Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison.

Slides:



Advertisements
Similar presentations
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
CMS Transition Overview 22 nd July Key Attributes CMS Consequential Change Project is scoping high level change requirements as a result of Project.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
Shipperless & Unregistered Workgroup Friday 15 th March 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Modification 0232 Presentation for Total By Gareth Evans.
Industry Dialogue on xoserve Services 14 th September 2007.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Functional Change through RGMA Review Ph2
Code Governance Review UNC Modification Proposals
Introduction of Code Contingency Guidelines Document
PN UNC Workgroup Invoicing 4th October 2011.
UNC Trader User – Licence obligations
Revised registration for unregistered sites
Modification Proposal 0192 – Draft Business Rules.
Smart Metering Consequential Changes
PN UNC Workgroup iGT Services
Joint MIS Development Group (JMDG) update
Project Nexus Workgroup
Project Nexus Workgroup
Chris Warner Network Code Manager
The Necessary Criteria for a UNC Modification Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Joint Office Presentation for Modification 0678
DSC ChMC CSS update 13th February 2019
Distribution Workgroup 8 August 2012 Joanna Ferguson
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Project Nexus Workgroup
Introduction of Code Contingency Guidelines Document
Proposer: Transporter /
Proposed Changes to UNC Section O
Richard Fairholme Transmission Workstream 4th September 2008
Performance Assurance – Consideration of Discussions to date
Consideration of issues raised by UNC Modification Proposal 0244
Modification 0448 – European Driven Change Process Flow Diagram
UK Link Replacement Programme additional supporting UNC modifications
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
Deferral of Retrospective Updates Functionality
UK Link Manual Update (UNC Modification 0613)
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Release 2 Baselined Customer Training Requirements
Implementation Approach Distribution Workgroup – June 2014
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Project Nexus Workgroup
Joint Office UNC Elections
Joint Office UNC Elections
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
DSC Change Committee Update
Joint Office UNC Elections
Presentation transcript:

Modification 0468 – Unique Property Reference Number by Gas Transporters David Addison

Understanding of Scope Standard Industry Flows Address Base No amendments to existing User to Transporter flows Transporter X X Shipper Address Base Data Updates informs Transporter Address Data Or other industry flows X Where updated, Address data passed X Supplier UPRN not passed MAM MRA

Understanding of Scope UNC Modification 430 / SPAA Changes S98 – UPRN “This field will not be populated until governance is agreed” RGMA Dataset Understanding is that scope of Modification 468 will not populate this field

Modification Timings Detailed business rules Cost/benefits analysis Implementation Date – not defined Report back to Panel – August 2014 Ofgem decision to follow UKLP High Level Design Reaching conclusion Insufficient detail understood at this time

Any Questions?