HELLENIC NATIONAL METEOROLOGICAL SERVICE

Slides:



Advertisements
Similar presentations
The COSMO-LEPS system at ECMWF
Advertisements

COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
HELLENIC NATIONAL METEOROLOGICAL SERVICE Locations WMO / PMO III Hamburg March 2006 National report Greece.
COSMO-Ru1: current status Marina Shatunova, Gdaliy Rivin, Denis Blinov Hydrometeorological Research Center of Russia Thanks our colleagues from MeteoSwiss.
Verification of DWD Ulrich Damrath & Ulrich Pflüger.
CAMx simulations of Middle-East ozone concentration-trends by use of RAMS and MM5 input Shoukri J. Kasakseh Shoukri J. Kasakseh †º,
Meteorological and Hydrological Service, Grič 3, HR Zagreb, Croatia FORECASTING BORA WIND AFTER THE COLD FRONT PASSAGE AT.
NWP at the Italian Meteorological Service: STATUS REPORT 29 th EWGLAM, Dubrovnik, 8-11 October 2007 Massimo Bonavita, Lucio Torrisi, Antonio Vocino and.
The National Environmental Agency of Georgia L. Megrelidze, N. Kutaladze, Kh. Kokosadze NWP Local Area Models’ Failure in Simulation of Eastern Invasion.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
27 May 2004 C.N. Papanicolas EGEE and the role of IASA ( In close collaboration with UOA ) IASA GRID Steering Committee: George Kallos Lazaros.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
COSMO Priority Project CORSO “ C onsolidation of O peration and R esearch results for the S ochi O lympic Games” General Meeting 2011.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Latest results in verification over Poland Katarzyna Starosta, Joanna Linkowska Institute of Meteorology and Water Management, Warsaw 9th COSMO General.
The latest results of verification over Poland Katarzyna Starosta Joanna Linkowska COSMO General Meeting, Cracow September 2008 Institute of Meteorology.
Sensitivity experiments with the Runge Kutta time integration scheme Lucio TORRISI CNMCA – Pratica di Mare (Rome)
Operational ALADIN forecast in Croatian Meteorological and Hydrological Service 26th EWGLAM & 11th SRNWP meetings 4th - 7th October 2004,Oslo, Norway Zoran.
3 rd Annual WRF Users Workshop Promote closer ties between research and operations Develop an advanced mesoscale forecast and assimilation system   Design.
Ensemble data assimilation in an operational context: the experience at the Italian Weather Service Massimo Bonavita and Lucio Torrisi CNMCA-UGM, Rome.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
Status of the COSMO-Software and Documentation WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Meteorology 485 Long Range Forecasting Friday, January 16, 2004.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of the COSMO-1 configuration at MeteoSwiss Guy.
U. Damrath, COSMO GM, Athens 2007 Verification of numerical QPF in DWD using radar data - and some traditional verification results for surface weather.
General Meeting Moscow, 6-10 September 2010 High-Resolution verification for Temperature ( in northern Italy) Maria Stefania Tesini COSMO General Meeting.
COSMO General Meeting Zurich, 2005 Institute of Meteorology and Water Management Warsaw, Poland- 1 - PLANS FOR FUTURE Institute of Meteorology and Water.
31 October – 2 September 2011 Young-Youn Park Numerical Model Development Division, Korea Meteorological Administration KMA report.
Kalman filtering at HNMS Petroula Louka Hellenic National Meteorological Service
Vincent N. Sakwa RSMC, Nairobi
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
Evaluation of the ECMWF ERA-interim wind data for numerical wave hind-casting in the Caspian Sea Iranian Port and Maritime Organization The University.
New task within PT Support Activities “Support of COSMO licensees”
Introducing the Lokal-Modell LME at the German Weather Service
Overview on the Work of WG 6
GPC-Seoul: Status and future plans
Italian Meteorological Service Pratica di Mare, Rome, Italy
Overview of the COSMO NWP model
COSMO CONSORTIUM OF SMALL-SCALE MODELLING
دانشگاه شهیدرجایی تهران
SFSPA and OPA Document No. 4
تعهدات مشتری در کنوانسیون بیع بین المللی
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Preliminary test for the development of a 2.8km ensemble over Italy
COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
Operational Aladin-Belgium
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
COSMO Projects th COSMO GENERAL MEETING
Огторгуй ба амидрал Cosmos and life
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
SRNWP-PEPS COSMO General Meeting September 2005
Long-range forecast verification
Strategy for the coming years
Plans in Romania Dr. I.V.PESCARU.
INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT
COSMO General Meeting Zurich 2005
Objective verification results for RK parallel runs
Seasonal common scores plots
Short Range Ensemble Prediction System Verification over Greece
Massimo FERRI 9th COSMO General Meeting
WG4 activities. Discussion
NWP Test Suite: some updates
Presentation transcript:

HELLENIC NATIONAL METEOROLOGICAL SERVICE COSMO GENERAL MEETING Athens, 18-21 September 2007 PLANS and EXPECTATIONS from COSMO-GR in HNMS Ioannis Papageorgiou e-mail: ipapag@hnms.gr

Configuration of Cosmo-GR at HNMS MODEL Domain size: 40.5 x 24.5 deg Horizontal grid spacing: 0.0625 Number of layers: 35 Time step: 30 Forecast range: 72 hrs Initial time of model runs: 00:00 12:00 Initial state: From ECMWF From DWD Model version running: 4.0 HARDWARE Machine: IBM Power4 Number of CPUs: 140 (~half CPUs from available total)

The whole configuration of COSMO-GR ECMWF/DWD Cosmo-GR NMC Initial fields 00:00 UTC, 12:00 UTC 6-7 km MSLP GPH U V T Td Q PRECI

The operational domains of SKIRON-Εta and COSMO-GR

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 3 hrs

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 24 hrs

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 48 hrs

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 72 hrs

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 96 hrs

Applications in HNMS for the next COSMO-year using Cosmo-GR 1. Incorporation in Nudging AMDAR’s buoys and AMS information 2. Operational use of COSMO-GR for pollution events in the East Mediterranean Sea (Collaboration with WMO) 3. Detailed verification of Cosmo-GR over all the country 4. Use of the Common Verification developed as a priority project 5. Use of SREPS results 6. Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea + 108 hrs

Thank you for your attention HELLENIC NATIONAL METEOROLOGICAL SERVICE NUMERICAL FORECASTING-RESEARCH DIVISION http://www.hnsm.gr Thank you for your attention