Electricity Governance Comparison

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Review of industry code governance 26 March 2010.
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Proposer: insert Panel Date: insert 0XXX: Mod Title: insert title Guidance: These slides are meant to provide a brief overview for the UNC Panel, to introduce.
1 Project Nexus Market Differentiation Workplan Version 0.2 Draft.
Overview of Balancing & Settlement Code Change Process By Gareth Evans on Behalf of Gazprom Marketing & Trading –Retail.
Code Governance Review: follow up. 2 Background CGR implementation PID included the following deliverable –“achieve a demonstrable cultural shift within.
Code Administrators Working Group (CAWG) Meeting 3, 29th October 2008.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Industry Dialogue on xoserve Services 14 th September 2007.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
BEIS Update SEC Panel 21 April 2017.
Distribution workstream 29th January 2009
Supply Point Enquiry Service
CMP277 ‘Special License Condition 4J’ CMP278 ‘BSIS 2017 Housekeeping’
Transmission Workstream February 2009
DSC Change Governance Review Group
Grid Code What is the Standard Modification Process? Panel
CGR2 Summary Proposals UNC Panel 18 October 2012.
Manifest Errors for Entry Capacity Overruns Workgroup 364
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Introduction of Code Contingency Guidelines Document
Overall Project RAG Status
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Authority decision on CAP086 –Implementation Dates
UNC Modification Proposal 0373
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Code Governance Review UNC Modification Proposals
Project Nexus Workgroup
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
Code Administration Code of Practice
7th July 2011 Transmission Workgroup - Elexon
The Necessary Criteria for a UNC Modification Proposal
Consideration of issues raised by UNC Modification Proposal 0244
Overall Project RAG Status
Impacts of Project Nexus Implementation Date to AQ17
Modification 0333A – implementation info
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Joint Office Presentation for Modification 0678
Flow Swaps at NTS / LDZ offtakes
Introduction of Code Contingency Guidelines Document
Proposer: Transporter /
Interruptible to Firm – NTS Supply Point Transition
CDSP Service Document amendment - high-level activity description*
Richard Fairholme Transmission Workstream 4th September 2008
Consideration of issues raised by UNC Modification Proposal 0244
Mark Freeman 29th January 2007
Modification 0448 – European Driven Change Process Flow Diagram
CUSC “Alternate” Proposal process
Proposer: Colette Baldwin – E.ON Energy Solutions Ltd
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Title slide [from Title Slide master]
Key Impacts Modification Proposals Legal Text Modification Reports.
DCUSA PARTY PANEL SECRETARIAT OFGEM CHANGE PROPOSAL SUBMITTED
Project Nexus Workgroup
Xoserve Draft UIG Incentives Modifications 20 May 2019
Proposer: Tracey Saunders, Northern Gas Networks
Presentation transcript:

Electricity Governance Comparison Chris Shanley

CUSC Governance Mods CMP195 CGR post implementation clarifications Housekeeping Mod to address Ofgem comments on legal text: Oct 2010 (15 pages) March 2011 May 2011 CMP198 Proposer Ownership of CUSC Modification Proposals Currently a CUSC Workgroup takes over ownership of any Mod referred to it CAWG recommendation that the Proposer should retain ownership. Any other party or the Workgroup can raise an alternative proposal. Also allows the Panel to agree to minor corrections to be made to the legal text (at the time of the recommendations vote). If corrections are major a further consultation on the revised text will be carried out.

CMP198 Process

Key differences UNC CUSC Workgroups are open to all Workgroup has a closed Membership No voting procedures Voting Procedures (50% attendance) No Workgroup consultation Workgroup Consultation (mandatory) Panel/CA set Workgroup timetable (up to 6 months) Panel/CA set Workgroup timetable (up to 4 months) Panel decide a Mod is an alternative (shall go to the same workgroup as the original) Workgroup agree alternatives Proposers own original and any alternative Modifications Workgroup owns original* and any alternatives Legal text shall be included prior to industry consultation but Panel can agree to exceptions (suggested text (which can be changed) is suffice) Legal text shall be provided prior to WG consultation and cannot be changed* once a Mod has been issued to industry consultation * Could be changed by CMP198