MOM Report October 9- Now Linda R. Coney UCR. October 15 th Running Target Target Beamline Magnets Beamline Magnets Detectors? Detectors? Could not turn.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MOM Report. Shield Wall – Gone Before During After 2.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
MOM Report Galina Vankova RAL, MICE Video Conference.
MOM report – part I Roumen Tsenov as MOM ( )
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOM Report Victoria Blackmore VC /06/11 1/7.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference May 7, 2009.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE Operations Scenario Run 1
MICE PM Report Progress with the Infrastructure A few problems
Run Coordinator Report for PVDIS (E08-011)
Presentation transcript:

MOM Report October 9- Now Linda R. Coney UCR

October 15 th Running Target Target Beamline Magnets Beamline Magnets Detectors? Detectors? Could not turn on HV supply in hall off HV supply crashed Target DAQ Target DAQ DAQ? DAQ? Could not run w/o detectors on Was NOT working Caused major problem Saturday

October 18 th Running Dosimeter arrays: Single dosimeter mounted on the exit window of the decay solenoid; Array of dosimeters on the inside the DSA north wall; Array of dosimeters on the inside of the DSA west wall; Array of dosimeters on the upstream surface of the fixed radiation-shield wall.

Results: October 18 th Running Goal1: Study beam loss and particle rate as fxn of target dip depth Goal1: Study beam loss and particle rate as fxn of target dip depth Goal2: Install dosimeters in DSA and Hall Goal2: Install dosimeters in DSA and Hall 19:20 Target actuations start. Time Loss setting GVA1 GVA2 Counts 19: : : :58 3 (repeat) : : :

Issues: October 18 th Running DAQ not working when start running DAQ not working when start running GVA2 disconnected – GVA2 disconnected – had to debug/discover/reconnect/power up had to debug/discover/reconnect/power up Target delay adjustment – caused target dipping to stop Target delay adjustment – caused target dipping to stop Had to debug – 1.5 hr delay Had to debug – 1.5 hr delay

October 19 th Running Goal: Measure change in activation of synchrotron with MICE target operating at MS/128 and producing beam loss at the 200 mV level for a period of sixteen hours. Goal: Measure change in activation of synchrotron with MICE target operating at MS/128 and producing beam loss at the 200 mV level for a period of sixteen hours. Dosimeter arrays installed Dosimeter arrays installed Pre-run rad survey done Pre-run rad survey done Turned on magnets, target, detectors, target DAQ, DAQ Turned on magnets, target, detectors, target DAQ, DAQ

Results: October 19 th Running New Target DAQ info New Target DAQ info ISIS beam intensity, Total Beam Loss ISIS beam intensity, Total Beam Loss Sector 7, Sector 8 Sector 7, Sector 8

Results: October 19 th Running New Target DAQ info New Target DAQ info ISIS beam intensity, Total Beam Loss ISIS beam intensity, Total Beam Loss Sector 7, Sector 8 Sector 7, Sector 8

Results: October 19 th Running NO issues getting started/running!! NO issues getting started/running!! Startup ~ 1 hour Startup ~ 1 hour Took data all day – 14 hours Took data all day – 14 hours Many shifters Many shifters Detectors and DAQ running Detectors and DAQ running scanned beam momentum in steps of 20 MeV/c from 100 MeV/c – 400 MeV/c scanned beam momentum in steps of 20 MeV/c from 100 MeV/c – 400 MeV/c 19, 658 target actuations 19, 658 target actuations

General ToDo List ELOG running and being used* ELOG running and being used* Install dosimeter arrays in/around DSA and hall – done, will stay until user run begins Install dosimeter arrays in/around DSA and hall – done, will stay until user run begins Establish routine monitoring points in hall with Charlie East – pending Establish routine monitoring points in hall with Charlie East – pending Need local time server in MLCR – JSG Need local time server in MLCR – JSG Need dedicated Windows machine in MLCR in order to change target delay – KL sorted out Need dedicated Windows machine in MLCR in order to change target delay – KL sorted out Target DAQ integrated into DAQ – pending Target DAQ integrated into DAQ – pending

General ToDo List Contd Decay Solenoid Fridge – Linde worked on fridge to fix recent problems Decay Solenoid Fridge – Linde worked on fridge to fix recent problems fit the pressure reducer and clean the gas after the blockage experienced in the last cool down fit the pressure reducer and clean the gas after the blockage experienced in the last cool down May still be leak - investigating May still be leak - investigating North wall finished by Nov 14 North wall finished by Nov 14 Dust/dirt in hall on/near power supplies still an issue Dust/dirt in hall on/near power supplies still an issue need professional cleaning need professional cleaning PPS – installing yellow cage doors next to MLCR, mezzanines PPS – installing yellow cage doors next to MLCR, mezzanines

Shutdown ToDo List Open up Decay Solenoid and install more diagnostics - done Open up Decay Solenoid and install more diagnostics - done Fix Q4, Q5, Q6 water leaks - done Fix Q4, Q5, Q6 water leaks - done Moveable beam stop in place/test – done & working Moveable beam stop in place/test – done & working Concrete floor block started – finished Concrete floor block started – finished FNAL beam monitors FNAL beam monitors Small one rebuilt, noise problem fixed, reinstalled behind DS, and running Small one rebuilt, noise problem fixed, reinstalled behind DS, and running almost done almost done Large one - pending Large one - pending Reinstall GVA1, GVA2 – done Reinstall GVA1, GVA2 – done Recover from power outage – done Recover from power outage – done Commissioning runs on CKOV – ongoing (Dan?) Commissioning runs on CKOV – ongoing (Dan?)

Documentation Need for standard procedural and for troubleshooting Need for standard procedural and for troubleshooting Target Target Beamline magnets Beamline magnets Decay solenoid/fridge Decay solenoid/fridge Detectors Detectors Target DAQ Target DAQ DAQ DAQ ELOG - works ELOG - works

Other Useful Changes Phones in MICE corral in R76 dial internationally Phones in MICE corral in R76 dial internationally New MICE visitors webpage New MICE visitors webpage Maps, instructions for first visit, safety training information, travel and transport info, local restaurant and lodging info Maps, instructions for first visit, safety training information, travel and transport info, local restaurant and lodging info Shipped 6 VLSB, 7 AFEIIt spare boards to FNAL (Terry comment) Shipped 6 VLSB, 7 AFEIIt spare boards to FNAL (Terry comment) New MICE digital camera New MICE digital camera Facilitate trouble shooting/documentation/recording actions Facilitate trouble shooting/documentation/recording actions Start overall contact list ** Start overall contact list ** MICE van CAN be parked overnight at Coseners House MICE van CAN be parked overnight at Coseners House Have established procedure for obtaining permission to drive van Have established procedure for obtaining permission to drive van Must be more formal than previously thought Must be more formal than previously thought

Future Commissioning Needs Standardize MOM handoff Standardize MOM handoff Wrote document for transition from my term to Dan Wrote document for transition from my term to Dan MOM handoff information MOM handoff information Hall search and secure procedure Hall search and secure procedure Daily walkthrough procedure Daily walkthrough procedure Prepare for running procedure Prepare for running procedure ToDo list as of end of current MOM term ToDo list as of end of current MOM term List of contact people for ongoing, high priority projects List of contact people for ongoing, high priority projects Should be edited/added to as needed Should be edited/added to as needed Documentation Documentation MUST document everything given few experts and many shifters MUST document everything given few experts and many shifters MUST use/read ELOG Exercise equipment regularly – whether taking beam data or not MUST use/read ELOG Exercise equipment regularly – whether taking beam data or not

Future Commissioning Needs Exercise equipment regularly – whether taking beam data or not Exercise equipment regularly – whether taking beam data or not Formalize run training like safety training? Formalize run training like safety training? certified to turn on magnets, dip target, run DAQ certified to turn on magnets, dip target, run DAQ Review previous run periods Review previous run periods How improve efficiency & productivity How improve efficiency & productivity What went wrong – how avoid next time What went wrong – how avoid next time Like M&M for med school (morbidity & mortality) Like M&M for med school (morbidity & mortality) Run review panel? Run review panel?