Station and Module Support Frames

Slides:



Advertisements
Similar presentations
Parameterizing a Geometry using the COMSOL Moving Mesh Feature
Advertisements

TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
HERMES tracking for OLYMPUS. Part #1. Detector survey. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
©2006 CSUC Institute for Research in Intelligent Systems Structures June 12, 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
1 ATLAS Muon Spectrometer Alignment LHC Days in Split, 5-9 Oct J.Krstic, M.Milosavljevic Institute of Physics, Belgrade D.Fassouliotis,C.Kourkoumelis,
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Orthographic Drawing Mr. Mclellan Technology Education Westerly High School.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Progress with System Integration of the CBM Silicon Tracking Detector
Baby-MIND Modules & Services
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
CLAS12 Forward Tracking: Status and Challenges
What is Stave Carrier Frame Required to Do?
T. Bowcock University of Liverpool
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
new straw end plug: D=10.6 mm straws support frame Levan option
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Abridged to only those lines which are still POSSIBLE (2007)
INSTALLATION SEQUENCE
Ongoing and to do work M.Lenti.
LumiCal mechanical design, integration with LDC and laser alignment
IHEP group Shashlyk activity towards TDR
Week 2 Experimentation TS Term 2.
Status Brussels GANTRY
OT Survey & Adjustment Outline: Survey technique at present
OT Survey & Adjustment Outline: Survey technique
TOLERANCES - Introduction Nearly impossible to make the part to the exact dimension by any means of manufacturing approach  tolerances of the dimension.
Outer Tracker Nominal Position
BUILDING AN AUTONOMOUS QUADCOPTER.
Beam Finder Wire (BFW) Status
Presentation transcript:

Station and Module Support Frames U.Uwer EDR, June 11, 2003 Station and Module Support Frames Disclaimer: Detailed station and support frame design has started only recently. Therefore don’t expect final drawings. Dowel pins through the precise holes at the module ends are used to support and to position the modules.

Station and Frames in TDR 4 stations with 4 layers each layers mounted on alu frame dowel pins together with precision holes in frame define module position independent supports for +x and –x side no independent movement of stations / layers Maintenance only from top/bottom

Electronics maintenance from top ? 4 cm 25 cm Module difficult if not impossible x u v x Independent movement of xu and vx layers

Revised Station Support Design: Idea: independent quarter stations movable on I-beams Constraints: → from module assembly modules are assembled vertically outside hall → from module positioning module positioning with dowel pins relative position of modules stable in time and reproducible over movements. Time changes: in x<100 microns, in y<1mm, in z<500 microns initial relative x position within quarter station better than 500 microns with respect to nominal z position of module over full length better than1 mm → from IT (support) → from services and maintenance Concept

Detailed Proposal I beams: 1 per OT station 1 per IT station (by Cracow Group)

Translated into 3D CAD Drawings (NIKHEF)

y z x Problems: - half modules cannot be easily positioned in x and z: align and glue them on a template - possible movement / bending of modules in z

Alignment Alignment procedure based on data with following requirements: internal module precision (wires within ±0.1 mm with respect to each other) → only few free parameter to describe the absolute module position absolute module position within mounted frames after assembly better than 0.5 mm (relative position of dowel pins much better than 0.5mm) → exact position of module determined from data within moving unit constrain independent variations of z position of individual modules as well as “bending effects” to ±0.5 mm limit short-term (weeks) variations of module positions to required accuracy RASNIK system to monitor position of “moving units” across movements