1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.

Slides:



Advertisements
Similar presentations
ALGEBRA Number Walls
Advertisements

RECORD KEEPING Cooperative Development of Operational
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
DELAWARE COMPREHENSIVE ASSESSMENT SYSTEM Presented to District Test Coordinators February 17, 2010.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
0 - 0.
Modern Systems Analyst and as a Project Manager
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
East Hampton High School July 2013 – July 2014 Design Phases.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
NOTICE SUBMISSIONS Requirements and Procedures 1.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Transition to Operations Erik D. Johnson, Deputy ALD for Programs Science Advisory Committee April 4, 2011.
Let’s watch a DVD… DVD Instructor Notes
1. 2 Earthquake effects on health care facilities 2.
Presented By: Dean Soultanian Director of Proposal Development & Principal in Charge of PCB Remediation Activities March 30, 2011 Managing PCB Contaminated.
Preparation Process and Exercise Manual
VOORBLAD.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
There are three types of emergencies:  Internal  External  Natural disasters.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Internal Control and Control Risk
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Environment, Safety and Health
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Controlling Project Cost and Schedule
CF Scope, Management & Organization
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional Facilities Advisory Committee Review October 5-6, 2010

2 BROOKHAVEN SCIENCE ASSOCIATES Agenda Beneficial Occupancy Readiness Evaluation process Pre-BORE Walk Downs BORE Team Scope Schedule Details of Phases 1 & 2 Summary

3 BROOKHAVEN SCIENCE ASSOCIATES Beneficial Occupancy Readiness Evaluation Successful BORE(s) are required to allow safe access for project staff and installation of technical equipment General scope is to review conventional construction with a focus on the systems/components, worker qualification and emergency response necessary to ensure personnel safety in support of equipment installation BORE(s) are scheduled in phases that follow logical construction completion sequences First BORE Phase1 – February 2011 and continuing every month or two for a total of 16 BORE Phases (if all LOBs built out).

4 BROOKHAVEN SCIENCE ASSOCIATES Specific NSLS-II BORE Plan Developed with Lab ESH Directorate input Assigns responsibilities (NSLS-II, Lab and Contractor) Defines Scope Pre- BORE walk downs start ~ 3 months prior (November 2010) Pre & Post Occupancy identified issues are tracked in family ATS Defines deliverables – T&Q, run cards, interim procedures, official transfer of identified utility equipment to F&O, etc. Beneficial Occupancy Readiness Evaluation BOREs will follow the Laboratory SBMS Subject Area Readiness Evaluations

5 BROOKHAVEN SCIENCE ASSOCIATES PRE-BORE A series of Pre-BORE walk downs of the facilities will begin in November. Intent is to familiarize team members with the assets that will comprise the subject of the BORE Identify any issues that may impact the success or schedule of the BORE Issues tracked to closure Walk down will include core BORE team and interested observers Process was successful with the CFN project

6 BROOKHAVEN SCIENCE ASSOCIATES BORE Team The Laboratory BORE Team Includes: NSLS-II BORE Project Leader – B. Heneveld SHSD Review Coordinator – R. Travis NSLS-II Project Team Coordinator – S. Sawch Laboratory BORE Committee (Typical): Fire Protection Engineering – M. Kretschmann Environmental Protection – J. Remien Safety and Health – C. Weilandics Environmental Compliance – D. Bauer Facility Support – F. Zafonte Facility Operations – S. Thompson Electrical Safety Engineer – R. Biscardi Typical BOREs have up to a dozen observers from various disciplines

7 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II BORE Scope Substantially Complete All building structures – walls, floors, ceilings, roofs etc. Life safety systems – sprinklers, alarms, emergency lights etc. Egress systems – exit doors, stairs Communication systems necessary for life safety Utilities complete – electric, water, sewer, HVAC, air, chilled water, steam etc. Surface treatments complete – paint, carpet, tile etc Response training – fire rescue, security Only punch-list items remain open or items dependent on future system installation – may require negotiation with BORE Committee Examples may include items such as HVAC system balancing or De-Ionized water supply to equipment that has no Life Safety implications

8 BROOKHAVEN SCIENCE ASSOCIATES BORE Schedule PHASEDESCRIPTIONBORE DATE 1Ring Building Pentant 12/1/11 1ACooling Tower, Utility Tunnel,Vehicle Tunnel2/1/11 2RF Building3/23/11 3Injection Building5/18/11 4Ring Building Pentant 26/2/11 5Ring Building Pentant 39/27/11 6Ring Building Pentant 411/28/11 7Ring Building Pentant 52/9/12 8LOB 2 Shell & related site work (Base Bid) 5/1/12 9LOB 1 Fully Fitted Out & Related site work (Base Bid) 6/1/12 10LOB 3 Fully Fitted Out and related site work (Base Bid) 6/29/12 11LOB 4 Shell and Related Site Work (Option 1) TBD 12Full Interior Fit-out of LOB 2 (Option 4) TBD 13LOB 5 Shell and Related Site Work (Option 2) TBD 14Full Interior Fit-out of LOB 4 (Option 3) TBD 15Full Interior Fit-out of LOB 5 (Option 5) TBD

9 BROOKHAVEN SCIENCE ASSOCIATES BORE Phasing LOB 1 Phase 9 LOB 2 Shell Phase 8; full fit out Phase 12 LOB 3 Phase 10LOB 4 Shell Phase 11; Full fit out Phase 14 LOB 5 Shell Phase 13; full fit out Phase 15 Phase 2 Phase 3 Phase 1 Phase 1A Phase 5 Phase 4 Phase 1A Phase 7 Phase 6

10 BROOKHAVEN SCIENCE ASSOCIATES Phase 1 – Pendant 1 Lobby Area From Mezzanine Experiment Floor From Lobby Looking East

11 BROOKHAVEN SCIENCE ASSOCIATES Phase 1A -Cooling Tower ExteriorInterior

12 BROOKHAVEN SCIENCE ASSOCIATES Phase 1A – Utility Tunnel West EntranceInterior

13 BROOKHAVEN SCIENCE ASSOCIATES Phase 1A - Vehicle Tunnel View EastView West

14 BROOKHAVEN SCIENCE ASSOCIATES Summary BORE Process is well defined Specific NSLS-II BORE Plan in place Resources assigned to support BOREs are in place Conventional construction is on schedule to start BOREs as planned