Installation Binder / IRR – an example

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Pipe Supports and Hangers
EQUIPMENT VALIDATION.
HACCP Manager Software™
Project Phases of an EPIC Contract Pre Project Basic EngDetailed Eng Procurement Long Lead Items MC Prep Installation PC Execute PC and Commissioning Preparation.
MC and Commissioning Preparation
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Visit us at E mail: Tele: www.globalmanagergroup.com.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
“Incident Free Starts With ME”
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Interpreting and Using Engineering Information. Overview This unit aims to give learners the knowledge and skills needed to use engineering information.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Application – Identifying, Listing Equipment, and Documentation
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Safety Management System
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Site Organization and services for machine installation/commissioning Peter Rådahl June 2016.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Steve Griffith February 28th, 2017
Crab Cavity Technical Coordination meeting:
Installation Procurement Package
Some arrangements for personnel safety 1- Procedures for access
Cryomodule test stand at ESS site
Installation Global System
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Technical Scope of Work
EET 422 EMC & COMPLIANCE ENGINEERING
Third Party Activities for FH1 Project
Quality Management Systems – Requirements
System Lock Out/Tag Out and Line Breaking GSS24
Technical Scope of Work
General Contract Management Structure
Mikael Jakobsson ESS Installation Manager
Helen Boyer OHS group leader
SPOKE Cavities frequency preparation plan and RF control procedures
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Piping and Instrumentation for Process Industries
Quality Regulation for Mechanical Equipment RESSQ – Mech
SAFETY STANDARDS FINAL JEOPARDY
Infrastructure Project and Component Installation Accelerator Project
Workshop commissioning Installation Coordination at ESS
Installation Site Organization Target Division
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
Receiving Inspection on incoming goods
Presenter name Presenters title
PSS verification and validation
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Radiation Protection Handbook
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
INSTALLATION & COMMISSIONING TAC 14
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
TSS Management: Procurement & Installation Planning
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Acc Collaboration board Trieste
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Installation Binder / IRR – an example Felix Schlander Lead Engineer European Spallation Source ERIC Date

Example Install cryomodule on supports IMPORTANT: Only mechanical transfer of module Not a single connection (RF, instr., …) … the other ’installations/connections’ are handled in other binders! (not in direct scope of ESS SRF)

Design information I need Input from Design Preparation of Installation Binder Check by: Discipline Lead Engineer QC Engineer IRR

6 DRAWINGS Only related to the immediate installation to be performed! Equipment Layout Piping Layouts Isometric drawings Mechanical drawings Cable layout Electrical drawings / diagrams P&ID Etc.

11 QC – Installation & Test Documentation Inspection plans Mechanical installations Electrical installations Pressure Test Programs Protocols Welding protocol X-ray Protocol UT protocol Pressure test report PT protocol Material certificates Couplings installation protocol Anchor installation protocol Bending of pipe protocol Visual inspection protocol Marking Identification Corrosion protection Installation Certificate of compliance The plates will bend max 0.25mm when loaded …

12 – List of components and material List of Materials List of Objects List of Supports List of Name Plates Equipment list Valve list Motor list Instrument list Cable list Line-list Pipe Spec Pipe insulation Penetration list, fire, ventilation, radiation Etc. 1 cryomodule 1 set of support stands ESS-00XXXXX Tungalyft cart + toolings tools X Mxy bolts + nuts + washers …

13 Reference material Sketches Manuals Data sheets Supporting/reference documents, needed during installation

Summary Documentation required for the instalation binders from IPNO/CEA is – depending on task – not too much Be aware: the example given mainly is ’only’ nuts & bolts plus some handling procedure For other installations (cryogenic connection welding etc.) there may be more information needed from IPNO/CEA, will be requested either through ESS SRF Section or directly

Installation Binder 00. List of Documents Table of content including document revision Issuer: Installation Package Leader Reviewer: Discipline Lead Engineer (WUL / WPM) + QC Approver: Installation / Area Coordinator Link to General site information and templates

Installation Binder 01. Scope of work Description of work in general terms Interfaces Boundaries and Extent of activities to be performed (E.g. test/commissioning activities to be included.) Responsibility matrix

Installation Binder ESS Site Organization Project Site Organisation 02. Organisation / List of Contacts ESS Site Organization Project Site Organisation In-kind / Contractor Site Organisation Telephone / mail list to all site personnel

Installation Binder 03. Time Schedule Installation Time Schedule for the work described in this binder

04. RAMS Risk Assessment Method Statement Installation Binder 04. RAMS Risk Assessment Method Statement Installation sequence Transportation route interference check Job Hazard Analysis Equipment & resources Etc.

05. Temporary Service Installation Binder Scaffolding Laydown Areas (Storage) Site logistics Lifting Temporary power and fluids List of concrete boring and drilling Etc.

Installation Binder 06. Drawings Only installation drawings! Equipment Layout Piping Layouts Isometric drawings Mechanical drawings Cable layout Electrical drawings / diagrams P&ID Etc. Drawings used for prefab. etc. are placed in: 13. Reference documents

Installation Binder 07. Installation Procedures Welding Procedure Specification Electrical procedures Cold bending Anchor bolt installation procedure Coupling installation procedure Etc.

08. Work Permits Installation Binder Certificates Permits Hot work Fork lift Crane Etc. Permits Electrical work Lock out tag out Ladder

Installation Binder 09. Daily diary Meeting notes from e.g. Pre Job Briefing. Notes of importance / Main activities during the day. Is also used for reporting to management or as turn-over notes to other shifts.

Installation Binder 10. NCR Non Conformity Report Non conformity reports Follow up list

Installation Binder 11. QC - Installation & Test Documentation Inspection plans Mechanical installations Electrical installations Pressure Test Programs Protocols Welding protocol X-ray Protocol UT protocol Pressure test report PT protocol Material certificates Couplings installation protocol Anchor installation protocol Bending of pipe protocol Visual inspection protocol Marking Identification Corrosion protection Installation Certificate of compliance

12. List of Components & Material Installation Binder 12. List of Components & Material List of Materials List of Objects List of Supports List of Name Plates Equipment list Valve list Motor list Instrument list Cable list Line-list Pipe Spec Pipe insulation Penetration list, fire, ventilation, radiation Etc.

Installation Binder 13. Reference Documents Sketches Manuals Data sheets Supporting/reference documents, needed during installation

Installation Binder 14. TRR- Test Readiness Review Demonstrate and handover finalized installation to Commissioning Verification / Validation plans state what’s needed! (Functional test, System test, Integrated system test) Output: Quality documentation Installation Certificate of compliance List of outstanding activities and NCRs As built doc:s or Red lined drawings Signed Test Readiness Review