LS1@LHC BLM planning 24/02/2014.

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Update on the Laser Beam Line
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
BE-BI Activities and Status: LHC and Injectors
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
BA6 – crab cavity activities in EYETS
Installation of an Instrument on a CERN machine
Building H0209A (G007) (GAP Thorsten Ziglasch, Ina Schurig)
COOLING LHC RACKS PROCUREMENT
K. Foraz on behalf of OSS members
News about the WA104 Programme
Injectors BLM system: PS Ring installation at EYETS
SPS - EYETS 2016/17 Vacuum systems planning
Helium spill in LHC tunnel
Julie Coupard Schedule and Coordination
MPE main activities planned for LS2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
LHC BLM system: system overview
Disabling Rules.
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
BLM planning 03/03/2014.
LS1 status 28/04/2014.
LS1 status 24/03/2014.
07/07/2014 * status, all * AccTest framework
Technical Stop #4 29th August - 2nd September 2011
LS1 status 17/03/2014.
LHC installation status
Re-Installation (days)
Tunnel hardware installation
LS1 status 07/04/2014.
SPS Planning meeting for LS2 #18 Vacuum sectors situation
BLM planning 03/02/2014.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LS1@LHC BLM planning 24/02/2014

Surface racks - ground metallic bar: >5 fixation   P1 -/+, P2 -/+, P5 -/+: change P6 + , P7 +, P8 + : OK Pt3 - dismounted Pt4 : March (Bernd’s request) From: Christos Zamantzas , Seghaier Ben Amor Subject: Rack configuration: R L I C - ground metallic bar: >5 fixation

Tunnel racks and HV divider HV divider installation: L7 – standard cases + R6 – standard cases + R7 and L6 – Special cases – L5: restoration of racks after He spill test Racks – CFC cards : ready for installation ( Ion or Russian team)

BLM and cable trays - Walkways LHC machine Schedule for LS1 EDMS 1357763 20th February 2014

BLM re-installation   From: Marzia Bernardini Sent: 19 February 2014 15:20 To: Slava Grishin Cc: Ewald Effinger; Michel Arnaud Subject: RE: REMINDER- LHC LS1 coordination meeting TOMORROW - 20th Feb. - BLM schedule Dear Slava, I’ll move the installation in sector 81 of 1 week, on 18.03. Concerning sector 23, we’ll see in the coming month. Cheers, Marzia From: Slava Grishin Sent: 19 February 2014 15:14 To: Marzia Bernardini Cc: Ewald Effinger; Michel Arnaud Subject: RE: REMINDER- LHC LS1 coordination meeting TOMORROW - 20th Feb. - BLM schedule Dear Marzia, Could I look at the schedule of BLM installation and some remarks: 1)sector 7-8, start from 24/02 during 3 weeks and walkway removal-reinstallation – is OK. 2)sector 81, start from 11/03 – but it’ll be overlap in 1 week with sector 7-8. Could you move this sector for one week? 3) sector 12 – start from 11.04 during 3 weeks and  walkway removal-reinstallation – is OK. 4)sector 2-3 – start from 22.04 – but it’ll ne overlap in 2 weeks with sector 1-2. 5&6) sector 3-4 and sector 4-5 are OK.

BLM re-installation Sector 6-7 - done Sector 5-6 - done According to LS1 schedule and constrains for ARC+DS Sector 6-7 - done Sector 5-6 - done Sector 7-8 – from today LSS

Start week 13 for the sector 67 General Information Beam Vacuum Pumping in the LSS and Arcs before the start of the cool-down All activities on the stand alone need to be completed before Start week 13 for the sector 67 6th February 2014 LHC machine Schedule for LS1 EDMS 1350481

GLOBAL OVERVIEW: P test & cool down LHC machine Schedule for LS1 EDMS 1350481 6th February 2014

Divers Databases: changes on this week sector 5-6, 6-7 Slot Labels ( after changes of expert names) Rad Source test ( 2 sources – when will be ready?) Label for new “short” cable (BJBDV - BJBAP) Addendum for 50 FICs and Amendment for 1 month* 4 persons prolongation – under signature at CERN ( this week) LIC’s after GIF for installation – middle of March (?) 1 shielding + 1st refilling 1 shielding + 2nd refilling 2 shielding + 1st refilling 2 shielding + 2nd refilling *sagana leaks during the refilling