L&V Manpower Development Prepared by: HR department Mar, 2013

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

Meeting & Exceeding Customer Expectations 2130 South Industrial Park Avenue Tempe, AZ (480) Fax (480)
The Technological World. The Design Process In order to design a product, an engineer must accomplish 3 steps: Design Blueprints, review sketches etc…
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
2 Careers in Machining Technology Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives List the.
There is a difference.... Future Business, Why VEKA?
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Quality Management Training Quality circles Bench Mark Kaizen.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Corporate Director Head of Planning and Transport Development Control Building Control Strategic Planning Transport Policy and Programmes Traffic and Parking.
Optics Career Path Works with engineers to produce optics, and assists with research and development Associate Degree Pay Range: $14-$20/hr Generates designs,
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Quality Management System
Quality Assurance/Quality Control Policy
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
UNIT 3.04 Career Opportunities By PresenterMedia.comPresenterMedia.com.
Manufacturing Engineering Department Lecture 1 - Introduction
Quality at your service. Key Figures Established December 5th, Subsidiaries in France, and 1 in China Turnover 2.5 M.€ in people at your.
This year 315 students are learning automobile mechanics and automobile electrician specialties in Transport department. Student’s qualification - automobile.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
POSITIONVACANCIESREQUIREMENTS Project Engineer1 Must possess at least Degree in engineering or equivalent. Good interpersonal and communication skills,
The Maintenance and Engineering Organization
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Organization of the Hotel
Product Design Specifies materials Determines dimensions & tolerances Defines appearance Sets performance standards.
Trial & Prove The RouteMilestones 1-4 SM ‘Buy-in’ W/S 4 Day Launch Workshop/ Initial Training POLICY DEVELOPMENT & DEPLOYMENT Pilot Projects, Plant Clear.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
Substation Maintenance
Equipment Planning and Project Consulting Technology Management.
1 MEMB113: ENGINEERING GRAPHICS & CAE 13 ASSEMBLY AND DETAIL DRAWING.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Manufacturing Solutions- Knitting TexManage. Knitting Functional Flow Receipt of Orders Generation of Internal Order Yarn Requirement Allocation of Machinery.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
ENGINEERING SUPPORT FOR FINAL YEAR PROJECT STUDENTS. SCHOOL OF ENGINEERING.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
“ Technical Skills for Non – Engineers” COE Technical Education and Skill Development Program (Phase I)
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
INTERNAL JOB BULLETIN JOB TITLE : Warehouseman (Wells Operator)
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Central Colorado Advanced Manufacturing Hot Jobs thru 2024
Mechanical Engineering Facilities Engineering
Korean College Student Internship Program (3rd)
Careers in Manufacturing
Colorado Advanced Manufacturing Hot Jobs thru 2024
Korean College Student Internship Program
Preparations for a Formula One Race C Whiting
Instrument Maintenance
INTRODUCTION (Manufacturing Planning)
Budgeting and fund raising
Application Engineering Role
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Career Cluster Manufacturing.
First Article Inspection
English for Technician
Summer Training Department of Industrial Engineering
1.03 Career Options.
Specifications What should it cover Goods Services Warranty
Mechanical engineering technician
Eltronic A/S Engineers 50 Engineers
BUDGET: M (ETS, ADMIN, BOS, TOB)
Mechanical Drafting Unit 1
Presentation transcript:

L&V Manpower Development Prepared by: HR department Mar, 2013

Manpower internal development roadmap Comprehensive development Start at manufacturing department, internal oriented to the dept related to engineering - R&D dept, Engineering dept, QA dept, Mfg dept, Purchasing dept or even Marketing/project dept. Targeted Development R&D field Mechanical & Electrical field Dig deeply, learn know-how Win-win! Internal promotion

Comprehensive development roadmap Note: For “Line Leader” work, need to follow the working schedule of production line. Technical Supporting Team at Mfg dept (3~ 6 months): Overall product category, support to handle quality issue at production line, etc,. Line Leader (12~ 36 months): On-site manage production line: processing, quality, engineering, manpower, etc,. Technical department training (2~ 3 months): Learn know-how of the working post – processing, method, tooling, etc,. Working independently (…….): On-site position working then internal promotion: Technician → Assistant Engineer → Engineer → Senior Engineer → Supervisor → Senior Supervisor → ……

JD: Line Leader Maintenance production processing: manpower, machine, material, method, environment. Manufacturing data collection and analysis. Emergency processing manufacturing issues. Support to Technical Supporting Engineer on product quality issue analysis and carry out countermeasures. 6S management and improvement of production line.

Targeted Development - R&D field Note: For “Laboratory Technician” work, need to follow the working schedule of Lab. Laboratory Technician (12 ~ 24 months): Prototype making, component/product testing, product validation, etc,. Technician (6 ~ 12 months): Supporting to Engineering on drawing, sample making, validation, etc,. Assistant Engineer (12~ 24 months): Work independently, support to Engineer on technical/quality issues, etc,. Engineer (…….): Responsible for project independently. Internal promotion: Engineering → Senior Engineering → Supervisor → Senior Supervisor → ……

JD: Laboratory Technician Check all necessary elements of prototype: drawing, CP, DFMEA, fixture, material, etc,. Follow the processing to prototype, responsible for the quality and technical issues. Technical support on prototype making. Supporting to DV trial run at production line. Supporting to dimension inspection, endurance test etc,. 6S management and improvement of prototype workshop.

Targeted Development - Mechanical & Electrical field Note: For “Mechanic” work, need to follow the working schedule of production line. Mechanic (12 ~ 24 months): On-line machine repair, maintenance, etc,. Technician (6 ~ 12 months): Supporting to Engineering on equipment capability improvement, maintenance etc,. Assistant Engineer (12~ 24 months): Work independently, support to Engineer on technical/quality issues, etc,. Engineer (…….): Responsible for project independently. Internal promotion: Engineering → Senior Engineering → Supervisor → Senior Supervisor → ……

JD: Mechanic Machine maintenance, repair. Train the on-site operator to use the equipment correctly. On-line fixture validation, maintenance. Change over processing fixture at right time. Electro circuit, gas circuit assembly and maintenance. Support to Machine Engineer on equipment validation, set up equipment manual, equipment improvement.

Thank you !