Recent Bond Accomplishments. Bordeaux Elementary Remodel.

Slides:



Advertisements
Similar presentations
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Advertisements

TUSD Facilities Update November 8, Deferred Maintenance.
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
EDUCATION FIRST FACILITIES COMMITTEE. THE FACILITY COMMITTEE WAS CREATED IN NOVEMBER 2012 TO COMPLETE A THOROUGH STUDY OF DISTRICT FACILITIES. MEMBERS.
1 Zero Tax Increase Referendum: Community Information Session.
Addressing Highest Priority Facility Needs
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Cost Total cost is up to $8,645,000 $500,000 from Capital Reserve Fund $8.145 million bond for the balance.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Blissfield Community Schools Strategic Plan Facilities Team.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Coloma Community Schools Community Forum #2 October 25, 2011.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Glenvar High School Renovations School Board Presentation
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Construction Report August 18, Projects Site Improvements Track replacement and turf Generators.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
South Greenville Recreation Center and Park Master Plan.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Munday CISD Areas Targeted for Improvement. Currently Day Care, Elementary Music and Reading Classes in 3 separate portable, temporary buildings New addition.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Oconee County Schools Five Year Facility Study April 27, 2011.
Facilities Focus Group
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Addition of Fire Alarm system. None existing.
Cornwall Central School District
Capital Improvements Presentation
Raytown Quality Schools Bond Project Update
Dr. Joseph Meloche Superintendent of Schools Mrs
WOU Budget Committee February,
2018 Bond Review and Proposal
CV Futures Task Force Report May 8, 2017
Building & Property Committee
Charter Oak Unified School District
Capital Outlay Workshop
Facility Advisory Committee Meeting
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Master Facilities Committee Evaluation and Identification
Draft Bond Work Plan A Presentation to the
Dixon Middle School Project Update
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Recent Bond Accomplishments

Bordeaux Elementary Remodel

New Evergreen Elementary

New Olympic Middle School

Upgrades to CHOICE School

New 40-year roof New windows New carpet in office and classrooms Hallways and office re-lamped with T-8 technology New ADA compliant restrooms New ADA compliant rear entry with elevator and foyer

Upgrades to Shelton High School

Some new HVAC units New seating, lights and sound in auditorium New 40-year roof on stadium New, more effective and efficient lighting in gym New, quieter and more efficient HVAC system in gym

Upgrades to Shelton HS (cont) New, hardwood gym floor New, more efficient gas boilers for heating swimming pool New, more effective ventilation system for swimming pool New swimming pool back wall and roof New deduct water meter Installation of full natural gas capacity

Upgrades at Mt. View Elementary

Parking and traffic improvements: - safer, more efficient traffic flow - new student drop off area - additional parking Site improvements: - improved field drainage - retention pond - better storm water management

Upgrades at Mt. View (cont) Safety improvements: - improved fire loop - additional fire hydrant - new breezeway and playshed Interior and exterior paint

Other Bond Accomplishments: Purchased Administrative Services Building Purchased Maintenance Facility Demolished Angle Education Center Purchased portables at all 3 elementary schools

Current Facility Needs

Mt. View Elementary Complete modernization of school: -New heating and ventilating system -Upgraded restrooms -Improve kitchen facilities -Increase natural light / add windows -New interior finishes -Upgraded exterior finishes

Mt. View Elementary (cont) Additional space to connect library building to main building Relocate administration office to west end by new parking lot - New main entry to building Complete modernization of annex

Mt. View Elementary (cont)

Shelton High School Replace buildings 300, 400, 500, 600 and 700 with 57,000 sq. ft. of new building Demolish buildings 300, 400, 500, 600 and 700 The new building would connect remaining buildings 100, 200, 1100 and 1200 to make a single school structure Buildings 100, 200, 1100 and 1200 would be modernized

Shelton High School (cont) The single structure would enhance student safety and staff supervision The new structure would be built completely outside the airport no-fly zone Gym building and shop building would be completely modernized Increase parking facilities Provide for future school expansion

Shelton High School (cont)

Shelton High School Athletic Needs Build new visitor bleachers 1,200 seats covered seating press box Build visitor ticket booth / concession stands / restrooms Remodel restrooms and concessions below existing grandstands and add new area for locker rooms and offices

Shelton HS Athletic Needs (cont) Provide new artificial turf football / soccer field Replace existing track surface

CHOICE School Provide new heating / ventilating system Improve electrical system Replace P.A. system Improve water piping Remodel kitchen and add area to increase size New kitchen equipment

CHOICE School (cont) Improve lighting and sound system in auditorium Provide operable wall at stage to create additional teaching space Provide science lab classroom Provide manufacture classroom

Transportation Facility Remodel existing garage and 4 service bays Increase bus parking area Remodel existing office space Add on to office space to provide Larger staff meeting room More restroom fixtures Improved office layout

Administrative Services Building Improve heating / ventilating system

Maintenance Facility Demolish existing unused outer buildings Build a 3,000 sq. ft. addition to existing metal building Remodel existing metal building, shop and office areas Create a lobby / entrance area with elevator to second floor

Maintenance Facility (cont) Improve parking Improve site security Lighting Fencing Electronic locks

RECOMMENDATIONS

Mountain View Elementary Modernization & Addition Shelton High School New-in-Lieu & Modernization Shelton High School Athletic Needs CHOICE School Remodel Technology Upgrades Administrative Services Building Upgrades New Elementary School #4 Maintenance Building Transportation Facility