Presentation is loading. Please wait.

Presentation is loading. Please wait.

COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)

Similar presentations


Presentation on theme: "COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)"— Presentation transcript:

1 COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
Krakow, September 2008 PLANS and EXPECTATIONS from COSMO-GR in HNMS Dr. Theagenis Charantonis

2 Achievements from last year
Operational use of Cosmo-GR for issuing marine routes in the Aegean Sea (next slide). Almost full compliance with the PP that we participated Web site support

3

4 Status of our NWP System
Hellenic National Meteorological Service models are: COSMO – GR RAMS SKIRON

5 Configuration of Cosmo-GR at HNMS
HARDWARE Main Machine: IBM Power4 Cluster 0.3TerraF Sub.Perf (sp) Number of CPUs: 140 (~half CPUs from available total) Backup Machine: HP Itanium Cluster 50GF(sp) as back up and research purposes MODEL Domain size: 40.5 x 24.5 deg Horizontal grid spacing: Number of layers: 35 Time step: 30 sec Forecast range: 72 hrs (in 45 min) Initial time of model runs: 00:00 12:00 Initial state: From ECMWF From DWD Model version running: 4.0

6 The whole configuration of COSMO-GR
ECMWF/DWD Cosmo-GR NMC Initial fields 00:00 UTC, 12:00 UTC 6-7 km MSLP GPH U V T Td Q PRECI

7 The operational domains of SKIRON-Εta and COSMO-GR

8 Strategy of HNMS Implementation of 2.7Km COSMO-GR and parallel running for Verification purposes, especially for some important cases affected Greek area. Development of special applications to assist forecaster’s work (TAF, Sea Bulletins etc) Implementation of COSMO-GR in Nowcasting System Collaborations with Greek Universities and other National Research Institutes

9 Improvements - applications - research in HNMS for the next year using Cosmo-GR
Better incorporation in Nudging of AMDAR, buoys and AMS information Operational use of COSMO-GR for pollution events over the East Mediterranean Sea (Collaboration with WMO and MeteoFrance) Systematic verification of all operational models Use of the Common Verification developed as a priority project Use of SREPS results + 24 hrs

10 Thank you for your attention
HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS) NUMERICAL FORECASTING-RESEARCH DIVISION Thank you for your attention


Download ppt "COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)"

Similar presentations


Ads by Google