERN in 2004 Electronics Setup, etc. Local DCS tree for HV, LV, P, T, etc. 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples DCS demostrator I.N.F.N. Naples Global State Central Control Panel SubDetector States Services States SubDetector Control Panel Detector Subsystems 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

DCS and Online Data Bases I.N.F.N. Naples DCS environmental data is stored in PVSS Archive or in external Oracle DB (not yet available in PVSS) DCS configuration data can be stored/ retrieved from DCS Oracle DB: Test new Framework interface to Configuration DB Build interface between Framework and CMS Equipment Management DB: Already done for Rack Control Application - CMS General hardware configuration (HV, etc.) – JCOP Delivery Integration issues with RMCS, XDAQ, DCS, Sub-detector DBs 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples RPC DCS sub-systems I.N.F.N. Naples HV system  480 + 378 ch. = 80+70 boards LV system  720 + 800 ch. = 60+70 boards Temperature  300 + ? ch. = 10 + ? boards Front End  4680 + 2544 FEBs Gas Cooling Rack, crate Ventilation CERN project Barrel & Endcap 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

RPC DCS overview The RPC Detector Control System schema HV LV temp FEB I.N.F.N. Naples The RPC Detector Control System schema RPC Barrel DCS HV LV temp FEB Gas Cooling From other DCS node 12 crates 80 boards 480 ch. 20 crates 60 boards 720 ch. 300 sensors 10 ADC About 5000 FEBs 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples DCS status overview I I.N.F.N. Naples HV - 480 channels (80 boards) placed in the 16 crates; Tender is started in December 03 and is finished on May 04 Easy Prototype in July 04; Prototype Test in Naples/ISR from Sept 04; 20% of the system in Dec 04; Board test at CERN from Jan 05; Full system in Sept 05; Installation and commissioning 06. LV - 720 channels (60 boards) placed in the 20 crates; CMS found a common solution; A3009 board with 12 ch., 2-8, V - 9A, 45 W, 5 boards/crate Tender at CERN 04; Full system available in Dec 05; 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples DCS status overview II I.N.F.N. Naples Temperature - 300 probes  readout 10 ADC boards; 100 probes installed (on the chambers); 250 probes ready at the assembling sites; An ADC/DAC board with 128 ch. is under design for ATLAS & CMS by the CAEN company; The board will be integrate in the EASY crate; Prototype and test in the 2004; Full production in the 2005. Front-end - 4680 Front End Boards 800 Link boards in 60 crates Control/monitor width, threshold and temperature monitor the RPC/FEB performances (occupancy, rate, noise….) Racks and crates, gas, cooling and ventilation: will be developed using a common solution/tools for the CMS sub-detectors. 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples DCS connection Schema I.N.F.N. Naples Control Room SY1527 20 Bus lines 12 Bus lines HV distrib HV EASY LV + Temp LB crate Detector LV + Temp LB crate 300 Optical fibers @ 1.6 Gbit/s LV + Temp LB crate LV + Temp LB crate 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Temperature sensor I.N.F.N. Naples Our goal is to measure the iron gap temperature with a precision of 1oC in order to: compensate the HV working point in case of a large gradient of the temperature e/o atmospheric pressure; study the RPC aging and the current/noise behaviors taking into account this crucial parameter; Switch off the chamber/sector/wheel in case of “high” temperature. We have decided to use the Analog Device AD592BN transducer, after having tested different sensors. AD592 temperature transducer High Pre-calibrated Accuracy: 0.5oC max @ +25oC Excellent Linearity: 0.158C max (0oC to +70oC) Wide Operating Temperature Range: –25oC to +105oC Single Supply Operation: +4 V to +30 V Excellent Repeatability and Stability High Level Output: 1 mA/K Two Terminal Monolithic IC: Temperature In/Current Out Minimal Self-Heating Errors 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples Front End Board I I.N.F.N. Naples The front end electronic boards communicate with the Link Board through the I2C bus; Each Slave LB receives data from up to 6 FEBs  96 strips; Each Master LB is connected to, not more, than 2 SLB; MLB transmits data to the control room via optical fiber; Each LB crate house up to 8 LBs and has 1 Control Board (CCU); The RPC continuous monitoring (noise rate, occupancy…) will have a refresh rate of about 30 sec; For each strip the events before and after windowing are counted during a defined period of time. That allows plotting of rates and efficiency; There are two 32-bit counters for each group of 128 channels/strips; The amount of data to be sent is 2*32*128 = 8 Kb/10s/LB/plot. 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Front End Board II I.N.F.N. Naples Additionally for the orbit synchronization there are ca. 4000 32-bit counters (1 for each bunch crossing) producing ca. 128 Kb of data / plot. But these probably can be read less often. The theoretical throughput of a CCU chain (up to 27 CBs) is 4 MB/s. The theoretical throughput of a LB box is 4 MB/s / 27 = 152 KB/s. The theoretical throughput of a Link Board is 152 KB/s / 8 = 19 KB/s. Required throughput for a continuous monitoring of one RPC is: 128 strips * 2 counters * 32 bits = 8 Kb/10s = 100 Bytes/s. The I2C communication does not contribute significantly to the total CCU load. The total bandwidth depends on the number of CB's in single CCU chain (serviced by a single FEC). 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

First examples Clusters Size Distribution 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples DCS Cost estimation I.N.F.N. Naples Temperature: T Sensors  300 * 4 €  1.2 K€; Chamber cable  0.6 Km * 0.5 €/m  0.3 K €; ADC cable  8 Km * 0.5 €/m  4.0 K €; ADC cable inst  8 Km * 3 €/m  24 K€; Cham Connect.  300 * 0.4 €  0.12 K €; ADC Connect.  600 * 0.4 €  0.24 K €; ADC boards  10 * 2000 €  20 K€; FEB – I2C: I2C cable  6 Km * 5 €/m  30 K€; I2C connector  780 * 2 * 0.4€  0.7 K€; I2C cable inst.  6 Km * 3 €/m  18 K€; ~ 50 K € ~ 49 K € Total of ~ 110 K€ (10 KE for infrastructure) 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples Conclusions I.N.F.N. Naples The HV tender is finished; a prototype will be ready in July 04. The production will finish in September 05. The CMS LV project is almost ready. The tender will start in a couple of months. The CAEN has a LV board designed for RPC. 100 out of 300 temperature sensors (AD592BN) have been installed on the chambers and tested at the ISR. The Link Board project is going on. Next steps during the 3 test beams (June-Endcap/July-Bari/October-Barrel). The histograms and snapshots work well and have proved their usefulness in testing the performance of chambers. A full time student from Naples is working on the RPC DCS and we will have a first complete prototype (HV-LV-Temp) at the end of the 2004. There is an extra cost of about 50 KEuro due to the cost of the cable installation. 06/04/2019 Pigi Paolucci, I.N.F.N. of Naples