The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
2-3rd. September 2002TPC Collaboration Meeting1 TPC INTEGRATION & SERVICES Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
André Augustinus 9 October 2006 Interlocks update.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Pre-installation and Functional Tests
Gas System Commissioning
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
Status of the Front-End Electronics and DCS for PHOS and TPC
Alice TPC DCS.
Pierluigi Paolucci - I.N.F.N. Naples
The LHCb Run Control System
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Experiment Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

TPC Detector Control System 9 December 2018 U. Frankenfeld

TPC sub-detectors and sub-systems ROC Field cage Th. Screen Laser Equip. Gas High Voltage High Voltage Cooling laser crate Low Voltage Cooling … Cooling I monitor FEE Pulser 9 December 2018 U. Frankenfeld

High Voltage Read Out Chamber ISEG Solution available (work ongoing) Prototype Connection to hardware from PVSS CANbus (18 nodes) ISEG 3 crates ISEG ISEG PX UX 288 channels TPC 9 December 2018 U. Frankenfeld

Low Voltage ROC Wiener Wiener Wiener TPC Wiener Prototype Solution available (work ongoing) Prototype Connection to hardware from PVSS CANbus (22 nodes) Wiener 22 crates Wiener Wiener PX UX 808 channels TPC 9 December 2018 U. Frankenfeld

Cooling Read Out Chamber/FEE Plant Common effort (ST/CV) Prototype Readout Cooling Study thermal behavior Investigate front-end solutions PX UX Ethernet 1 PLC PLC plant 44 channels Heater PLC 1-2 PLC with remote I/O ? T TPC 9 December 2018 U. Frankenfeld

Front End Electonic RCU RCU RCU FEC FEC FEC Front End Electronics Voltage regulation Temperature Status Depending on implementation of communication PX UX Profibus, Ethernet ? RCU 216 RCU’s RCU RCU Local private bus FEC 4356 FEC’s FEC FEC 9 December 2018 U. Frankenfeld

Gating Grid pulser New item Under discussion Pulser Crate Profibus ? PX UX Pulser Crate 9 December 2018 U. Frankenfeld

High Voltage Fieldcage FUG Interface to be studied Prototyping HV power supply Current monitor RS232, Profibus? FUG 1 crate PX UX 1 channel TPC 9 December 2018 U. Frankenfeld

Cooling Fieldcage TPC Investigating of final solution Depending on tests Prototyping Resistor rod cooling PX UX Ethernet 4 channels Heater PLC 1 PLC T TPC 9 December 2018 U. Frankenfeld

Cooling Thermal Screen readout: Similar to FEE cooling PX UX Ethernet 1 PLC PLC plant 18 channels Heater PLC 1-2 PLC with remote I/O ? T TPC 9 December 2018 U. Frankenfeld

Laser system ? Integration into TPC DCS Fieldbus ? PX UX 9 December 2018 U. Frankenfeld

Crate control Common to Alice Crate(s) Crate(s) CANbus ? PX UX 9 December 2018 U. Frankenfeld

Gas system Gas working group Parameters published to TPC DCS Status Alarm handling Flow, pressure, mixture … (defined by TPC) Additional sensors like Drift velocity monitor 9 December 2018 U. Frankenfeld

Next Step: Finite State Machines Control Units ECS ... LHC DCS ... ... TPC TRD Abstract levels Commands Status & Alarms FC ROC Cool. HV LV ... Device Units Crate Crate Crate To Devices (HW or SW) 9 December 2018 U. Frankenfeld

DCS Planning 9 December 2018 U. Frankenfeld

DCS planning September 2002 February 2003 Electronics (FEC) tests Basic HV and LV DCS functionality February 2003 Electronics (RCU) tests Basic HV and LV DCS functionality, evolving based on operational experience DCS connection to RCU Will include test-beam 9 December 2018 U. Frankenfeld

DCS planning April 2004 2005 2006 Pre-installation at SXL2 Card by card, chamber by chamber, sector by sector tests HV, LV, cooling, gas; DCS with increasing functionality and integration 2005 Cosmic running with TPC at surface Full TPC DCS to allow (unattended) cosmic running 2006 Installation and commissioning 9 December 2018 U. Frankenfeld

Summary URD for most sub-detectors and sub-systems Hardware commercial solutions if possible (PLC) common LHC solutions (ELMB) Hardware – SCADA interfaces commercial solutions if possible (OPC server) Integration of Laser System Solution to interface to Fieldcage HV PS to be studied Solution for FEE controls depend on choice of communication Final solution on cooling depends on prototype results Started discussing operational requirements (FSM) 9 December 2018 U. Frankenfeld