Contract 60X10 Informational Meeting Weber I-55

Slides:



Advertisements
Similar presentations
Capital Beltway HOT Lanes Project Project Update March 2009.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Grade Separation Alternative
1 M-150 / Botts Rd Interchange MoDOT Project No. J4P2251 Pre-Bid Meeting June 24 th, 2010.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Spotsylvania County Public-Private Transportation Act Spotsylvania County Infrastructure, LLC (SCI) June 2008.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Corridor-Wide Construction Presentation to FDOT Materials Lab
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
STA Safety Project PID #76439 December 12, 2006.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
MD 30 (Hanover Pike) at Mt. Gilead Road
Closure of S. Lazona Dr. at Main St.
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
MnDOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017 Mayor & Council Members - Thank you for giving us this opportunity to give.
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Molly Kline, Project Manager
Highway 110 Project Update
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
Signs, Signals, Markings & Speed Limits
Overview Project Limits Improvements Cost Anticipated Schedule
Overview Project Limits Improvements Cost Anticipated Schedule
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
I-84 Waterbury Project Project Overview July 2017.
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
I-69 Southwest/I-610 West Loop Interchange Reconstruction
I-295/Malcolm X Avenue Interchange Improvement Project
1200 West Widening and Reconstruction Project
Comprehensive Transportation Plan
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
St. Andrews Agenda Item 11.A & 11.B
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Contract 60X10 Informational Meeting Weber Road @ I-55 Normantown Rd. to 115th St. Will County Division of Highways Villages of Romeoville and Bolingbrook, Illinois Contract 60X10 Informational Meeting October 25, 2018 – 4:00 PM

OVERALL PROJECT LOCATION NTS Rodeo Dr/Remington Blvd OVERALL PROJECT LOCATION Total length: 1.55 miles Remington Blvd/Windham Pkwy Lakeview Dr Village of Romeoville Village of Bolingbrook Will County Normantown Road

Contracts Overview Contract 62F12 – Advance Tree Removal Contract Project Letting Date – 6/16/2017 Project Completion Date - 11/22/2017 – Project Completed Contract 60X10 – Main Contract Project Letting Date – 3/09/2018 – Construction Underway Project Completion Date - 8/6/2021

CONTRACT COSTS 62F12 – Tree Removal - $ 68,424.00 60X10 – Main Contract - $ 47,970,125.23 Totals = $ 48,038,549.23

Proposed Improvements Reconstruct Weber Rd – 1.55 miles Weber Rd - 6 Lanes Reconstruct I-55 Ramps Dual Bridge Structures Interconnected traffic signals through the interchange Sidewalk and 10’ Wide Shared-Use Path Retaining Wall installation Continuous LED Roadway Lighting with 4 High Mast Light Towers Enclosed Drainage System with In-Line Detention Overhead Sign Structures Signing and Pavement Markings CCTV Cameras and Fiber-optic Connection Intersection Improvements at Normantown Rd., Rodeo Dr/Remington Blvd & Remington Blvd/Windham Pkwy

Proposed Improvements – Normantown Rd. 3 Through Lanes in each direction on Weber Rd. New dual left turn lanes for SB & EB traffic Right turn lanes for 3 legs of intersection

FENCE STONE SOUND WALLS Adjacent to Residential Areas

Pavement Design Weber Road Mainline PCC Pavement 10-1/4” (Jointed) Aggregate Subgrade 12” Expressway Ramps – HMA Pavement (Full Depth), 12-1/4” Polymerized HMA Surface Crs,2” Polymerized HMA Binder 2-1/4” HMA Binder Course 8” Side Street Pavement Widening & Resurfacing HMA Surface Crs, 1-1/4” Polymerized HMA Leveling Binder 3/4” HMA Binder Course 8-3/4”

Who has heard of a Diverging Diamond Interchange?

Diverging Diamond Interchange – How To Drive a DDI

Traffic Lanes Open During Construction Pre-Stage – Off-Peak lane closures Stage 1 – 2 lanes open each way NB & SB Weber Stage 2 – 2 lanes open each way NB & SB Weber Stage 3 – 2 lanes open each direction on Weber Stage 4 – Partial Ramp closures on I-55 for 9 days Cleanup & Punchlist – Off-Peak lane closures

Pre-Stage Work Median removal and temp pavement Temporary Traffic Signals Temp Storm Sewer Utility Relocation Now to Mid-Late June 2019

Stage 1 Traffic on east side, Normantown to 115th West half of Weber Rd. Reconstructed New northbound bridge constructed Ramp Reconstruction July 2019 to June 2020

Stage 2 Traffic on west side, Normantown to 115th East half of Weber Rd. Reconstructed Reconstruct existing bridge deck for future southbound traffic Ramp Reconstruction June 2020 to May 2021

Stage 3 Traffic on new pavement, Normantown to 115th Construct new medians Complete ramp reconstruction Complete sidewalk and multi-use-path in bridge area May 2021 to August 2021

Stage 4 Traffic on new pavement, Normantown to 115th Partial I-55 exit ramp closures for 9 days requiring detours July 2021/August 2021

SB I-55 Exit Ramp Detour

NB I-55 Exit Ramp Detour

Questions?