Status of the EUDET Prototype

Slides:



Advertisements
Similar presentations
HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Advertisements

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Current ILC work at Fermilab Electrical Engineering Dept.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
Mathias Reinecke CALICE week Manchester DIF development – Status and Common Approach Mathias Reinecke for the CALICE DAQ and Front-End developers.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
ASU boards for RPC detectors Production status. Presentation outline Active Sensor Unit electronic board for GRPC detectors – quick reminder – board functional.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Mathias Reinecke EUDET Annual Meeting 2008 – NIKHEF AHCAL Power Aspects P. Göttlicher, M. Reinecke, H.-J. Wentzlaff for the AHCAL developers.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
14.4. Readout systems for innovative calorimeters
JRA3 Institute of Physics ASCR Prague
Development of T3Maps adapter boards
LED notched fibre system short HBU0 party with QMB6
ASU board: PCB production and testings
Status of HBU, EBU and SM_HBU
AHCAL Detector Interface electronics
CALICE meeting 2007 – Prague
Status of the DHCAL DIF Detector InterFace Board
HCAL task status report
Testbeam Timing Issues.
10/month is the present production rate 2 FTE + sporadic contributions
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
CALICE/EUDET Electronics in 2007
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
A fast LED driver prototype for HCAL calibration
State of developments on Readout interface of European DHCAL
Scintillator HCal Prototype
Presentation transcript:

Status of the EUDET Prototype Benjamin Lutz for the AHCAL developers 20.2.2009

Outline Status of Modules‘ developments: Flexible Interconnection Foils (POWER, SIGNAL) Prototype Cassette Reflector Foils POWER CALIB HBU DIF firmware Timeline issues 20.2.2009

HBU Interconnect Interconnection between the 6 HBUs of a slab, and between HBU0 and the DIF. 2 types have been realized: SIGNAL and POWER flexleads. Flexleads finished (20 pieces of each type). Tests can be performed when HBU arrives. Pre-bending necessary 20.2.2009

Prototype Cassette & Setup Drawings: A. Schröder Cassette Top Plate HBU SPIROC1 Bolt (cassette) Flexlead CALIB DIF Reflector Foil (top) Tiles Cassette Bottom Plate (fixation nose) Setup Support 20.2.2009

Prototype Cassette & Setup Two prototype cassettes have been realized (top plate not shown). Bolt (cassette construction) Flexlead CALIB Place for HBU0 (12x12 tiles) DIF Tile Setup Support Cassette Bottom Plate (fixation nose) 20.2.2009

Light Calibration ‚Fibre Based‘ Connection of the QRLD board to the AHCAL prototype system Two notched fibers (12 tiles each) QRLD6x board (ASCR Prague): „Quasi Resonant LED Driver Board“, 6 drivers 20.2.2009

Reflector Foils Bolt SiPM pins The reflector foils are Alignment pins The reflector foils are placed below and on top of the tiles. The upper foil has about 500 laser-cut holes (alignment pins, SiPM pins, cassette contruction). Reflector Foils arrived at DESY mid Jan. Problems: Foils are curled, reason is unknown up to now (moisture?). Foil must be glued to PCB with high accuracy (holes in PCB and foil must fit) 20.2.2009

POWER module System can be operated without POWER module (bench-top power supplies) => production shifted to early 2009 Schematic is finished. Layout: starting within these days, similar shape as CALIB module. The POWER module carries the power regulators for the AHCAL electronics. It enables the ILC power-cycling of the inner- detector electronics as well as the current- and voltage sensors. 20.2.2009

CALIB module CALIB Module finished (4 pieces) µC programming in progress. Tests are currently ongoing in stand-alone mode. For final tests the HBU is needed. The CALIB module operates the AHCAL specific light calibration system and the readout of the temperature and voltage/current sensors. ARM7 µController Interface to HBU (flexleads) 20.2.2009

HBU0 module (old view) 20.2.2009

HBU0 module PCBs are in production. PCB has 6 layers (only 2 layers shown), with cutouts for SPIROCs. Typical size: 36x36cm² (144 detector channels) The HBU integrates 144 scintillating tiles with MGPDs together with 4 SPIROCs and the AHCAL light calibration system (2 types) 20.2.2009

DIF Firmware DIF-DAQ interface defined within DIF task force, see: http://adweb.desy.de/~reinecke/DIF_Firmware_vers1_9.pdf AHCAL: USB-DIF interface has been set up first (Labview), LDA follows afterwards. Timing diagrams DIF-ASICs (SPIROCs) have been developed in a preliminary version First system with basic operations expected beginning of March. Example: Sequence from DIF after a slow-control config.- command from DAQ. 20.2.2009

Timeline Issues The HBU0 / HBU modules determine the timelines: HBU0 PCB expected early March., ordered at 2 companies (PCB complexity) HBU0 tiles have been produced (ITEP). ASICs (SPIROC1 and SPIROC2, packaged) should arrive end of Feb. Assembly within 2 weeks (SMD components, tiles) Challenging timeline for the modules‘ redesigns (EUDET ‚layer-module‘), minimum required: HBU: only one type of ASICs. HBU0 test results define redesign. HBU redesign needs input of tile shape and SPIROC pinout. DIF (replace commercial board). Firmware development has to take place ‚step-by-step‘ in parallel to DAQ-DIF setup. Flexleads, CALIB and POWER could be used for final setup (to be discussed). 20.2.2009

Conclusions Timeline is challenging for EUDET layer module: - timeline does not include perhaps necessary redesigns. Prototype system, based on USB control, expected beginning of April Redesigns for ‚Layer Module‘ require preconditions fulfilled: successful prototype-operation, mechanical boundaries within and at the end-face of the absorber structure, DAQ operation of the detector, (the new) tile-dimensions, ASIC‘s pinout. (=> minimize number of redesigns?). 20.2.2009