Walter Reed National Military Medical Center, Bethesda

Slides:



Advertisements
Similar presentations
AIRS/UWA Disaster Response Team: What to Expect When Disaster Strikes I&R Training & Education Conference June 1, 2009.
Advertisements

Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
PROPOSED SECURITY MEASURES David Gourley Elementary.
THORNE GROUP Earthworks : Recycling : Reclamation : Demolition : Dismantling THORESBY LAKE PHASE 1 PRE-SUBSIDENCE WORKS Client: UK COALConsultant: Black.
The NIH Perimeter Security System Protecting the people, research, reputation and facilities of the National Institutes of Health.
Emergency Evacuation Zayed University, Dubai Campus.
PAC/Garage/SCP South Campus Traffic Flow Logistics 6/28/2011.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
A Vision for the Property James 4: Barn House This is what the property looked like when we closed in June. Garage Mt. Zion Road.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Equitas Academy Charter School Conditional Use Permit Review.
TAPA BARRACKS AT/FP EVALUATION 5 JUNE 12.
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Uplands Walk Supportive Housing Community Consultation PUBLIC CONSULTATION WORKSHOP June 2012 UPLANDS WALK SUPPORTIVE HOUSING DESIGNING FOR SAFETY and.
Julius West Middle School Construction Updates
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
McLean Campus at Tysons Corner
Road work season begins Projects kick off in local counties May 19, 2012 By Jason Raiche - staff writer Daily
Planning & Community Development Department 2362 East Washington Boulevard “St. Luke Medical Center” Predevelopment Plan Review City Council Meeting December.
Holland High School Construction Update June 8, 2011.
Elevating the Quality of Life in the District LAFAYETTE ELEMENTARY SCHOOL MODERNIZATION PROJECT UPDATE DECEMBER 15, 2015.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Drop Off and Pick Up Procedures. Front parking lot is reserved for school buses only. If you need to come into the school please enter front.
Siemon & Larsen Outline of New Zoning Code. Siemon & Larsen Goals Eliminating redundant and conflicting provisions An overall update Address concerns.
UNCLASSIFIED DIRECTIONS TO MCIA MCIA, Building 2033 Barnett Avenue, Quantico, VA From the North: Take I-95 South to Exit 150A; and merge onto VA-619E/Joplin.
Security Review for Contractors &Visitors. Security Policy Harley-Davidson’s Security Department participates in the business process as a “best in class”
University of Adelaide HSIS2
Gameday Operations Traffic Parking Transit Fan Safety Communication.
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Jefferson County SA Red Rocks Site Approval
Learning aim B: Explore how sub-structures are constructed
Evacuation Route Power Point
To do your best you must…
UW Medicine Lake Union Phase 2
5th Street Bridge Replacement Project Contract No
Washoe County Board of Adjustment
General Plan Adoption Follow-up
Airport Enterprises Making them Fit.
Baldwin Traffic Simulation Model for the 9th Elementary School Building Committee John Doggett TMM P13 4/25/2017.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Dispatch Options FY 2011 Dale Olmstead, Town Manager
Welcome to ‘project name’
Facilities Report to the Buffalo State College Senate May 6, 2016
Construction 101 Start to Finish
Medical Clinic NOSTRA.
Washoe County Board of Adjustment
Tam O’Shanter Rezoning
La Grange Plaza Rezoning & Site Plans Site Construction Plans Site
Davisville Junior Public School / Spectrum Alternative Senior School
Role of FEMA EHP During Response Activities
Miami Parking Services
TRAFFIC FLOW CHART 9th-12th Pick-Up Area Morning 6th-12th
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Joint Staff Suffolk Arrival and In-Processing Procedures
Gemini Elementary Guide to Volunteering September 9, 2016 DeeDee Hearndon and Jennifer Julian.
City Council Meeting September 17, 2018
City Council Meeting November 14, 2016
House Select Committee on School Safety - Infrastructure and Security Subcommittee Recommendations Charles A. Quagliato, Division of Legislative Services.
Columbia High School Exterior Lighting Upgrade
Washoe County Board of Adjustment June 6, 2019
May 9, 2019.
WELCOME to Jefferson Morgan Middle/High School
June 13, 2019.
Presentation transcript:

Walter Reed National Military Medical Center, Bethesda Town Hall Meeting Hear ye, hear ye! Graphic is architect’s rendering showing additional building being added to the north and south of Building 1. Northern building (left) is outpatient care; southern building is inpatient care. (Note – Graphic should be considered pre-decisional until Environmental Impact Statement Record Of Decision is signed.) ASD(HA) has expressed some concern about current design asserting that it does not “define” the Medical Center; NAVFAC has responded that exterior design could be reworked until as late as March/April 08 but redesign would have to be coordinated with National Capital Planning Commission and State Historical Preservation Organization. Current design has been cleared by those agencies. May 14, 2008 Defining the Future of Military Medicine

Emergency egress points have changed Remember… Construction Fence Phase Yellow – 09 May 2008 Lose access to “F” parking Lose access to Bldg 1 via Wood Rd. Close Lot F - 12 May 2008 Construction Fence Phase Red – 01 June 2008 Lose access to “A” parking (Staff) and “L” parking (visitor) – 14 June 2008 New construction gate of 355/Rockville Pike Construction Trailers arrive – 13 May 2008 Building 12 demolition begins within the week Establish Transition Team Phasing plan from CBB for review by Govt. Emergency egress points have changed Emergency egress points have changed

Phase 1 – Yellow Fence Lines Start Date: 09 May 2008 Fences off area for construction field offices in front of Building 1 Trailers arrive 10 May Prohibits access to Wood Drive in front of Building 1 Eliminates parking in front of Building 1 South fence equipped with a gate to permit emergency access Access to lots A, L, and Presidential Drive not affected Construction of temporary access road to begin in mid-May

Phase 2 – Red Fence Lines Start Date: 01 June – Fence installation 14 June – Close parking lots A&L North - Fences off construction area for Building A and parking garage Interim access to parking lots A & L will be provided through fencing until excavation begins on 14 June South – Creates secure barrier between temporary construction road and the rest of campus Creates new gate from MD 355 for temporary construction road access Establishes a security, badging, and inspection area for construction traffic to be manned by CBB personnel

General Staff Parking Lot D Lot E Lot G Stone Lake Rd Lot K Lot O Lot H Lot I