(Preliminary) WIYN 0.9 Meter Collimation Procedure

Slides:



Advertisements
Similar presentations
How To Install RAM In Laptop Installing Larger RAM is the easiest way speed up your laptop computer. This Post will guide you about installing laptop computers.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Zebra® 105SL™ * Removing and Installing Printhead
1 Stripe 400/600 Removing and Installing Printhead Printhead Resistance Calibration Toggle Position Adjustment.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
INSTALLATION INSTRUCTIONS IMPORTANT: Read all instructions before performing any work. To avoid the risk of electric shock, turn off power before installing.
Presenting A Power Point Program. Computer Checklist Computer Checklist Power Cord Mouse Computer.
Theodolite: Introduction
Installation of Peripherals. I. Backup Battery.
A-dec 500 Adjustments Most adjustments are set at the factory during assembly or prior to packaging so they should not need initial adjustments. If they.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Ford F Series Air Box Modification. Ford F series model year 2011 trucks have plastic air box assemblies. It has been discovered that a plastic tab on.
Volvo 270 Outdrive R&R (for bellows replacement)
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
3” BACKWASH VALVE WITH SUPERSTAR ACTUATOR BASIC SERVICE MANUAL Does not apply to PLC-MP version SUPERSTARS.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Head jig usage procedure RKC London Office. Set the head jig 2) Put two screws with loose condition 3) Lock the plate 4) Tighten two head jig screws 5)
Meade 8” LX 90 Telescope. The Objective is the main light-gathering apparatus of the telescope. Our telescope has an 8” diameter mirror for its objective.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 Presented by the St Paul Sail and Power Squadron.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
Team 2 Tyler Brun Ashlea Krupa Seung Ho Park Gage Hermanson.
1 © 2011 Profile Recorder for ProtoFlow S Installation Instruction.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Installation. Indoor Unit Installation Typical Installation.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
Showing Demonstrations on the TV How to connect the camera to our TV set.
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
Service Seminar Memory Craft Removing the Face Plate 1. Open the face plate. 2. Remove the 2 screws and remove the face plate. 1.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
PARKING BRAKE OPERATION, DIAGNOSIS, AND SERVICE
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Router Safety Foundations of Agriculture I Mr. DeBord.
Model 12 Intek Horizontal OHV
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Limited rotation servo basics David Hall output shaft servo horn red wire = 5V + black wire = Gnd - white wire = control signal standard servo.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Engine Technology Time the Ignition Some service procedures require removing the distributor from the engine. If the crankshaft is turned, the proper relationship.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Lab 3 - Centering.
PostBase Automatic Feeder Component Removal Service Training
Celestron 8” CPC Deluxe 800 HD Telescope
Bilge Pump Service Project Model Service Kit
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
Theodolite: Introduction
Theodolite: Introduction
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
Motorized Miter Saw.
BIX In-Building Cross Connect system
Meeting In A Box Set Up Guide
T400 Motor Replacement.
Lab Cleanup Practices Following Experiments
Mounting a BalanceBox®650 to a brick wall
Ford F Series Air Box Modification
Delphi Fuel pump. Overshoot protection screw. No load throttle adjust
1.11: Robot Controller.
SAVI SCOUT® System Setup
Replacing TrueAir Thermostat with Ecobee SI
REPLACING ECONOMIZER ACTUATOR MODULE
Replace Timing Belt 300 Hours.
Presentation transcript:

(Preliminary) WIYN 0.9 Meter Collimation Procedure Tilt the telescope to Mirror Cover Park position Remove mirror cover Release the two secondary mirror holder clamps The East one first – (Figure 1) Then, holding on to the secondary support, release the west clamp – (Figure 2) NOTE: To loosen the secondary mirror clamps, turn the inner locking segment (Figure 3 - A) counter-clockwise, until it’s loose. Then, turn the outer segment, the lock (Figure 3 - B), until it “pops” out. Unplug the plastic connector indicated in (Figure 4) Figure 1 Figure 2 A B Figure 4 Figure 3

Figure 5 Rotate the secondary mirror assembly ~ 150 degrees, so the front of the secondary can be accessed (Figures 5 & 6) Remove the black secondary mirror center mask, which is about 4” in diameter via three screws (Figures 6 & 7). This will reveal a small cross that has been etched into the center of the secondary mirror, which is used for this collimation procedure. (Figures 8 & 9) Figure 6 Figure 7 Figure 8 Figure 9

Plug the plastic connector back in place. Put the secondary mirror back into its normal position and tighten the east and west secondary mirror clamps and locks. Plug the plastic connector back in place. Move the telescope to Zenith Park position. Install the telescope mount stabilization bar. (The telescope is about to become unbalanced.) (Figure 10) Remove wiring, power cords etc., that are attached to the guide cameras, filter wheel and imaging (HDI) camera. Remove HDI and set it off to the side. (It is not necessary to turn OFF HDI or disconnect the primary cooling cables, connected to the camera.) Remove the telescope optics “corrector/filter wheel” assembly. (Figures 11 & 12) Figure 10 Figure 11 Figure 12

Install the collimator plate/holder assembly. (Figure 13) Install the Takshashi collimator and look into the collimator to inspect the coarse collimation of the telescope. (Figures 14, 15, 16 & 17) Figure 13 Figure 14 Figure 15 Figure 16 Figure 17

To adjust the collimation of the secondary, plug the collimation hand paddle into the port labelled, “J5 COL H.P.” (Figures 18, 19, 20 & 21) When the collimation is done, put the telescope back into its default configuration NOTE: In a later version of this document, we will include a section, where a camera, www.qhyccd.com , is attached to image and collect quantitative collimation data, that will be used to analyze/adjust the concentricity and alignment of the optical components in the telescope. Figure 18 Figure 19 Figure 20 Figure 21