P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot

Slides:



Advertisements
Similar presentations
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
HTC 34; 5656 AE Eindhoven, the Netherlands
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot Authors: Name Affiliation Address Phone email Menzo Wentink Qualcomm Straatweg 66, Breukelen, the Netherlands +31 65 183 6231 mwentink@qualcomm.com Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11z Draft 6.0 to Sponsor Ballot. This document (11-09/0879r0) was approved during the closing plenary session of the 802.11 working group on 17 July 2009. Passed in the Task Group yes 7, no 0, abstain 1 Passed in the Working Group yes , no , abstain Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

5.0 4.0 2.0 3.0 1.0 July 2009 July 2009 doc.: IEEE 802.11-08/xxxxr0 Clause 10 added 2.0 1.0 3.0 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

802.11 WG Letter Ballot Results – P802.11z July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 802.11 WG Letter Ballot Results – P802.11z Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 139 18 Dec 2008 Technical Letter Ballot for TGz draft 3.0 Technical 254 225 89 41 18 155 29 84 143 5 March 2009 First Recirculation Ballot for TGz draft 4.0 Recirculation 230 91 37 16 170 23 88 153 23 June 2009 Second Recirculation Ballot for TGz draft 5.0 232 34 15 183 92 153.1 17 July 2009 After ballot comment resolution 35 188 9 95 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

802.11 WG Letter Ballot Comments – P802.11z July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 802.11 WG Letter Ballot Comments – P802.11z Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 139 18 Dec 2008 Technical Letter Ballot for TGz Draft 3.0 Technical 518 (366 T, 152 E) 143 5 Mar 2009 Recirculation Letter Ballot for TGz Draft 4.0 Recirculation 160 (103 T, 57 E) 153 23 Jun 2009 Second Recirculation Ballot for TGz Draft 5.0 97 (77 T, 20 E) Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

Unsatisfied comments by commenter July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 Unsatisfied comments by commenter Voter LB139 LB143 LB153 Total Matthew Fischer 1 Bill Marshall Darwin Engwer 4 Solomon Trainin Richard Roy 8 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

Unsatisfied Comments – Topics July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 Unsatisfied Comments – Topics Topic #Comments Terminology 4 Power Saving 1 Layering Addressing Editorial Total 8 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

Unsatisfied comments July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell

TGz Timeline Open Close Third recirculation (TGz draft 6.0) 24-Jul-09 July 2009 TGz Timeline Open Close Third recirculation (TGz draft 6.0) 24-Jul-09 8-Aug-09 Clean recirculation (TGz draft 6.0) 25-Sep-09 10-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 19-Oct-09 18-Nov-09 Second sponsor ballot 29-Jan-10 13-Feb-10 Third sponsor ballot 15-Mar-10 30-Mar-10 Fourth sponsor ballot 29-Apr-10 14-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Jun-10 or Sep-10 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell)

July 2009 doc.: IEEE 802.11-08/xxxxr0 July 2009 802.11 EC Motion on Conditional Approval to send P802.11z to Sponsor Ballot Grant conditional approval, under Clause 13, to forward P802.11z to Sponsor Ballot. P802.11z currently has a 95% approval. Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a Moved: <name> 2nd: <name> Yes No Abstain Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Menzo Wentink (Qualcomm), Bruce Kraemer, Marvell