Strawberry Point School Modernization Summer 2012.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Victorian Style Houses
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Madison Elementary School District Bond Update December 3, 2013 Extraordinary Learning For All.
Maintenance and Operations Report Summer Summer 2011 Custodial Update Budget Reductions: Reduced custodial staff by 1 full time equivalent Eliminated.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Eldred Central School District Five Year Capital Facilities Plan September
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Prop W Independent Citizens’ Oversight Committee Lemon Grove School District Slideshow of Projects Board Presentation May 2013.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Ocean Dunes Special Assessment 2013 o Problems with Roofs Building Envelope and Generators o Roofs – No Name Storm o Generators – Rust, mechanical problems.
Suisun Valley School K Classroom Addition Project.
Architectural Elevations
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Curb Appeal: Small Investments with Attractive Returns August 21,2014.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
Identifying Information: Common Areas - 1 none LEVEL 2.
Riverside Community Schools Overview of Summer Maintenance Projects.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
Teknologi Dan Rekayasa TECHNOLOGY AND ENGINERRING PROGRAM STUDI KEAHLIAN (SKILL DEPARTEMEN PROGRAM) : TEKNIK BANGUNAN (BUILDING TECHNOLOGY) KOMPETENSI.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
The OHIO SCHOOL FACILITIES COMMISSIONAssessor & RPC Summit; July 1, 2008.
Finishing the Building
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Chapter 21 Roof Plan Layout. 2 Links for Chapter 21 Lines and Symbols Materials Drawing Roof Plans.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Administrator Sodexo Performance Survey June 9, 2015.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Weather Resistance.
Chapter 21 Roof Plan Layout.
* 07/16/96 Site Development Plan * ##.
Capital Improvements Presentation
Chapter 10 Construction Basics.
CSUEB Facilities Department Custodial Cleaning Frequency Expectations
Huntsville City Schools Huntsville High School Softball
Albemarle County Public Schools
The summer of 2018 and all the work that has taken place
Charter Oak Unified School District
Capital Outlay Workshop
Recent Bond Accomplishments
Mount Vernon Community School
Presentation transcript:

Strawberry Point School Modernization Summer 2012

New entry, landscape, trench drain, and playground striping Before After Landscape and playground striping

New ducts, paint, and playground striping Before After Leaking roof top ducts, playground striping

Raised tree canopy for better site lines, new waiting area, new entry gate, new waiting area for pick up Before After Entry gate, and landscape

New light poles, entry portico, locking gates, new flagpole, new paint, new display board, new sidewalk Before After Main entry, rolling gate, flagpole

New paving and paint Before After Decomposed granite

New portico, paving, fence, locking gate, and flagpole Before After Main entry

New paint, paving, fence, locking gate, and portico Before After Entry

New integrated entry matts, new paint interior and exterior Before After Entry matts

New playground striping, paint, flagpole and entry Before After Playground, and entry

Raised tree canopy, expanded planter area, new black top patching, new playground striping Before After Landscape and blacktop

New covered walkway, new paint, new playground striping Before After Classrooms, playground striping

New mechanical venting, new lighted exit signage Before After Passive venting in hallway

New carpet with abrasive action inserts at entry doors Before After Portable classrooms carpet

New carpet with rubber transition strips Before After Old carpet and metal transition strips

New paint, and cubbies Before After Coat hooks

Sheet metal flashing to have continuous rain protection at portable classrooms Before After Gaps between overhangs at portables\

New covered walkway, railings, and paint Before After Walkway from main building to portable classrooms

New covered walkway, ADA compliant water fountain and paint Before After Walkway from main building to portable classrooms and restrooms

New fence, gate and paint Before After Kindergarten area

New paint, fence, asphalt, playground striping, walkways and sandbox Before After Kindergarten play area

New paint, fence, asphalt, playground striping, walkways and sandbox Before After Windows, Paint, Roof, Doors, Lights, Gutter, Landscape, Ramp, Stairs, RailingsKindergarten play area

Converted to new custodial closet Before After Closet

New tiles Before After Water damaged ceiling tiles

New projector, screen, speakers, and clock Before After Typical classroom