Remodel / Resurface. Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Installation Presentation
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Common Components of a Traditional Wood Framed Building
Doors Wood Framed Doors.
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
NGfL CYMRU GCaD FLOOR COVERINGS.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Horticulture CD Unit C3-5: Nursery, Landscaping, and Gardening.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Competency: Draw Wall Sections
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
Building a Wooden Planter Box. The Most Important Part of any Project is the Planning Determine what type of wood to use for the box (pine, cedar, cypress,
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Ms. Gripshover Landscaping Unit 18 INSTALLING PATIOS, WALKS, AND DECKS.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Foundation Systems.
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
Remodel / Resurface. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
New Construction. Manufacturer’s Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Lumber Section II. Lumber Structural Strength Depends on species and grade, and the direction in which the load is acting with respect to grain of the.
CONSTRUCTING A FIVE CABIN LATRINE
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
TABS II Installation Presentation. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
DECKS. Square Corner Framing square Square Corner triangle.
How to build raised garden beds for small space gardening How to build a raised garden bed, which tools, material and skills needed. How much does it cost.
Manufacturer’s Recommendations
Chapter 8: House Construction
Installation Presentation
Constructing Homes and Other Buildings
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Intro to Concrete 18.0 & 19.0 Class notes.
Chapter 35 Section Layout.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
INTD 54 other components. moldings cover, enhance and decorate a plain surface standing trim: fixed length—doors & windows.
Construction Drawings
Chapter 23 Elevation Layout and Drawing Techniques.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Competency: Draw wall sections and details
Wood Construction CTC-375.
Framing the House. Platform Framing Platform framing.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
MOUNTING PHOTOS FOR STATE FAIR
How to Build a Divider Wall By Charysse Roberson.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
TABS II Contractor Installation CD. TABS II Before getting started, please read & familiarize yourself with the Tabs Wall Systems Estimating & Installation.
Applying Borders and Shading Adding Bullets and Numbering.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Making Made from Scratch Concrete Stepping Stones Created by: Joan Jackson, Tiffany Prather and Dr. Frank Flanders Agriculture Education Curriculum Office.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
APPLICATIONS OF TECHNOLOGY
Competency: Draw wall sections and details
Competency: Draw Wall Sections
Elevation Layout and Drawing Techniques
PPT PROCEDURES TO INSTALL PAVERS
Competency: Draw wall sections and details
Common Components of a Traditional Wood Framed Building
Competency: Draw Wall Sections
Presentation transcript:

Remodel / Resurface

Manufacturers Recommendations Remove all horizontal flooring, wood, composite lumber, etc. from existing deck. CAUTION: Have a qualified person inspect all footings and joists. (See for checklist.) CAUTION: Make sure the ledger board is bolted or all-thread bolted all the way through the box beam on house. The manufacturer recommends footings 6 ft. on center and floor joists 16 in. on center.

Remodel / Resurface Instructions for Adding Silca Grate TM to an Existing Deck Structure

Remodel / Resurface Establish finished floor elevation. Determine thickness of deck material choice. Preparation

Remodel / Resurface Establish finished floor elevation. - Allow for existing constraints such as doorway thresholds. Preparation

Remodel / Resurface Make plan of layout and pattern of deck materials (i.e. Natural stone, paver stone, brick or tile). Preparation

Remodel / Resurface Natural stone, pavers, tile, etc. Wrap rim joist with aluminum or vinyl Fascia board (various materials) Choose From 3 Border Types Brick Fascia board End of Joist (Front) View

Remodel / Resurface Deck Construction Make plan of layout and pattern of deck materials (i.e. Natural stone, paver stone, brick or tile). Add 2x4 cleats on to both sides (except the exterior of the fascia boards) of joists 1-1/2 below the top surface of the joists.

Remodel / Resurface Cut Silca Grates TM to Fit Between Joists Note: Silca Grates TM have 2 sets of 3 screw holes on one side and 1 set of 3 on the other. Cut to width on the 2-set side.

Remodel / Resurface Silca Grate TM Orientation Before placing Silca Grate TM on deck joists be sure reinforcement straps face down. NO YES

Remodel / Resurface Place Silca Grates TM on Top of 2x4 Cleats Screw in place with deck screws Install Silca Grate TM over desired area.

Remodel / Resurface Install Geotextile / Landscape Blanket Install geotextile / landscape blanket over Silca Grates TM if polymeric sand is to be used in construction.

Remodel / Resurface Test Install for Fit Now is the best time to test install your choice of decking to check for pattern and material fit and trim.

Remodel / Resurface Complete Installation of Decking Material

Remodel / Resurface Fill All Joints of Decking Material with Polymeric Sand* * See next page for polymeric sand application tips.

Remodel / Resurface Polymeric Sand Application Tips Check weather forecast to allow for 12 hours of curing time without precipitation. Pour Polymeric sand into all joints from bag. Use broom to ensure all joints are filled with sand. Excess sand on the surface of the decking material can be removed using a wet/dry vacuum or leaf blower LIGHTLY. Be sure all joints remain filled with sand. Lightly mist polymeric sand and entire deck material surface using a garden hose or mister. Be sure all joints are saturated. Repeat misting 3 times.

Remodel / Resurface Enjoy Your New Deck!

Remodel / Resurface Let Us Know… We enjoy receiving pictures and descriptions of your Silca Grate TM installations and your finished decks. We can also always use your feedback and ideas from your installation experience. You can contact us at: